Loading...
HomeMy WebLinkAboutLETTER - HOME OK FOR PIT SET■ _ I September 13, 2005 Mr. Ron Bland Homette Corporation P.O. Box 2168 Ocala, Florida 34478-2168 Dear Mr. Bland, Skyline Corporation P.O. Box 743 (46515-0743) 2520 ByPass Road Elkhart, Indiana 46514-1584 (574) 294-6521 SCANNED BY St Lucie County This letter is in response to your September 13, 2005 facsimile to Mr. Chuck Chambliss. That facsimile concerned the setup of manufactured homes produced at your facility in a tidal flood zone AH. It is my understanding that the homes in question are to be "pit set". It is acceptable to "pit set" Skyline Corporation manufactured homes in a tidal floor zone AH provided the following conditions are met: • The home sites are properly drained so that water cannot accumulate under the home. • The area under the home is ventilated per the requirements of the Skyline Corporation Manufactured Home Installation Manual. • The tie -downs are pier supports are installed per the requirements of the Skyline Corporation Manufactured Home Installation Manual. All other aspects of the setup should conform to the Skyline Corporation Manufactured Home Installation Manual and State of Florida setup requirements. I trust this information will meet your needs. Feel free to contact me at the above telephone number if you have any further questions or co ems, Sin el i Jeffrey . Legau , P.E. Assistant Chief Engineer CC: Chuck Chambliss John Mikel File r' Ili � •,R �}'J ��y BRIN"GINGA*Ricdomi. BRINGING 02/23/2004 15:08 6785745700 bK1AN VAl_tNlt rHut eZ I OLIVER TECHNOLOGIES, INC. FLORIDA INSTALLATION INSTRUCTIONS FOR THE MODEL 1101 "V" SERIES ALL ST_E FOUNDATION SSYSTEM MODEL 1101 'IV" (STEPS 1-15) MODEL f f0f-L11V" LONGITUDINAL ONLY: FOLLOW STEPS 1-8 FOR ADDING LATERAL ARM: NFFRS STAMP FOIIOwS�pa f0-15 F.NEiNEERS STAMP 1. SPECIAL CIRCUMSTANCES: if the following conditions occur - STOP! Contact Oliver Technologies at 1-800-284-7437 : a) Pier height exceeds 48" b) Length of home exceeds 76' e) Roof eaves exceed 16" d) Sidewall height exceed 96" e) Location is within 1500 feet of coast INSTALLATION OF GROUND PAN 2, Reml ve weeds and debris in an approximate two foot square to expose firm soil for each ground pan (0) - 3. Place ground pan (C) directly below chassis I-beam . press or drive pan firmly into soil until flush with or below soil. SPECIAL NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any othe r pier. it is recommended that after leveling plers, and one-half inch (1/2") before home is lowered completely on to piers, complete steps 4 through 9 below. INST CATION OF LnN�ITUDINAL "V" BRACE SYSTEM NOTE: WHEN INSTALLING THE'MODEL 91101-L"V" LONGITUDINAL SYSTEM PULY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 276 A 6 FOOT ANCHORMUST 9E USED, IF PROBE TEST READINGS ARE BETWEEN 276 & 350 A 4 FOOT ANCHOR DIAGONAL -nF AND LIZER PLATES MAYBE USED. USE GROUND ANCHORS WITH HOMES SUPPL ED WITH VER (CAL TIE CONINECTID POINTS (P IES ARE ALSO REQUIRED ON R FLORIDA REG )Y 5'4". VERTICAL T 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 45 degree angle is maintained. (PIER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE prox. 45 degrees Max.) Tube length Tube Length 24 3/4" to 32 1 /4" 113" ..•.: ' ;33•tCf•4fi,. `�,�. 1`ti". 40" to 45" 54" 5. Install (2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment. 6. Place I-beam connector (F) loosely on the bottom flange of the I-beam. 7. Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connectors (F) and fasten loosely with bolt and nut. S. Repeat steps 6 through 7 to create the "V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree and not below 40 degrees. 9. After all bolts are tightened, secure 1,25" and 1.50" tubes using four(4) 1/4"-14 x 3/4" self -tapping screws in pre -drilled holes !NeTALLATION QF I �TERAL T I ESCOPING TRANSVERRIF ARA11 SYSTEM THE MODEL 1101 "v" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES & FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 5'4". FOUR FOOT (41) GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. I D.IInstall remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerllne anchors to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 14,000 lbs. require a 5' anchor. 11. NOTE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location. This frame tie & stabilizer plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at -support location. The lengths Come in either 60" or 72" lengths. With the 1.50" tube as the bottom tube, and the 1.25" tube as the Inserted tube.) 13. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. 141 Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. 15 ecure ran to 127 transverse arm using our -,T4 x se - ppmg screws In pre-drilied holes. MANUFACTURED HOUSING FOUNDATION SYSTEMS Telephone: 931-796-4555 A DIVISION OF OLIVER TECHNOLOGIES, INC. Fax: 931-798-8811 1-800-284-7437 www.otivenechnologles.com pa(. co IG'.�1 02/23/2004 15:08 ' 67,85745700 BRIAN VALENTE PAGE 03 *. ii If anchors Jney be used in ON Ioaallons except where home menufacturm spec'iricalions for sidew r" streps aro In excess of 4,000 lbs. These locations rogUlre a 5' anchor, D-Oro Pen ALL WIDTHS; AND'LENGTHS UP TO 52' • • ALL WIDTHS; AND LENGTHS OVER 52' TO 80' IOF '1TC i REQ'Uf E: ; i�Ef 'F :Ci�v'II I E ULAT'Q �l�t�� tt '`:'''''`' u. `dr � s:'u �:to':52'��•.and �g� sy�tr��is�ir `�orh�e `, Jllfater� �t�•• at . each �• I�cln�sti'�m. • . ;.,.:.... �� ...:.. ' � '� �� ..... ....... . ,✓/ U BRACKETS �. OL yy� E = TELESDOPI NG V BRACE / nea t b / ��"� `� Ov IN513 ETt BEANb 1,5 TUBE T n PrR Trrr I� �' fit( ��e F = V' S B I -BEAM CONNEC. Tap ' p TORS SEMBLY E— g� H = TEL COPING TRANSVERSE f�' J"�p ��' �, 5 AR ASSEMBLY ERSE ARM 1.3 M btetC I•liea ` 6'¢b�� NECTOR connedo J- AN BRACKET J - ground Pan , WSED I TRUCTIONS 4123103 V Bucket NOTES: 1, LENGTH OF HOUSE IS THE ACTUAL 60X SIZE E-'Y ft a ru 2, • = STABILIZER PLATE AND FRAME TIE LOCATION Top (1z5) (needs to be located within 18" from center of / Bottom (1.6 Ground Pan ground pan) LOCATION OF ASF MODEL I I01"V" (LATERAL & LONGITUDINAL BRACING), C. 4, K1= LOCATION OF MODEL 1101-L"V' PATENT PENDING (LONGITUDINAL BRACING ONLY). Tele p hone: 931-796.4595 MANUFACTURED HOUSING FOUNDNOL SYSTEMS Fax: 931-795-8511 A DIVISION OF OLIVER TECHNOLOGIES, INC. ,N,,,,w.clivertechnolpgieS.COM 1400-284-7437 0 iy flF, h,1-10, 30'-2' 8809 CFO —on CD ry C%J ri w -------------------------------------------- 22 cn 21604 2100N f 21 M 21000 • _X ----------- X ---------------------------- ------------------- p c2q cu cu 4'-B' M c:l FLORIDA ONLY PIER POINT LAYOUT (PIERS 2 I —BEAM L CENTERLINE WITHOUT PERIMETER FOUNDATION) 20 F'SF ROOF ZONE X COLINt ITS , SCE AMVE DIAL AAA FUR LOCATTIM & LaU RMKM[Nn 8 209 Wr 20NE, SEE ThXE i (IF MIALLAIM WAX M3q FUM4U SRES. OI -BEAM PIR aPD97S - 8' R4X IFACTRG - SE MIALLATIM fMVAL TAILE 2 FOR SPAMN5*01) TAME 4 rm Fomm srim WE - C[DflACT HAWFACTIlMiG D(VISTM FIR LDCATMM OF DPTIOr?& PATIO DMIRS OR CMCR LAINZ OPEND4S. 44'—(Y 1.4428-2CK-1 3/4B—GATH az MAWN SM VM I Vno 'ZaM- IVA DAM17/ri/M JWOF TOMaN .2550—CT