HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning:.&..Development_$ervices..,--......I
Building &,,.Code Regulation Division V
2300 Virginia Ave, Rm 201
Fort.Pierce,. FL 34982!>•...,; h,.f.• t..
772462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
_ .._..Date:. Loth;. ! _.... _......_.._._._.. _...._.._
._... K.D rat
Contractor: ���� -� Address:
Construction: .AWdst Construction Test ❑ Rough -in Test
SCANNED
Test Conditions: By
St Lucie COUn 445- Z
Date: � Z Floor Area (ft2): • Time: Primary Location of Supply Ductwork Tr
Indoor Temperature (F): Z l% Primary Location of Return Ductwork
Outdoor Temperature (F): " 7 1
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free Wroposed On = �• d
TestPressure: (Pa) ,
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ❑ Pass ❑ Fail
Installed Pa Z�
C c.' Total Leakage (cfm):
Total Leakage per 100 sgft:
I
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sgft.
i
Testing Comaan
Company Name: is Address: - 7Ce
hereby certify that the ab4ve•Bust Sealing Leakage results demonstrate compliance with 51h Edition FBC Energy Conservation requirements in accordance with
Section 11403.UT-,
Signalture: �
Printed Name: ���� e) P-e--.4 o /` License/Certificate #: �
r
Certificate of Achievement
THIS ACKNOWLEDGES THAT
Certification Date: 08/07/2018
Certification Expires: 08/07/2021
RFI # 2GNAB7
Tim Smith,
RESNET Quality Assurance Designee
-t--y-e- ar s-
RESIDENTIAL ENERGY SERVICES NETWORK
QA Provider.. . •