Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 11-2-18planning & ®eveiopment services Building & C adle (Regulation Division 23co virgiinia Ave Fort P%rce, K 34982 772-462-2172 Fax 772-462-6443 cER79KCATE OF 11 ERM97E 7REA7MEN7 CONSTRUCTION SOIL, TREATMENT PERVIT # : 0105 i� 1 SUILIbER/CONTRACTOR: PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: J217 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. S If,DOMINION 2L Square feet if area treated: as 7� Chemicals used: i Percentage of solution:.os°i° Date of Treatment: Footing 15t Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat• S ADDRESS; EVICT -A BUG TERMITE & PEST CONTROL INC. Total gallons used: 36 M10 ime of Treatment: / 6a Slab ist Treatment � Re -Treat Pools ist Treatment Re -Treat P eter for Final spection Si ure of Exterminator Da COOS ly ell 3 Note: ! There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled Inspection wil/ fall and a re -Inspection fee charged, FB C36®4°206 Certificate of protective Treatment for prevention of termites A weather resisiantjobslte posting board shall be provided to recelve duplicate Treatment Cert/ficates as each required protective treatment /s completed, pro vid/ng a copy for the person the permit is issued to and another copy for the building permit dies. The Treatment Certl�cate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofga/ions used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior treatment shall be completed prior to final bul/ding approval. St Lukie County requires for the ffinai inspection jar co, a permanent Sticker to he pieced on the jiectricai panel box cover, iieting all the treatments and dates of applications- 7/24/2014