Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE05-20-'19 15:46 FROM- Renar Homes 772-692-9155 T-551 P0001/0001 F-302 Date: I Project Address: I Planning -4. Development Services Building & .Code Regtilabion Division 2306'Viirginia Ave - Fort Pierce, FL 34982 772-462-216S Fax 772-462-6443 st for 30-bay Temporary Po/ er Release Permit Number: G e�I!e - �. SCANNED BY St Lucie County THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE A80VE'DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PORPO5.E:OF TESTING SYSTEMS SAND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTxON. IN CONSIDERATION OE APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1, This temporary power release is requested for the -above stated purpose -only,. and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree.to abide by all terms and conditions of this agreement, including Building UMsion Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled "Requirements far 30 Day Power for Testing" have' been fulfilled and the premise is ready for compliance- inspection, 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work' Order issued if the Anal Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE. NOW OR -IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OP THIS AGREEMENT. SIGNATURE V,/ F DATE DATE DATE