ACCEPTANCE OF COMPLETION OF CONSTRUCTION FOR APPROVAL TO PLACE A POTABLE WATER
DISTRIBUTION SYSTEM INTO OPERATION
Permittee: Michael DeBock, Vice President
Date: 09J10/2014
Permit Number: W13-006
Address: Standard Pacific of Florida PWS Id No: 4560954
15360 Barranca Parkway
Irvine, CA 33609
PSLUSD Project No: 5163
RE: Riverbend Subdivision Onsite Water Main — Entire Project
1,575 LF of 6" Water Main and 2,380 LF of 811,Water Main
We are in receipt of your Request for Approval to Place a Water Distribution System into Operation,
for the project authorized by the above referenced permit number that the subject water main distribution
system extension has been constructed, tested, and disinfected in accordance with the plans and related
materials permitted by this agency, and is now ready for operation.
Based on your engineer's certification of construction completion, satisfactory bacteriological results, and the
pressure & leakage test report for the above -referenced project, the project is hereby released for service in
substantial accordance with the approved plans with the understanding that the project will be operated in
compliance with Florida Administrative Code (F.A.C.) Chapter 62-604.
Approval of individual connections to a completed distribution system must be obtained from the City of Port St
Lucie Utility Systems Department, separate of this notice by a Letter of Acceptance by the Utility Director or his
designee.
/aT
Laney Southerly, PE
PSLUSD Engineering Manager
C: Jesus A. Merejo,'Director, Utility Systems Department
PSLUSD Permit Manager
Project Manager