HomeMy WebLinkAboutEPL DISPLAY CARDI
I
FORIV R405-2017
ENERGY PERFORMANCE LEVEL (EPL)
DISPLAY CARD SCANNED
ESTIMATED ENERGY PERFORMANCE INDEX* = 97 By
The lower the EnergyPerformance Index, the more efficient the home. dude County
1. New construction or existing
2. Single family or multiple family
3. Numbl er of units, if multiple family
4. Number of Bedrooms
5. Is this a worst case?
6. Conditioned floor area (ft2)
7. Windows- Description
a. U-Factor: Dbl, U=0.54
SHGC: SHGC=0.31
b. U-Factor: Dbl, U=0.63
SHGC: SHGC=0.32
c. U-Factor: N/A
SHGC:
d..U-Factor: N/A
SHGC:
Area Weighted Average Overhang Depth:
Area Weighted Average SHGC:
8. Floor Types
a. Slab -On -Grade Edge Insulation
b. N/A'
c. N/A
I
5324 Oakland Lake Cir, Ft. Pierce, FL,
New (From Plans)
9. Wall Types
Insulation
Area
Single-family
a. Concrete Block - Int Insul, Exterior
R=4.1
1265.30 ft2
b. Frame - Wood, Adjacent
R=11.0
251.33 ft2
1
c. N/A
R=
ft2
3
d. N/A
R=
ft2
10. Ceiling Types
Insulation
Area
No
a. Under Attic (Vented)
R=30.0
1452.00 ft2
1452
b. N/A
R=
ft2
c. N/A
R=
ftz
Area
11. Ducts
R ft2
98.67 ft2
a. Sup: Attic, Ret: Main, AH: Main
6 290.4
33.33 ft2
12. Cooling systems
kBtu/hr
Efficiency
ft2
a. Central Unit
23.2 SEER:14.00
ft2
13. Heating systems
kBtu/fir
Efficiency
a. Electric Heat Pump
23.2
HSPF:8.20
1.000 ft.
0.313
Insulation
Area
14. Hot water systems
Cap: 50 gallons
R=0.0
1452.00 ft2
a. Electric
EF: 0.9
R
ft2
b. Conservation features
R==
ft2
None
15. Credits
Pstat
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature: v �, Date:
Address if New Home: __b37D*L\CtW l qyqp C�� f City/FL Zip: r'
"Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida EnergyGauge Rating. Email EnergyGauge tech support at
techsbpport@energygauge.com or see the EnergyGauge web site at energygauge.com for information and a list of
certified Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building
Commission's support staff.
required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
18 11:16 AM EnergyGauge® USA - FlaRes2017 - Section R405.4.1 Compliant Software Page 1 of 1
1
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Lot 017 F1452 A RHG - S Builder Name: Ryan Homes
Street: 5324 Oakland Lake Cir Permit Office: St. Lucie
City, State, Zip: Ft. Pierce , FL, Permit Number:
Owner: Jurisdiction: 661000
Design Location: FL, Fort Pierce
1 '
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The _air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity with
sealed.
a material having a thermal resistance of R-3 per inch
Knee walls shall be sealed.
minimum.
Exterior thermal envelope insulation for framed walls
shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts,j penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrowjcavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be for between the garage and conditioned spac
3s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
i
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Shower%tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
fir rink! lates and walls or ceilina
a. In addition, inspection of log walls shall be in accordance with the provisions of [CC-400.
9/4/2018 11:16 AM EnergyGaugeOO USA - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1