HomeMy WebLinkAboutD O H ONSITE SEWAGE TREATMENT DISPOSAL INSPECTION AND FINAL APPROVAL 7-29-19APPLICATION # : AP 1355353
STATE OF FLORIDA PERMIT #:56-SF-1863336
DEPARTMENT OF HEALTH DOCUMENT #:F11311652
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM 07/16/2018
CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:
FEE PAID .515.00
RECEIPT #:56-PID-3620252
APPLICANT:
PLM Construction Consulting LLC
,
AGENT: P2tSi Meltzer
PROPERTY
ADDRESS: 5306 Southwind Trl Fort Pierce, FL 34951
4 0 . _ _
dUt.tt: L'ou �4v
LOT:
BLOCK:
SUBDIVIS ON:
I
ID#: 1407.432-0003-000-8
CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED.
TANK INSTALLATION
SETBACKS
[ ] [61]
TANK SIZE [1] 1090.00 [21
[ ]
[27]
SURFACE WATER
FT
[ ] [921
TANK MATERIAL Polypropylene
[ ]
(281
DITCHES 39
FT
[ ] [031
OUTLET DEVICE
[ ]
1291
PRIVATE WELLS 75
FT
[ ] [U4J
MULTI -CHAMBERED [LIJ N ]
[ ]
1301
PUBLIC WELLS
FT
[ ] (05]
OUTLET FILTER Polylok PL-68
[ ]
[311
IRRIGATION WELLS
FT
[ ] [b6]
LEGEND 1. 70-143-11DC4 2.
[ ]
[32]
POTABLE WATER 67
FT
[ ] [07]
WATERTIGHT
[ ]
[331
BUILDING FOUNDATIONS 7
FT
[ ] [08]
LEVEL
[ ]
[341
PROPERTY LINES 39
FT
[ ] 109]
DEPTH TO LID
[ ]
(351
OTHER
FT
DRAINFIELD INSTALLATION
FILLED / MOUND SYSTEM
( ] 110]
AREA [1] 679.2 [21 SQFT
[ ]
[36]
DRAINFIELD COVER
[ ] [111
DISTRIBUTION BOX HEADER X
[ ]
[371
SHOULDERS
[ ] [I21
NUMBER OF DRAINLINES 1..6.00 2.
[ ]
[381
SLOPES
[ ] [I3].
DRAINLINE SEPARATION
[ ]
[391
STABILIZATION 07/29/2019
[ ] [I4]
DRAINLINE SLOPE
[ ] [1i5]
DEPTH OF COVER
ADDITIONAL INFORMATION
[ ] [l6]
ELEVATION [ ABOVE / BELOW ]BM 42.00
[ ]
[401
UNOBSTRUCTED AREA
[ ] [17]
SYSTEM LOCATION
[ ]
[411
STORMWATER RUNOFF
[ ] [18]
DOSING PUMPS
[ ]
[421
ALARMS
[ ] [191
AGGREGATE SIZE
[ ]
[43]
MAINTENANCE AGREEMENT
[ ] [20]
AGGREGATE EXCESSIVE FINES
[ ]
[44]
BUILDING AREA
[ ] [2;]
AGGREGATE DEPTH
[ ]
[45]
LOCATION CONFORMS WITH SITE PLAN
[ ]
(46]
FINAL SITE GRADING
FILL
/ EXCAVATION MATERIAL
( ]
[47]
CONTRACTOR MICHAEL W STUHR (ASHTO
[ ] [22]
FILL AMOUNT
[ ]
[48]
OTHER INFILTRATOR Quick4 Plus EQ36 LP
[ ] [23]
FILL TEXTURE
( ] [24]
EXCAVATION DEPTH
ABANDONMENT
[ ] [25]
AREA REPLACED
[ ]
149]
TANK PUMPED
[ ] 1261
REPLACEMENT MATERIAL
[ ]
[50]
TANK CRUSHED 6 FILLED
Comments:)
Comments are on page 2.
I
I
�
ucie CHD DATE: 06/06/2019
CONSTRUCTION ( APPROVED DISAPPROVED ]
n o mental S ecialist II Brian J ram (ENVIRONMENTAL HEALTH)
FINAL SYSTEM ( APPROVED / DISAPPROVED ]: St. Lucie CHID DATE: 07/29/2019
Environmental Specialist I Hunter A Collier epartment of Hea
(Explanation} of Violations on following page)
DH 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC Page 2 of 3
EH Database v 1.0.1 AP1355353 EID1863336
The system is sized for 3 bedrooms with a maximum occupancy of 6 persons _(2 per bedroom), for a total estimated flow of 400
gpd• 1I
New ST, filter, and 6x10 long bed DF installed. No violations, system ok to cover. Contractor notified by phone. Needs final
inspection for well inspection/setback, potable water line setback, filled system,, and final site grading.
Final system approved. Contractor and building department emailed final approval.
I
I
DH 4016, 18/09 (obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC
EH Database v 1.0.1 AP1355353 EID1063336
Page 2 of 3