HomeMy WebLinkAboutMANUFACTURED HOME INSTALL - SHINGLE ROOK - RIDGE VENT;mime
Corporate Office - P.O. Box 743 - Elkhart, Indiana 46515
•
Y
-_ HOME-
INSTALLATION
FOR
SHINGLE ROOF
WITH RIDGE VENT
(SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)
W
z ;
o
w
z �
a s INE
BRINGING AME n HOME BRINGING AMFRI(A FIIN
0
}
Y
The technical content of this Installation Manual has been reviewed by
PFS Corporation and found to be in accordance with the Federal
Manufactured Home Construction and Safety Standard.
APPROVED
PFS Corporation
Madison WI
01/31/05
HUD Manufactured
Home
Construction 8
Safety Standard
INSTALLATIO-N-O�-SHINGLE ROOF
WITH RIDGE VENT
1. Fold back the underlayment.
2. Remove the roof sheathing at the ridge
8. Complete the installation of the shingles.
See figures 2 and 3.
beam on one or both halves, which was 9. In the area the ridge vent is to be installed, use
temporarily secured to the roof at the factory. a utility knife to cut away the shingles and
(Note that there is a notch in the sheathing underlayment along the edge of the sheathing.
for the installation of the ridge vent).
3. Bolt the ridge beam halves together as out-
lined in the Skyline Corporation Manufac-
tured Home Installation Manual.
4. See figure 1. Replace sheathing using
12Ga.x7/16"x1-1/2" staples or 8d twist nails
4 inches on center at butt joints and at each
truss between joints. Maintain the gaps
between the sheathing and the ridge beam
where the ridge vent is to be installed.
5. Tack roofing underlayment back in place
6. Center and staple the additional strip of
underlayment on the ridge.
7. Fasten the drip edge to the sheathing at the
roofs edge (above underlayment).
10. Install the ridge vent per the included manufac-
turer installation instructions. See figures 4, 5
and 6.
11. Install ridge shingles to the area of ridge not
covered by ridge vent. Start at the vent and
work towards roof edges. See figure 7.
12. Nail ridge vent cap shingles in place using 2
inch roofing nails. Start at one end of the vent
and work towards other end. Nail shingles in
place utilizing 5-inch shingle exposure. See
figure 8. Seal ends of ridge vent per the vent
manufacturer installation instructions.
13. Install closure cap at eave joint.
Note: See the Skyline Corporation Manufactured
Home Installation Manual for any additional ;
information.
__
9
r
l �
SECURE CLOSURE
CAP WITH #6 x 3/4"
SCREWS AT LOCATIONS
INDICATED
FIG. 8
APPLY CAULKING
TO CLOSURE CAP
FIG. 9
M
NAIL OR STAPLE RIDGE
SHINGLES AS INDICATED.
SEE FIG. 3 FOR FASTENER
SIZES
FIG. 6
L0
\7
IQ -6� -
70
�Ook
1"
k
5"EXPOSURE
a
a
� "
SITE INSTALLED RIDGE VENT
SHINGLES (4 ORB
COURSES) SEE STEP 9
UNDERLAYMENT PAPER / ROOFING UNDERLAYMENT
FOLDED BACK FOR r/
" BEAM BOLTING
_SHEATHING
a
(r
6 c 0 F
.iii sr a4 K
DRIP CAP
RIDGE BEAM
r .
• FIG. 1
FIG. 7
RIDGE LINE
FIELD INSTALLED
SHEATHING
16" f/!1lflff UNDERLAYMENT PAPER
" f!!//1!//t/1!!!!1!!fJ///f - ',' € 8 • eta
18" SHINGLE -
FIELD INSTALL
24" SHINGLE --,-
24" SHINGLE -
FIELD INSTALL
3U' SHINGLE -
FIELD INSTALL
36" SHINGLE -
FIELD INSTALL
SEE FIG. 3 FOR FASTENING REQUIREMENT
IF THE ROOFING IN THEAREAOF THE FRONT RAKE HAS BEEN
COVERED TO FROTECTFROMWIND DAMAGE DURING TRANSIT, THE
PROTECTIVE COVERINGAND FASTENERSARE TO BE CAREFULLY
FIG. 2 REMOVED. SEALTHE FASTENER HOLES WITH ASPHALT ROOFING
CEMENT.
FASTENERS:
USE 1" CROWN x 1" LEG 16 GA. GALVANIZED
STAPLES OR 1 1/4" 12 GA. GALVANIZED ROOFING
NAILS WITH 3/8" DIAMETER HEADS
k 36" SHINGLE
12"
NAIL 1" FROM EACH END
5 5/8" ABOVE EXPOSED BUTT &
5/8" ABOVE EACH CUT OUT
FIG.3
FIG. 4
FIG. 5
1