Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONDate. Contractor:�"� Construction: Est Construction Test Date: Time: Indoor Temperature (F): %3 Outdoor Temperature (F): Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 RECEI7oig 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE FEB 7Duct Sealing CertificationPrescriptive and Performance Method ST, LuciQ Countnittin - -°- g Permit#: CV-7 ( Lot#: Address: ❑ Rough -in Test SCANNED _ . BY Floor Area (ft2): 14s�� Primary Location of Supply Ductwork -7 Primary Location of Return Ductwork 97 1 OW LMaRnye 1 C1L JUUMUe1 Duct Leakage: ❑ Qefault ❑ Prop. Leak Free oposed On = ©.� Test Pressure: 23 (Pa) Ipg Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) I Flow Ring I Fan Press I Flow (din) I Results: Wass ❑ Fail Total Leakage (cfm): Total Leakage per 100 sgft: 0- CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. s i estmgi t.ompanv Compa ly Name: `�` �� f�`e r� Address: -7 -7 (es I hereby) certify that the above Duct Sealing Leakage results demonstrate compliance with P Edition FBC Energy Conservation requirements in accordance with Section R40 r� Printed Name: Ate` or-, 6j gt''-%% 1-k— License/Certificate#: Gt 0 � Certificate of Achievement THIS ACKNOWLEDGES THAT Aaron Overholt HAS MET THE STANDARD REQU I RED BY RESNET, AS A CERTIFIED RATING FIELD INSPECTOR Certification Date: 08/07/2018 Certification Expires: 08/07/202'1 5:F RFI # 2GNAB7 2 Tim Smith, RESNET Quality Assurance Designee 1-5- htye-a--rs----- =14ENERGY SERVICES NETWORK Provider • • • • C