HomeMy WebLinkAboutLEAKAGE TEST REPORTEnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
0614diction: 661100
Permit #.
7-J4
Builder: Community: Lot: NA
Address: 5144 CHERRY PALM WAY
City: FT PIERCE State: FL Zip:
MA,
IM"
Ro'l
NEI
eGti IRA, i
7.000
x 60 22610 = 'S'S Method for calculating building volume:
CFM(50) Building Volume ACH(50)
- 0 Retrieved from architectural plans
PASS
0 Code software calculated
When I CH 510) is less than 3, Mechanical Ventilation installation 0 Field measured and calculated
must be verified by building department.
R402.4-1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNETIICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals).
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (9), or 01 or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other 'infiltration
controll measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall he closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Xog '�;g Q 0'.Rz;;'�
U
Nffi- %
Company Name: Pl-.o 2ej c- Phone: 7 7 Z 7
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy conservation requirements according to the compliance method selected above.
Signature of Tester. Date of Test: //,/;? L/-/ �
Printed Name of Tester.
Liceii I se/Cerfification -ro J— 1 z -z- Issuing Authority:
9112/201911:38:36 PM EnergyGauge@ USA 6.0.03 (Rev. 1) - FlaRes2017 F13C 6th Edition (2017) Compliant Software Page 1 of 1
Residential System Sizing Calculation
Summary
JERRY LAWSON Project Title:
5144 CHERRY PALM WAY LAWSON'RESIDENCE
FT PIERCE, FL
9/12/2019
Location for weather data: Fort Pierce, FL - Defaults: Latitude(27.48) Altitude(25 ft) Temp Range(L)
Humidi data: Interior RH 50%
Outdoor
wet bulb 78F Humidity difference 62 r.
Winter design temperature(TMY3 99%) 40
F'
Summer design temperature(TMY3 99%) 91
F
Winter setpoint
70
F
Summer setpoint
75
F
Winter temperature difference
30
F
Summer temperature difference
16
F
Total heating load calculation
42517
Btuh
Total cooling load calculation
44331
Btuh'
Submitted heating capacity
% of talc
Btuh
Submitted cooling capacity
% of calc
Btuh'
Total (Electric Heat Pump)
109.4
46500
Sensible (SHR = 0.75)-
94.9
34875
Heat Pump + Auxiliary(O.OkW)
109.4
46500
Latent
153.2
11625;
Total- Electric Heat Pump)
104.9
46500
WINTER CALCULATIONS
to/infor I-Icnfinn I nori ffnr 1901 cnffl
Load com onent
Load
Window total
342
sqft
9835
Btuh
Wall total
2283
sqft
9808
Btuh
Door total
66
sqft
908
Btuh
Ceiling total
2291
sqft
3289
Btuh
Floor total
2291
sqft
8177
Btuh
Infiltration
103
cfm
3395
Btuh
Duct loss
7105
Stuh
Subtotal
42517
Btuh
Ventilation
0
cfm
0
Btuh
TOTAL HEAT LOSS
42517
Btuh
Smmer Cnniinn I nnrf ffnr 2291 snf
u
Ceilingsi�.iiS}
?i°orsM9?35} _
SUMMER CALCULATIONS
Load component
Load
Window total
342 sqft
15549
Btuh
Wall total
2283- sqft
5231
Btuh
Door total
66 sqft
938
Btuh
Ceiling total
2291 sqft
2302
Btuh
Floor total
0
Btuh
Infiltration
77 cfm
1358
Btuh
Internal gain
6240
Btuh
Duct gain
5126
Btuh
Sens. Ventilation
0 cfm
0
Btuh
Blower Load
0
Btuh
Total sensible gain
36745
Btuh
Latent gain(ducts)
2733
Btuh
Latent gain(infiltration)
3253
Btuh
Latent gain(ventilabon)
0
Btuh
Latent gain(internal/occupants/other)
1600
Btuh
Total latent gain
7586
Btuh
TOTAL HEAT GAIN
1 44331
Btuh
Ceilings(521.46)
Daars{2.1?';j I
Infil.(143.4°ki
DUCIS{1T.7°lul
EnergyGauge@ S�sC�Iz
PREPARq BY:
DATE:
EnergyGaugeO / USRCZB v6.1.03
Infil.ts �3s,
I
::'inda�r�sfS5.1'Joi I
Latent i ntf3.6
i
IniGain(14.1'S