Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning &Development Services 0- o3Y7 t Building & Code Regulation Division 2300 Virginia Ave, Rm 201 RECEIVED f _ Fort Pierce, FL 34982 772462-2165 Fax772462-6443 MAR 2 8 2018 FBC ENERGY CONSERVATION CODE permitting Department Duct Sealing Certification St. Lucie county Prescriptive and Performance Method Date: Permit# rtiid� rr� Lot#. Contra, or: RS�aft /—CGS Address: Consir ction: ❑ Post Construction Test ❑ Rough -in Test Date: 03—Zf l7 Floor Area (ft2): Time: 7: o y oa? Primary Location of Supply Ductwork Indoor Temperature (F): 75— Primary Location of Return Ductwork Outdoor Temperature (F): 7 i otai r-eaKaae i est (uutsiaer Duct) Leakage: ❑ Default BA -Prop. Leak Free ❑ Proposed On = Test Pressure: (Pa) Baseline Duct Pressure (optional) (Pa) Testina Comoan /R35 mow wng ran Press mow (ctm) esuits: Wass ❑ ran ea16441 Installed Pa Total Leakage (cfm): 617 1' Total Leakage per 100 sgft CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqf_ Company Name: �S �1 rs Address: I hereby certify that the above Du Sealing Leakage results demonstrate compliance with P Edition FBC Energy Conservation requirements in accordance with Section R403.2.2 i Signature: Print Nam: "// &1-1-er License/Certificate #. 9`76 �l