Loading...
HomeMy WebLinkAboutEPL DISPLAY CARDI I FORIV R405-2017 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD SCANNED ESTIMATED ENERGY PERFORMANCE INDEX* = 97 By The lower the EnergyPerformance Index, the more efficient the home. dude County 1. New construction or existing 2. Single family or multiple family 3. Numbl er of units, if multiple family 4. Number of Bedrooms 5. Is this a worst case? 6. Conditioned floor area (ft2) 7. Windows- Description a. U-Factor: Dbl, U=0.54 SHGC: SHGC=0.31 b. U-Factor: Dbl, U=0.63 SHGC: SHGC=0.32 c. U-Factor: N/A SHGC: d..U-Factor: N/A SHGC: Area Weighted Average Overhang Depth: Area Weighted Average SHGC: 8. Floor Types a. Slab -On -Grade Edge Insulation b. N/A' c. N/A I 5324 Oakland Lake Cir, Ft. Pierce, FL, New (From Plans) 9. Wall Types Insulation Area Single-family a. Concrete Block - Int Insul, Exterior R=4.1 1265.30 ft2 b. Frame - Wood, Adjacent R=11.0 251.33 ft2 1 c. N/A R= ft2 3 d. N/A R= ft2 10. Ceiling Types Insulation Area No a. Under Attic (Vented) R=30.0 1452.00 ft2 1452 b. N/A R= ft2 c. N/A R= ftz Area 11. Ducts R ft2 98.67 ft2 a. Sup: Attic, Ret: Main, AH: Main 6 290.4 33.33 ft2 12. Cooling systems kBtu/hr Efficiency ft2 a. Central Unit 23.2 SEER:14.00 ft2 13. Heating systems kBtu/fir Efficiency a. Electric Heat Pump 23.2 HSPF:8.20 1.000 ft. 0.313 Insulation Area 14. Hot water systems Cap: 50 gallons R=0.0 1452.00 ft2 a. Electric EF: 0.9 R ft2 b. Conservation features R== ft2 None 15. Credits Pstat I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant features. Builder Signature: v �, Date: Address if New Home: __b37D*L\CtW l qyqp C�� f City/FL Zip: r' "Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida EnergyGauge Rating. Email EnergyGauge tech support at techsbpport@energygauge.com or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 18 11:16 AM EnergyGauge® USA - FlaRes2017 - Section R405.4.1 Compliant Software Page 1 of 1 1 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Lot 017 F1452 A RHG - S Builder Name: Ryan Homes Street: 5324 Oakland Lake Cir Permit Office: St. Lucie City, State, Zip: Ft. Pierce , FL, Permit Number: Owner: Jurisdiction: 661000 Design Location: FL, Fort Pierce 1 ' COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceiling/attic The _air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with sealed. a material having a thermal resistance of R-3 per inch Knee walls shall be sealed. minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. Shafts,j penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrowjcavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be for between the garage and conditioned spac 3s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building i shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Shower%tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids fir rink! lates and walls or ceilina a. In addition, inspection of log walls shall be in accordance with the provisions of [CC-400. 9/4/2018 11:16 AM EnergyGaugeOO USA - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1