HomeMy WebLinkAboutblower door C.£,:vfafape Leakage YC t fze�ort mio er Door Test) ��� ��s
Residential Prescriptive, Performance or ERI Method Complianl> ��, d6
2017 Florida Building Code, Energy Conservation, 6th Edition 6
Jurisdiction: Permit#: 2 D!Z_ —06;6 s
job Information
Builder: Community: Lot:
Address: Cr 3 /�� ��f 4o" Unit:
(JirrG
City: � State: F L Zip:
Air Leakage Test Results Passing results must meet either the Performance,Prescriptive,or ERI Method
OPRESCRIPTIVE METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g.(50 pascals)in Climate Zones 1 and 2.
OPERFORMANCE or ERI METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50)value,as shown on FORM R405-2017(Performance)or R406-2017(ERI),section labeled as Infiltration, sub-section ACH.
ACH(50)specified on Form R405-2077-Energy Calc(Performance)or R406-2017(ERQ: 7 Q Cl
15 2 3 X 60 = , 5 6 — Method for calculating building volume:
CFM(50) Building Volume ACH(50) 0 Retrieved from architectural plans
®PASSFAIL O Code software calculated
f_]When ACH(50)is less than 3,Mechanical Ventilation O Field measured and calculated
installation must be verified by building department.
Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure or 0.2 inche w.g.(50 Pascals).Testing
shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statues,or individuals licensed as set forth in Section
489.105(3xf),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the parry conducting the test and
provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope,
During testing
1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration
control measures.
2.Dampers including exhaust,intake,makeup air,back draft and flue dampers shall be dosed,but not sealed beyond intended infiltration control
measures.
Rinterior doors,if installed at the time of the test,shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5.Heating and cooling systems,if installed at the time of the test,shall be turned off.
6.5upply and return registers,If installed at the time of the test,shall be fully open.
Testing Company
Company Name: UES, Universal Engineering Sciences phone: 772-924-3575
1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the co 61I' nce method selected above.
Signature of Tester:
G L, Date of Test:
Printed Name of Tester: Trevor LaPorte
g Authority:5064789 Issuing BPI
License/Certification#: ty.