Loading...
HomeMy WebLinkAboutblower door i er q F Envelope Leakage Test Report Blower Door Test � Residential Prescriptive, Performance or ERI.Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition jurisdiction: Permit*, job Information Builder: 6HO c''�?c Community: Mecthw oo'b Lot Address: 36/7 n Ve- f Unit: City: Fr4 State: F-L Zip: Air Leakage Test Results Passingreurltsmiwrneete#her the Perfwmance,Pimcrlpft or EN OPREsciupr a METHOD-The-building or dwelling unit shall be tested and.verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2inch w.g.(50 pascals)in Climate Zones 1 and 2. V PERFORMIWGE or ERI METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50)value,as shown on FORM R40S-2017(Performance)or R406-2017(ERq,section labeled as infiltration, sub-section ACH. ACH(50)specie led on Form R405-2017-Energy Calc(Performance)or-R406-2017(ERO. 121 x 60 : r �"I = �' Method far calculatlogr building volume., CFM(50) Building Volume ACH(50) O Retrieved from.architectural puns ®PASS QFAIL Code software calculated []When ACH(SO)is less than 3,Mechanical Ventilation O Feld measured and calculated Installation must be verged by building department. Testing.Testing shall be conducted in accordance with ANSURESNETACC 380 and reported at a pressure or 021nche w&(50 Pascals).Testing shall be conducted by either individuals as defined In Section 5S3.993(5)or(7),Ronda Statues,or individuals licensed as setforth in section 489.105(3)(f),(g),or{i)or an approved third party.A:written report of the results of the test shall be signed by the party conducting the test and j provided to the code official.Testing.shall be performed at any time after creation of all penetrations of the bulldog thermal envelope. gyring testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust,Intake,makeup air,back draft and flue dampers shail.be closed,but not sealed beyond intended infiltration control measures. Wnterior doors,if installed at the time of the test,shall be open. 4.Exterior doors for continuous ventilation systems and heat recover yvendlators shall be closed and sealed. S.Heating and cooling systems;if installed at the time of the test,shall be turned off. 6-Supply and return registers,if installed at the time of the test,shall be fully open. Testing Company Company Name: UES,Universal Engineering Sciences Phone: 772-924-3575 1 hereby verify that the above Air leakage re Its are In accordance with the 2017 6th.Edition Florida.Building Code.Energy Conservation requirements actor Ing to t mpliance method selected above. Signature of Tester: Date of Test: q/ZS Printed Name of Tester. Trevor LaPorte. License/Certification#: 5064780 Issuing Authority: BPI