Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
home owner assoc approval
QUEENS COVE PROPERTY OWNERS ASSN., INC. J06 permir . �IO�� Fi S� <r c9 �eparCn, List Permitted Item Owner's Name 70 h {1 S �- \% CL1 l S Date Address Lac) t F re A e-�A n- C+ City - Pi State F L Zip _,34 `1`i"•1 Phone -v7 a . _r5Q9, `04rP Property Location: Lot_Block Unit Architect Phone Contractor Sl) j'Y1rA P r1 i n'9 MC 1 111 Q-License # a 4 a19 Phone ` '_7_7 ,t • 444 -(JUG 0 (This Is Required Item) �^ 'Address ©(�(�. _c� Pd Si 1 4e C y �I ��%`i`t�U i Permits: Fee Documents Required Home Construction $1300.00* # 1,2,3, & 5 (Includes pool fences, landscaping, etc.) Bulkheads. Docks. Hoists. & Pilings N/C #3,4,&6 Post -Construction Additions / Improvements N/C # 1 & 2 (pool only) (Includes, fences, driveways, pools, roofs, etc. New or repair) Queens Cove Documents $ 15.00 DOCUMENT LIST 1. Plot plan showing location, size, setbacks, & elevation. (For roof repair, specifications only). 2. Complete set of plans and specifications, including pool and enclosure, fencing, landscaping and drainage for surface water, swales, etc. 3. Survey. 4. Dock or bulkhead drawings. S. An "as built", survey or final plot plan, AFTER construction. 6. All required governmental permits (County, DEP, & Army Corps of Engineers — if required) NOTES a. * $100.00 is refunded upon submission of document # 5. b. A $ 74I.00 credit is due for new water hookup from St. Lucie County Utilities. C. Property owners will be held responsible for any damage to the common properties of Queens Cove as a result of the above construction (whether caused by the owner, contractor or sub -contractor). d. Owners and contractors will also be responsible for ensuring all suppliers and workers comply with our speed limit (25 mph) and refrain from littering. Disregard of these requirements could result in the contractor or person(s) being barred from Queens Cove. e. All new construction shall conform to the required quality of workmanship and materials and be in harmony with the external design of existing structures. f. New construction will not be permitted without existing or simultaneously -constructed bulkheading. fif Effective 7/1/08 (Obsolete Previous Editions) EN TIIE HOURS OF 7:j.Q AM -AN17 C-GIVE OUT YOUR OWN.