HomeMy WebLinkAboutBLOWER DOOR TEST CERTIFICATION771
Planning & Development Services
File Copy
� & Code' Regulation Division
f it Virginia Ave, lirn 2€1
�dTTt Pierre, F1 34982
pho"- -462- 16S (Fait 772-462.640
LO6i4lEfi DOOit 6 Gf73 FORM
"Olise lnf ftmtiDrt Test Certification
Presaiptive and Performance Method
t dtt
LC tl ate Zone 2,
Test Date;
I bebodingdwelling unit' Oall be tested and verified as•having an air leakage rate of not exceeding 7 air changes per
hour 10 CgMte,Zopo 1, .21and 3 aio hahges per hour 1n Climate Zones 3 through :8.' Testing shall be conducted with a
-blowerdoor at pressure of'0.2 Inches vsr. g.. (50 Pascals), Testing shah be conducted by either individuals as defined In
( )(t) (�
eWore . 3() o ), F2grataa StatOrtes of indiv duets iicensed'as set faO ih-in:Section 489.�t?S 3 g}' car:(j aOM are