Loading...
HomeMy WebLinkAboutLETTER ABOUT ACCEPTANCE OF COMPLETION OF CONSTRUCTION - PORTABLE WATERCITY OF PORT ST. LUCIE '& UTILITY SYSTEMS DEPARTMENT 900 SE Ogden Lane Port St. Lucie, FL 34983 (772) 873-6400 — TDD Accessible �C' �I ° �osro� (772) 871-6715 —FAX S®� Jesus A. Merejo, Director ACCEPTANCE OF COMPLETION OF CONSTRUCTION FOR APPROVAL TO PLACE A POTABLE WATER DISTRIBUTION SYSTEM INTO OPERATION Permittee: Michael DeBock, Vice President Date: 09J10/2014 Permit Number: W13-006 Address: Standard Pacific of Florida PWS Id No: 4560954 15360 Barranca Parkway Irvine, CA 33609 PSLUSD Project No: 5163 RE: Riverbend Subdivision Onsite Water Main — Entire Project 1,575 LF of 6" Water Main and 2,380 LF of 811,Water Main We are in receipt of your Request for Approval to Place a Water Distribution System into Operation, for the project authorized by the above referenced permit number that the subject water main distribution system extension has been constructed, tested, and disinfected in accordance with the plans and related materials permitted by this agency, and is now ready for operation. Based on your engineer's certification of construction completion, satisfactory bacteriological results, and the pressure & leakage test report for the above -referenced project, the project is hereby released for service in substantial accordance with the approved plans with the understanding that the project will be operated in compliance with Florida Administrative Code (F.A.C.) Chapter 62-604. Approval of individual connections to a completed distribution system must be obtained from the City of Port St Lucie Utility Systems Department, separate of this notice by a Letter of Acceptance by the Utility Director or his designee. /aT Laney Southerly, PE PSLUSD Engineering Manager C: Jesus A. Merejo,'Director, Utility Systems Department PSLUSD Permit Manager Project Manager FOR Project File Page 1 of 1