Loading...
HomeMy WebLinkAboutFIELD - LAB REPORTI l UES Project No.: 0310.1700251.0030 UNIVERSAL Date Typed: November 02, 2018 It ENGINEERING SCIENCES Consultants In: Services a Mal Engineering • Environmental pectin ( �D`9 D(D-70 Geophysical Services •Materials Testing •Threshold Inspection I 09 Building Code Administration, Compliance Inspection & Plan Review 820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978 Construction Materials Testing Services FIELD AND LABORATORY REPORT COVER PAGE SCANNED Client:, Ryan Homes BY 1450 Centrepark Blvd Suite 340 FILE COPY -St LuC!a County West Palm Beach, FL 33401 .p FCF Project: Oakland Lake Subdivision Lot 17 10, y07/ rLFn 5324 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL s �o ,9 g As requested, Universal Engineering Sciences, Inc. (LIES) representative(s) performed construction materials a and/or field inspection services on the above project. Testing results and/or inspection observations are reported on the d sheets! The contents of this package are summarized below: Scope of Work Work drder No. Date Type of Report 102331-1 11/01/2018 In -Place Density Test Report w/Activity Record We hope this information is sufficient for your immediate needs. It you nave any questions, please do not nesitate to contact the undersigned. PROVED 0 APPROVED AS NOTED REVISE & RESUBMIT 0 REJECTED/RESUBMIT ❑ NOT REVIEWED 0 FOR YOUR INFORMATION T `\N���� Sub ittals are reviewed for conformance with design intent and general compliance with the Contract Documents only. Notations Do Not Authorize Changes to Contract Sum. ►�O. 43796 Apprbval, comments and/or corredtions does not relieve the, - Contractor from compliance with the Contract Documents. The Cunt actor is responsible for confirming and correlating all .. STATE OF �i(��� quantities, dimensions, tolerances, clearances, fabrication proc sses, techniques and sequences of construction, �' •'�L(N�1t7�.�'`�N ' �,,sc':......yGR��• coma„bility of materials and methods, coordination of their work, with other trades and subcontractors, performance of lllIIj� tit00 work, in a safe anq satisfactory manner wmpi.ance 'hnth the Con act nits. :711 RDLOWIJ BY Sincerely, Universal Engineering Sciences, Inc. Certificate of Authorization No. 00000549 Richard E. Hoaglin, P.E. 2018.11.02 11:58:14 Richard E. Hoaglin, P.E. FLORIDA_ Professional Engineer No. 48796 A. S. DESI ®ROUP This item has been electronically signed and sealed by Richard E. Hoaglin, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. [CC Em Iil: cbugg@nvrinc.com; elibrihi@nvrinacom; Imhoff, Bryan [BIMHOFF@nvrinacom]; jomcalli@nvrinc.com; rofingar@nvrinacom; sign/seal MAIL to ryan homes at�1777 Willows Square, Vero each, FL 32966 ST. LUCIE COUNTY BUILDING DI ION REVIEW D FOR C PLIANCE REVIE DATE PLANS AND P RMIT MUST BE KEP• "• JOB SITE OR �O INSPECTION(S) WIL E MADE i UES Project No: 0310.1700251.0030 UNIVERSAL UES DOCS No: UES Report No: 102331-1 ARC 110118 • ENGINEERING SCIENCES On -Site Time (hrs): 1.00 Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00 Geophysical Services • Materials Testing • Threshold Inspection Travel Time (hrs): 0.50 , Building Code Administration, Compliance Inspection & Plan Review Total Time (hrs): 1.50 B 820 revard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978 Activity Record Client: Ryan Homes 1450 Centrepark Blvd Suite 340 West Palm Beach, FL 33401 Project: Oakland Lake Subdivision Lot 17 5324 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL DateIof Activity: Thursday, 01 November, 2018 Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of earthwork testing for the House pad. Whilei on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. The Contractor was notified of the test results or a copy was left for their records. \ F UNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Materials Testing • Threshold Inspection Building Code Administration, Compliance Inspection & Plan Review 820 Bre�vard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978 UES Project No: 0310.1700251.0030 UES DOCS No: UES Report No: 102331-1 DT 110118 In -Place. Density Test Report Client: Ryan Homes 1450 Centrepark Blvd Suite 340 West Palm Beach, FL 33401 Project: Oakland Lake Subdivision Lot 17 5324 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL Area Tested: House pad Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 11/01/2018 Lab: ASTM D1557 Modified Proctor Tech , ician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test No. Location of Test Range Depth (inch) Proctor (2) Field Dry Density (PCF) Field Moisture % % Compaction Comments (3) 1 /W test 0-1 ft 12.00 7442 110.5 10.8 99 A 2 N/E test 0-1 ft 12.00 7442 108.5 10.0 97 A 3 S/E test 0-1 ft 12.00 7442 111.1 11.0 99 A 4 S/vv test 0-1 ft 12.00 7442 109.0 10.3 97 A Ref. Datum: 0 = Top of Final Grade Maximum Optimum Proctor Dry Moisture # Density Content 7442 112.0 11.0 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This test was performed without deviation from ASTM procedures. i This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. a