PROP I AL SUBMITTED• TO: St. LucCoun Meryt
Dab e• i b N m: y C°��l6�6,
mer• Custo• i%1 �,� ;� ?!
Job Lo�at, SL -z V �� S f, `�°0BIi10"
Phonek i �r . so q- � 1 Email: l2� W.- A 1 (,011
JOBS PT3,QN:fV12A'a"
emove xisting roofing and• install new asphalt shingles, j
S=Ege
r:,_`0 �. � \ �", Ks 7- �V x
Dolor:_ `� ti x �j u
ATLAS PRISTINE PINNICLE:
• Provide teof}ng�J rm�t L Install all new valley metal 16" 26ga set in plastic roofing cement. (If
• P o�fi a trash\re o al to a legal off -site facility required)
• Reigiove existing roofing down to the wood deck Intall nw drip edge 3" x 3" aluminum
• Replace all bad decking (_ � sheets included additional sheets Install new Low Profile Ridge Vent/Cobra Ridge Vent X
billed at $80.00 each) Install new exhaust vents (Galvanized) and lead boots
• Re -nail deck as required by Hurricane Mitigation Retrofit Manual Install ATLAS PINNACLE STARTER SHINGLE
(Based on 553.844 F.S.) Install ATLAS PINNACLE PRISTINE PRO -CUT
• hgsst`a mninir60 underlayment Install ATLAS PRISTINE LIFETIME 130 MPH SCOTCH GUARD
SHINGLE $"
AD ITIOITEM:
• Install ATLAS Weather Master SA underlayment in valleys and eaves $
• Install ATLAS Weather Master SA underlayment on entire deck $
(Recommended) Qualifies as a Secondary Water Resistance (SWR):
SWR (also called Sealed Roof Deck) Self -adhering polymer modified -bitumen roofing underlayment applied directly to the
sheathing or foam adhesive SWR barrier (not foamed -on insulation) applied as a supplemental means to protect the
dwelling from water intrusion in the event of roof covering loss.
• Install Atlas Gorilla Guard 30 Engineered Felt on entire deck $
LATE ROOF:
• Provide roofing permit
• Provide trash removal to a legal off -site facility
• Remove existing roofing down to the wood deck
• Rolace�allebac flecking ( sheets-irrehrdedadditionaLsheets
• Re,-riail ec , as required by • on anual
(Ba jea,o 'S5 :844 F.S . 'E
t-, I v
• Install CERTAINTEED �1i;T v'A'i' ' IRE BASE/PLY
• Install CERTAINTEED FLINTLASTIC-GTA CAP SHEET
• Install new primed drip edge 3: x 3" aluminummith-Matrix-=-Zo1
Premium SBS Flashing Cement = "i ., "i
• Install new metal 16" - 26ga set in Matrix 201 Prerm
Flashing Cement at sloop roof tie-in
WIND MITIGATION:
• Southeast General Contractors Group, Inc. will provide a Wind Mitigation Report for an additional fee of $175.00
NOT INCLUDED:
Gutter
ADDITIONAL ITEMS:
s
Metalfascia trim
Plywood: ......................................................
Fascia: ...........................................................
Cost $80.00 per sheet labor and material
Cost $18.801/f labor and material
Metal roof structures
Satellite dish removal or replacement
Second layer removal: ................................
Chimney flashing: ......................................
Cost $28.00 per square
Cost $225.00 plus stucco if required at $37.50 s/f
Screens and screen enclosures
Solar beater removal or replacement
Flashing, step, counter or base: .................
Gutter
per
Cost $17.25 l/f labor and material
Skylights
Truss repair
removal: ...........................................
Rafter tail repairs: .......................................
Skylight
Cost $ .50
Cost $120.00 each
replacement and flashing:..........
Cost $475.00 each
Stucco repair ...............................................
Cost $37.50 per square foot
1. Chang(
reflect t
Owner
2. Southe,
workm
3. Labor
4. Same a
upfront
rating.
5. Existmt
attempt
GENERAL TERMS AND CONDITIONS
Orders, contractor may accept a "change order" to the plans, specifications or equipment. In addition, the total price increased or decreased to
`xe change, and the same shal be in writing and signed by the Owner and Contractor. Any increase to the contract price shall be paid by the
.tpon ordering the work called for in such -change order or upon execution of the change order as required by the contractor.
st General Contractors Group, Inc. is responsible for completion of work in compliance with contract documents and for quality of material and
unship in accordance with standard specifications.
� ranty/5 year on workmanship. Material Warranty 30-year limited warranty.
a (SAC) Financing (3, 6,12, 18, 24 months) options will require an additional upfront fee. Standard (1-12) yyears financing is offered with no
I All financing is contingent upon credit approval. Standard Home Improvement financing offered from 9.99% APR for A and A+ credit
southeast General Contractors Group Inc. partners with EnerBank Improvement loans.
gutters will be removed or detached to allow for the installation of the new roofing system. Sourtheast General Contractors Group, Inc. will
to save the gutters but in the event they are damaaged the Owner accepts full responsibility for said gutters.
N
h
14x _ Cem -,- c t�"aibb:? :Lxt? 4e-y
WIND MITIGATION:
• Southeast General Contractors Group, Inc. will provide a Wind Mitigation' Report for an additional fee of $175.00
NOT INCLUDED:
ADDITIONAL ITEMS:
Gutters
Metal fascia trim
Plywood:...................................................... Cost $80.00 per sheet labor and material
Fascia:
Metal roof structures
............................ a .............................. Cost $18.801/f labor and material
Second layer removal: ................................ Cost $28.00 per square
Satellite dish removal or replacement
Screens and screen enclosures
Chimney flashing: ...................................... Cost $225.00 plus stucco if required at $37.50 per s/f
Flashing, step, counter or base: Cost $17.25 1/f labor
Solar heater removal or replacement
................. and material
Gutter removal: ........................................... Cost $
Skylights
Truss repair
.50
Rafter tail repairs: ....................................... Cost $120.00 each
Skylight replacement and flashing:.......... Cost $475.00 each
Stucco repair ............................................... Cost $37.50 per square foot
GENERAL TERMS AND CONDITIONS
1. Change Orders, contractor may accept a change order" to the plans, specifications or equipment. In addition, the total price increased or decreased to
reflect the change, and the same shal be in writing and signed b the Owner and Contractor. Any increase to the contract price shall be paid by the
Owner upon ordering the work called for in such changge order or upon execution of the change order as required by the contractor.
2. Southeast General Contractors Group, Inc. is responsible for completion of work in compliance with contract documents and for quality of material and
workmanship in accordance with standard specifications.
3. Laborl'Warrantyty/5 year on workmanship. Material Warranty 30-year limited warranty.
4. Same a Cash (SAC�Financing (3, 6, 12, 18, 24 months) options will require an additional upfront fee. Standard (1-12) yyears financing is offered with no
upfront fees. All financing is contingent upon credit approval. Standard Home Improvement financing offered from 9.99% APR for A and A+credit
rating., Southeast General Contractors Group Inc. partners with EnerBank Improvement loans.
5. Existing gutters will be removed or detached to allow for the installation of the new roofing system. Souttheast General Contractors Group, Inc. will
atte_ mppt to save the gutters but in the event they are damaaged the Owner accepts full responsibility for said gutters.
We hereby propose to furnish labor and materials complete in accordance with the above specifications, for the sum of $
Schedule of lvralues:
Deposit: Is due upon executing this contract. $ ` (� 0 (J } r { ]
Draw #1: Is 'due when the roof is dried -in, before shingles are delivered. $_
Draw #2i Is due upon the final inspection.
All material is guaranteed to be as specified. All work to be completed in a workman like manner according to standard practices. Any alteration or deviation from above
specifications involving extra cost, ivill be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements are contingent
upon strlkes, accidents or delays beyond our control. This proposal subject to acceptance within 10 days and is void thereafter at the option of the undersigned.
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.
AUTHORIZED ACCEPTED ❑
��' ✓" 1 �f s Date _ ', `' d) Signature. / lt' cailMld' Date
Southeast —t—
General Contractors Group, Inc.
Signature: Date