Loading...
HomeMy WebLinkAboutMANUFACTURED HOME INSTALLATION MANUALBRINGING AMERICA HOME. BRINGING AMERICA FUN. Corporate Office — P.O. Box 743 — Elkhart, Indiana 46515' 1 SKYLINE MANUFACTURED HOME INSTALLATION MANUAL SMIMMEO BRINGING AMERIfA HOME. BRINGING Amu [UN. 0i" 02/08/06 ; iF�Qj I-R-UPI-11-M-0 63 CHAPTER 9 FINAL INSPECTION , TABLE OF CONTENTS Make a final inspection when home installation is complete to make sure that no items have been overlooked and that all work - was done properly. Place special emphasis on the following "checklist" items: —Water-and-Drain Syster properly and do not leak. Appliance Function and Operation. All fixtures and appliances have been tested and work properly. square foot for every 150 square feet of floor area of the home. The vent size must be increased to allow for insect screens, slats, louvers, etc., used over the open vent area. Low -Hanging Trees and Bushes. If there are any low -hang - Windows, Doors and Drawers. All windows, doors and ing trees or bushes near the home, trim or cut them. Think drawers work properly. about the plants' possible movement during windy conditions or when covered by snow or ice. - _Egress-Windows.—Onewindow-in-each-bedroom is deli - nated as a secondary exit to be used in case of emergency. Exhaust Fan Operation and Air Flow. Check all exhaust Each exit window is labeled as such with operating instruc- fans for proper operation and air flow. tions. All shipping hardware should be removed, and the window should operate as explained in the window Bottomboard. Carefully inspect the bottom covering of the manufacturer's instructions. home for loosening or tears from installation of pipes or wires. Exterior Siding and Trim. There are no gaps, voids, or missing fasteners, and all seams are sealed. Stack Heads and Vent Pipe Flashings on Roof. All stack head or vent pipe flashings are properly attached and sealed. Seal openings around the floor perimeter, pipes or pipe hangers and splits or tears with weather -resistant tape. Anchors and Straps. Be sure the correct number of anchors have been installed at the proper angle, and that all straps have been tightened. Composition Roof. All shingles are properly attached, none Interior Details. Inspect for, and correct, all interior finish - are loose or missing, and all holes are filled. ing details, such as loose molding, carpet seams, etc. The retailers' representative should inspect the home with the Skirting Ventilation. The skirting around the home has homeowner, give the homeowner a copy of the Homeowner,'s non -closing vents, located at or near each corner as high as Manual, and brief the homeowner about maintaining the possible to cross -ventilate the entire space under the home. home. INSTALLATION INSPECTION CHECKLIST TO ENSURE PROPER HOME INSTALLATION AND HOMEOWNER SATISFACTION, THE FOLLOWING ITEMS SHOULD BE CHECKED DURING OR PROMPTLY AFTER THE INSTALLATION AND BEFORE THE HOMEOWNER TAKES POSSESSION: INSTALLATION/PLACEMENT: ❑ Alignment/Close-Off DW ❑ Level ❑ Foundation ❑ Tie -Downs UTILITY CONNECTIONS ❑ Fuel ❑ Water ❑ Electric ❑ Sewage ❑ Cross -Over Duct EXTERIOR ❑ Doors ❑ Windows ❑ Roof ❑ Siding/Trim J 62 INTERIOR ❑ Ceiling ❑ Trim ❑ Electrical Systems/Fixtures ❑ Cabinets ❑ Furniture ❑ Keys ❑ All Warranties ❑ Paneling ❑ Floor Covering/Drapes ❑ Doors ❑ Plumbing ❑ Appliances ❑ All Manuals Chapter 1 — Introduction ................................................. 4 Double Wide Exterior Closure ...............35-37 ` - Masonite Siding ..................................... 35 Chapter 2 — Definitions ................................................. 5 - Vinyl Lap Siding ..................................... 36 ' - HardiPanel & HardiPla_n-d Siding_......_---37 Chapter 3 — Site Preparation Installation of Shingle Roof ...................38-39 Zone Maps .................................................. 6 Double Wide Utility Interconnection .......40-43 Site Grading ............................................. 7-8 - Bonding................................................40 Description of Soils .................................... 8 - Electrical Crossover .............................. 40 - Heating Crossover.................................41 Chapter 4 — Foundation and Support Requirements - Gasline Crossover ................................. 42 Piers........................................................... 9 - Waterline Cross Connect .......................42 Design Requirements ................................ 9 - Drainline Cross Connect ....................... 43 _ D.esign_P__rocedures—.__-_—._..... 9-1-0 Installation -of -Exterior -Light -Fixtures- .:.....-.:: 43-- Acceptable Footings ................................ 10 Venting of Skirting and Crawlspace ............ 43 Placement in Freezing Climates .............. 10 Metal Roof Tightening ................................. 43 Proper Sizing of Footings ......................... 10 Porches & Decks........................................43 Permanent Foundations .......................... 10 Flood -Prone Areas .................................... 10 Chapter 6 — Installation of Optional Features Severe Wind Areas ................................... 10 Electrical Dryer Venting .............................. 44 Special Snow Load Conditions ................. 10 Gas Dryer Installation.................................44 Important Reference Documents .............. 10 Gas Water Heater Venting ..........................44 Typical Installations...................................11 Grill/Range Venting.....................................44 Typical Pier Construction .......................... 12 Paddle Fan Installation ..........................45-46 Support Requirements ......................... 13-15 - Flush Ridge Beam.................................45 - Single Wides....................................... 13 - Protruding Ridge Beam ......................... 46 - Double Wides................................. 14-15 - False Beam...........................................46 Sidewall Openings .................................... 15 Air Conditioning Electrical Connect ............ 47 • Pavilion Dormer Blocking ......................... 16 Evaporative Cooler ..................................... 47 Footing Sizes ...................................... 16 -17 Dealer Installed Blend Air ...........................49 Expanding Rooms, Slide -Outs ...................49 Chapter 5 — Set -Up Procedures Site Attached Structures ............................. 49 Moving Home to Location ......................... 18 Hinged Roofs and Eaves ............................ 49 Positioning Home ..................................... 18 Ceiling Fans................................................49 Leveling and Blocking .......................... 18-20 Telephone and Cable TV ............................ 49 - Single Wides.................................. 18-19 Fireplace Installation...................................49 - Double Wides...................................... 20 Field Installed Hearth..................................49 Adjustable Outrigger ................................. 21 Field Installed Fireplace Chimney ..............50 Use of Water Level ................................... 22 Double Wide Interconnection .............. 23-24 Tie Down Instructions .......................... 25-26 Over -The -Roof Straps .............................. 26 Anchor Tables Wind Zone I .................. 27-29 Anchor Tables Wind Zone II & III ......... 30-31 Anchor Tables for 102" Sidewalls ............. 32 Longitudinal Tie Down Instructions ........... 33 Tie Down Example .................................... 34 WARNING ONLY EXPERIENCED PERSONS KNOWLEDGEABLE OF MANUFACTURED HOME SET-UP PROCEDURES SHOULD SET UP THIS HOME Chapter 7 — Utility System Connection and Testing Water.......................................................... 51 Drainage - Connection ................................ 51 Drainage - 1, 1-1/2, 1-3/4 & 2 Bath .............51 Gas........................................................ 51-52 Electrical..................................................... 53 Outside Panel Box ...................................... 53 Electrical System Test ................................. 53 Multi -Section Frame Bonding ..................... 54 Typical Under -Chassis Feed Connections ................................... 54 Typical Meter Base Installation ................... 55 Meter Base & Panel w/Masthead ............... 55 Chapter 8 — Protective Window Coverings ................ 56-61 Chapter 9 — Final Inspection Final Inspection..........................................62 Installation Inspection Checklist .................62 NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED PERSONNEL IN PROPER INSTALLATION OF SKYLINE MANUFACTURED HOMES. IT IS NOT INTENDED TO ENABLE SOME- ONE UNFAMILIAR WITH MANUFACTURED HOME INSTALLATION TO PERFORM THE INSTALLATION. SET-UP SHOULD BE DONE ONLY BY QUALIFIED PEOPLE. WHOEVER DOES THE SET-UP SHOULD GUARAN- TEE THEIR WORK IN WRITING FOR A REASONABLE TIME AND SHOULD, IF NECESSARY, AGREE TO RELE- VEL THE HOME WITHIN 90 DAYS AFTER THE INITIAL SET-UP. Chapter 1 INTRODUCTION PROTECTIVE WINDOW COVERINGS (Continued) PLEASE READ ALL INSTRUCTIONS PRIOR TO SET-UP! This Skyline home was engineered, constructed and inspected for conformance to the Federal Manufactured Home Construction and Safety Standards in effect on the date of manufacture. This National Standard sets forth comprehensive requirements for design construction, fire safety, plumbing, heating systems and electrical systems for manufactured homes designed to be used as dwellings. This manual contains detailed installation instructions, includ- ing specifications and procedures for erection and hookup of your manufactured home. It has been written in an objective and easy - to -understand manner so it can be understood by people without extensive technical training. It discusses the set-up of the home from preparing the site through final inspection. It includes many tables and figures giving important data for proper set-up. Careful adher- ence to this manual by the homeowner and installation crew, and consultation with a registered professional or structural engineer in those unusual circumstances it does not cover, will assure you of a quality, safe and affordable home for many years to come. Prior to locating or relocating your home, contact the lo- cal authority having jurisdiction for installation to see if permits for such procedures as blocking, anchoring, or utility connections are required. Inspections may be required during installation. On private property, zoning or development covenants may apply and should be taken into consideration. NOTE: Preparations of the site when accomplished by others than the home installer, may not be in accordance with these instructions. THE IMPORTANCE OF CORRECT SET-UP CANNOT BE OVEREMPHASIZED. Correct set-up is absolutely essential to ho- meowner satisfaction. If you are not absolutely certain of the proper procedure or you encounter unusual conditions, please contact your factory service representative. THE INSTRUCTIONS CONTAINED HEREIN ARE MINI- MUM REQUIREMENTS. APPLICABLE LOCAL OR STATE LAW MAY HAVE OTHER OR GREATER REQUIREMENTS WHICH MUST BE COMPLIED WITH TO OBTAIN OR REGAIN THE RIGHT TO OCCUPY THE HOME. APPROVED PFS Corporation Madison WI 01 /06/06 HUD Manufactured Home Construction & Safety Standard The recommended procedures contained in this manual are in- tended to assist in proper installation of this home. Field experience may justify alternate acceptable procedures which, when completed, result in performance at least equal to that which will result from conformance to the details and specifications herein. For example, on double wide installation you may find it advantageous, due to lo- cal conditions, to bolt the floors together prior to-bolting-roafhalves together, or vice versa. Either method is acceptable as long as the bolting schedule is adhered to. NOTE: A MANUFACTURED HOME SET UP IN THE WRONG STRUCTURAL ZONE DOES NOT MEET THE REQUIREMENTS OF THE FEDERAL MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS. BEFORE COMMENCING SET-UP, SEE CONSTRUCTION INFORMATION, LOCATED IN THE MASTER BEDROOM CLOSET OR AT THE ELECTRICAL DISTRIBUTION PAN- ELBOARD, FOR DESIGNATION OF ZONE FOR WHICH THE HOME WAS CONSTRUCTED. SPECIAL CONSTRUCTION SUCH AS EXPANDO UNITS, TRIPLE WIDE UNITS, AND PERIMETER BLOCKED UNITS WILL BE COVERED IN SUPPLEMENTS TO THIS. MANUAL. CONTACT YOUR FACTORY OR DEALER IF THIS HOME HAS ANY SUCH FEATURES AND YOU DO NOT HAVE THE APPLICABLE SUPPLEMENTS. WARNING: ONLY TRAINED CREWS SHOULD INSTALL THE HOME. INSTALLERS SHOULD FOLLOW THE SAFE- TY INSTRUCTIONS PROVIDED IN THIS MANUAL. THIS HOME WEIGHS SEVERAL TONS USE ENOUGH TEMPORARY WOOD BLOCKING TO SUP- PORT THE HOME DURING SET-UP. No one should be allowed under the home unless it is securely in place, even if it is not moving. a STA The technical content of the Installation Manual has been reviewed by PFS Corporation and found to be in accordance with the Federal Manufactured Home Construction and Safety Standards. Protective coverings may also be installed over doors and sliding glass doors in a different manner than described previously. First, remove the mounting screws holding the door frame to the exterior wall. Then place the plywood (or wood frame) from Table 8 over the door opening and fasten the plywood and door frame back into the wall studs through the same holes in the door frame. Use #8 x 3" wood screws 12" o.c. for doors. Use #8 x 4" wood screws 6" o.c. for sliding glass doors. See Figure 8-6 for a typical application of this type of protective covering. Door Size Plywood face grane #8 x 3 Wood Screws 12" o.c. max. #8 x 4 " Wood Screws 6" o.c. for / a sliding glass door Door Frame CERT ' # 09703 �'. STATE OF :'� �:F•.DIANP`V��� FIG. 8-6 #8 x 3" Wood Screws 12" o.c. max. #8 x 4" Wood Screws 6" o.c. for a sliding glass door. Wall Studs SECTION B-B Due to the limited time between when a storm warning is issued and when the storm could hit at your location, Skyline recom- monds that the items necessary for the protective coverings be purchased and prepared before a storm warning is issued. Cut plywood to size and mark it relative to window/door location. Store plywood and fasteners together in a dry place where it will be accessible. Once the protective coverings have been installed, the home should not be occupied. 4 61 PROTECTIVE WINDOW COVERINGS (Continued) Chapter 2 500 AIRPORT -DR. MANSFIEtD—TEXAS 76063— -- — -- (817)473-4421 Installation of Protective Covering as required by H.U.D. for Zone II and III The following pages illustrate the application of an exterior window protection in the event of storms (such as hurricanes) as required by HUD. Please note: Installation of protective coverings (such as those listed below) will negate egress of the window. Homes with protective coverings (such as those listed below) cannot be occupied while the coverings are in place. Parts required: 1. 3/4" plywood — enough for each window in the home. 2. #8 x 1 1/4" OR 1 1/2" wood screws (see below for quantity). The installation steps apply to both the vertical and horizontal sides of windows. The size of the window will affect the number of fasteners needed. For windows with a face measurement of 30" wide x 30" high (or any smaller size), install 3 fasteners, spaced eight (8) to twelve (12) inches apart on the head and on the sill. Install four (4) fasteners, spaced eight (8) to twelve (12) inches apart on both the left and right frame sides. For windows larger than 30" x 30" with 46" x 60" being the maximum size, add one fastener to each side for each additional eight (8) to twelve (12) inches in width and height. To determine the plywood size, (use 3/4" thick plywood) measure the width and height of the return fin (edge to edge). Position plywood over the window. With plywood supported, drive one fastener through the plywood and window nailing fin near center of window sill. Repeat this procedure for the other required sill fasteners. With covering attached at sill, continue driving fasteners around perimeter of the plywood using the above spacing formula. After the storm has passed, reverse the above procedure to remove the covering. Store materials for future use. Be sure to fill all holes left by the removal of the screws with a suitable silicone type sealant. Material should have a long life rating. This will prevent water and air from entering the home. Exterior Sheathing LVINYL WINDOW FRAME 3/4" PLYWOOD #8x1 1/4" SCREW @ 12" O.C. MAX WINDOW RETURN FIN VINYL SIDING �>4 AS PER MFG STANDARD DEFINITIONS ANCHORING EQUIPMENT: Straps, cables, turnbuckles and chains, including tensioning devices, that are used with ties to secure a manufactured home to ground anchors. ANCHORING SYSTEM: A combination of ties, anchoring equipment, and ground anchors that will, when properly de- signed and installed, resist the wind's overturning the home or moving it sideways. FOOTING: That part of the support system that sits directly on the ground at, below or partly below grade to support the piers. PERIMETER SUPPORT: The portion of a support system that supports the sidewalls at the floor line. PIER: That portion of the support system between the footing and the manufactured home, exclusive of caps and shims. Types of piers include, but are not limited to, the following: 1. Manufactured Steel Stands 2. Manufactured Concrete Stands, and 3. Concrete Blocks HOME INTERIOR SITE, MANUFACTURED HOME: A parcel of land designed and designated for the location of one manufactured home, its accessory building or structures, and accessory equipment for exclusive use of the home's occupants. WOOD AS F BY DESIGN Exterior Sheathin g 8-17-q4 STABILIZING SYSTEM: A COMBINATION OF PROPERLY INSTALLED ANCHORING AND SUPPORT SYSTEM. STAND, MANUFACTURED HOME: That area of a manufactured home site which has been reserved for place- ment of a manufactured home. SUPPORT SYSTEM: A combination of footings, piers, caps and shims that will, when properly installed, support the manufactured home. 60 5 Chapter 3 SITE PREPARATION ZONE MAPS OF THE UNITED STATES MT ID WY gOR NV UT CA CO AZ NM ME ND VT. } SD MN � NY MI NE IL IN OH PA CT `DE KS MO KY VA 'MD - TN NC OK AR SC - MS AL GA v� FL "AK HI ❑ SOUTH 20 PSF ❑ MIDDLE 30 PSF r� `= NORTH 40 PSF ROOF LOAD ZONE MAP MT ND - vt.' r OR -- ID SD MN WI NY WY MI w 4? NE IA IL IN OH PA N UT }_DE CA CO KS MO KYVA D TN NC AZ NM OK AR SC MS AL GA AK HI ❑ ZONE I ❑ ZONE II WIND ZONE MAP M ZONE III The following local governments listed by state (county/ parishes, unless noted otherwise) are located in WIND ZONE II: ALABAMA - Baldwin and Mobile FLORIDA - All counties except those identified as being within Wind Zone III. GEORGIA - Bryan, Camden, Chatham, Glynn, Liberty and McIntosh LOUISIANA - Acadia, Allen, Ascension, Assumption, Calca- sieu, Cameron, East Baton Rouge, East Feliciana, Evange- line, Iberia. Iberville, Jefferson Davis, LaFayette, Livingston, Pointe Coupee, St. Helena, St. James, St. John the Baptist, St. Landry, St. Martin, St. Tammany, Tangipahoa, Vermillion, Washington, West Baton Rouge and West Feliciana. MAINE - Hancock and Washington MASSACHUSETTS - Barnstable, Bristol, Dukes, Nantucket and Plymouth MISSISSIPPI - George, Hancock, Harrison, Jackson, Pearl River and Stone NORTH CAROLINA - Beaufort, Brunswick, Camden, Chowan, Columbus, Craven, Currituck, Jones, New Hanover, Onslow, Pamlico, Pasquotank, Pender, Perquimans, Tyrrell and Washington SOUTH CAROLINA - Beaufort, Berkeley, Charleston, Colle- ton, Dorchester, Georgetown, Horry, Jasper and Williamsburg. MT OR �_.� ID WY w CoUT CA AZ I NM ND MN SD WI MI NE tA IL IN OH KS MO KY TN OK AR AK HI ❑ ZONE I ❑ ZONE 2 ❑ ZONE 3 HEATING AND COOLING ZONE MAP PROTECTIVE WINDOW COVERINGS (Continued) tlA -A l 500 AIRPORT DR. MANSFIELD, TEXAS 76063 (817)473-4421 VT NH ME + NY M PA cT NJ 'D VA MD Ic IN WIND ZONES II AND III, UNLESS THE HOME AND ITS ANCHORING AND FOUNDATION SYSTEM HAVE BEEN DESIGNED FOR THE INCREASED REQUIRE- MENTS OF EXPOSURE 'D' OF ANSI/ASC= 7-88, IT SHOULD NOT BE LOCATED WITHIN 1500 FEET OF THE COASTLINE. WIND ZONE II (continued): TEXAS -Arkansas, Brazoria, Calhoun, Cameron, Chambers, Galveston, Jefferson, Kenedy, Kleberg, Matagorda, Nueces, Orange, Refugio, San Patricio and Willacy VIRGINIA (The cities of)- Chesapeake, Norfolk, Portsmouth, Princess Anne and Virginia Beach The following local governments listed by state (county/par- ishes, unless noted otherwise) are located in WIND ZONE III: FLORIDA - Broward, Charlotte, Collier, Dade, Franklin, Gulf, Hendry, Lee, Martin, Manatee, Monroe, Palm Beach, Pinellas and Sarasota LOUISIANA- Jefferson, La Fourche, Orleans, Plaqueminesf St. Bernard, St. Charles, St. Mary and Terrebonne NORTH CAROLINA - Carteret, Hyde and Dare. The following states and territories are within WIND ZONE III: - State of HAWAII ALASKA - Costal regions between the 90 mph isotach on ASCE 7-88 wind map and the coast. U.S. TERRITORIES -American Samoa, Northern Mariana Islands, Trust Territory of Pacific Islands, Guam, Puerto Rico and U.S. Virgin Islands. INSTALLATION OF PROTECTIVE COVERING AS REQUIRED BY H.U.D. FOR ZONE II AND III The-fol►owin"ages illustrate the -application of an exterior window protection in the event of storms (such as hurricanes) as required by H.U.D. Please Note: Installation of protective coverings (such as those listed below) will negate egress of the window. Homes with protective coverings (such as those listed below) cannot be occupied while the coverings are in place. Parts Required: 1. 3/4" plywood — enough for each window in the home. 2. #8 x 1" wood screws or longer (see below for quantity). The installation steps apply to both the vertical and horizontal sides of window. The size of the window will affect the number of fasteners needed. For windows with a face measurement of 30" wide by 30" high (or any smaller size), install 3 fasteners, spaced eight (8) to twelve (12) inches apart on the head and on the sill. Install four (4) fasteners, spaced eight (8) to twelve (12) inches apart on both the left and right frame sides. - For windows larger than 30" x 30" with 46" x 60" being the maximum size, add one fastener to each side for each additional eight (8) to twelve (12) inches in width and height. To determine the plywood size, (use 3/4" thick plywood) measure the width and height of the outside (exposed) return fin (edge to edge). Position plywood over the window. With plywood supported, drive one fastener through the plywood and window return fin near center of the window sill. Repeat this procedure for the other required sill fasteners. With covering attached at sill, continue driving fasteners around perimeter of the plywood using the above spacing formula. After the storm has passed, reverse the above procedure to remove the covering. Store materials for future use. I Rp% 4F 7/16" TRIM APPROX 1/2' F HARDBOARD 7/16 ,;� Wood As Required By Design As Per MFG. Standard INTERIOR OF HOME 3/4 Ply Wood WINDOW RETURN FIN HORIZONTAL SECTION Aluminum Window Jamb 1-q4- Wood As Required By Design L. #8x1" Screw 6 @ 12" o.c. Max. 59 PROTECTIVE WINDOW COVERINGS (Continued) SITE PREPARATION (Continued) The second type of protective covering is to attach 3/4" plywood directly to the window frame. The plywood is attached to SITE P R E PARAT I O N the window frame with- #_8 screws-around-the_windo.ws_frame-(topr-bottom-and-sides)—T-he-specifiG-instructions-for-each-window T_he_importance-of-site-preparation-for-a-problem-free-instal- 1-50-square-feet of-floor-area.—T-he-required-ventilators-are manufacturer are shown below and on the next page. lation cannot be overstated. All vegetation must be removed to be approximately equally spaced around the perimeter from under the home site. The site must be properly graded and of the home with a ventilation opening within three (3) feet DANGER: STORM SHUTTERS CANNOT WITHSTAND SEVERE STORMS. TO AVOID PERSONAL INJURY OR sloped to provide for storm drainage runoff. In particular, the of each outside corner. DEATH, CONTACT LOCAL EMERGENCY SERVICES NOW TO IDENTIFY EMERGENCY SHELTER IN THE EVENT OF area under the home must be graded to prevent water accumu- SEVERE WEATHER. lation. Skyline Corp. recommends the home site slope 10 feet Proper support of the manufactured home must allow in all directions away from the home. If the home is sited on for soil conditions in the immediate area. Pier footings This direct fastening application was designed and tested for use on Philips Products series #22, 23 and 24 lap windows. Do sloping terrain or a hillside, the soil must be graded on all sides must be placed on firm undisturbed soil (not loose fill) or --not use-on-any--other-products.--- - to-channel-storm-runoftaround- the- home -and -not under -it --I# the - -soil-which-has been-compacted-to-at-least-90percentof— DUE TO THE LIMITED TIME BETWEEN WHEN A STORM INSTRUCTIONS FOR INSTALLING SHUTTERS ONTO A home is set in a pit, it is extremely important to provide water its maximum relative density. Support piers may also be WARNING IS ISSUED AND WHEN THE STORM COULD HIT PHILIPS PRODUCTS LAP MOUNTED ALUMINUM WINDOW drainage from under and around the home. placed directly on concrete slabs designed for manufac- AT YOUR LOCATION, WE RECOMMEND YOU DO THE tured home placement as found in manufactured home FOLLOWING BEFORE A STORM WARNING IS ISSUED: WARNING: THE AREA UNDER AND AROUND THE HOME communities. 1. Purchase #8 x 1" sheet metal screws (enough for all the windows). 2 2. Buy shutters and get them cut to size, and marked. The shutters must be 3/4" thick plywood. 3 3. Store shutters and screws together in a dry place where they will be accessible. 4 5 SCREW LOCATION DETAIL SCREW LOCATION DETAIL 6 3/18" (bottom on'. VERTICAL CROSS SECTION OF SHUTTER ATTACHED TO FRAME HEAD AND SILL IMPORTANT: DUE TO THE SHORTNESS OF THE EXTERIOR FLANGE ON THE FRAME SILL, THIS DIMENSION MUST BE MAINTAINED. 58 3118" (bottom only) For each window size, measure the width and height of the exterior flange of the window. (These become the shutter dimensions.) Determine how many shutters of this size are needed and get them cut to the proper dimensions. Mark each shutter as to where on the home it goes, as well as marking which end goes up. Mark the screw locations on the shutter (as shown below). With the help of an assistant, lift the shutter up to the window and center it on the window. Position the shutter so that the bottom edge of the plywood is even with the bottom of the exterior flange of the frame sill. Fasten the shutter to the window with #8 x 1" sheet metal; screws. Make certain the shutter does not shift out of HORIZONTAL CROSS SECTION OF A TYPICAL ALUMINUM WINDOW INSTALLATION NITH AN ATTACHED STORM SHUTTER WINDOW FRAME JAMB ROUGH OPENING STUD 7/16" HARDBOA.QD 3/8" (at top and sides) MUST BE SLOPED TO PREVENT WATER ACCUMULATION. EXCESSIVE MOISTURE UNDER THE HOME CAN CAUSE UNNECESSARY DETERIORATION, AND CAUSE CONDEN- SATION PROBLEMS, WHICH COULD AFFECT THE HOME'S WARRANTY. IT COULD ALSO AFFECT THE STABILITY OF THE FOOTINGS AND PIERS WHICH SUPPORT THE HOME. If the home is to be perimeter skirted or "pit -set," ventilation of the under -floor area is required to minimize the effect of moisture under the home. Ventilation openings must be provided in the under -floor enclosure or skirting on at least three (3) sides (pref- erable on all sides) with a net area of at least one square foot per After completion of grading and filling (if necessary), the bearing capacity of the soil at the depth of the footings should be determined. A pocket penetrometer (avail- able from engineering supply houses) or other method acceptable to local jurisdictions may be used. If the soil cannot be tested but can be identified, use the foundation bearing pressures shown in Figure 3-1 as a guide. If the soil cannot be identified, use the lowest value, 1,000 PSF. Under unusual conditions, or if the soil appears to be peat or uncompacted soil, consult a local geologist or profes- sional engineer for aid. CAUTION EXCESSIVE WATER IN THE SOIL UNDER THE HOME WILL CAUSE UNNECESSARY DETERIORATION OF THE HOME AND AFFECT THE COMFORT LEVEL IN THE HOME. CONTINUOUS STANDING WATER UNDER THE HOME CAN CAUSE CONDENSATION PROBLEMS AND AFFECT THE HOME'S WARRANTY. PREVENTION OF WATER BENEATH THE HOME SINGLE SECTIONAL DO CROWN AND GRADE SITE TO DON'T GRADE SLOPE AWAY SITE SO THAT FROM HOME WATER COLLECTS BENEATH THE HOME la • - 11=Ilg.�l II:II II:II II:11 II............... 11 II II II....... 11--11.11:1_I:=:1� �1:11� 11'�'II=�. • ,11.=�•�.. II-1_I - • •• lie"Ilelf=n=n_Ir_�r �r_u_u=n_n�r_u=;11=11=1L=.11.-11=,11.=11.=11.=11=11=11=11'�11-11=:11= TRIPLE SECTIONAL • � �_'��_� � u •--—�-J"n—a—�-u-u u i u u u -- L=-11= n-IL-II 11-11`IL==� 1[ :11-1r=11=11=1hll�ll,�rll:.1� - • • �?II ��II: � 11:=11: � II'�r11.=11.=11=r11 �rlI �rll.Rll ..-���r�=�'.�.■�i� _-.n. 7 �-_ • ?�1=11:�1[==1L=1�=u�._ �.; ........:..-..,•...,-:..-_ _., :..-�.-n�u-g-11=112 � 11.=11�,:11-�rl�l-, ll:� II�II. � II. III. �IIF I„IIr, ll=1l.,,.11=11; II �.II. 11.-11. �II-11,=11.m11.-11.-11�11--,III li=,�ll�ll.-11-„-II �I SITE PREPARATION (Continued) PROTECTIVE WINDOW COVERINGS (Continued) GROUND BARRIER There is a strong tendency for ground moisture to be drawn into the home, greatly complicating efforts to control humidity and condensation. A ground moisture -vapor retarder of 6 mil. rated -polyethylene plastic, vinyl or similar material -laid -on the ground surface -under the home is recommended to assist in controlling the humidity in the home. General Description of Soils Allowable Pressure Soil Type (Pounds Per Square Foot) Based on the Unified Classification System No allowances made for overburden pressure, embedment, depth, water table height, or settlement problems. Rock or Hard Pan 4,000 and up Sandy Gravel and Gravel 2,000 Sand, Silty Sand, Clayey Sand 1,500 Silty Gravel, or Clayey Gravel Clay, Sandy Clay, 1,000 Silty Clay, or Clayey Silt Uncompacted Fill Special Analysis is Required Peat or Organic Clays Special Analysis is Required NOTE: ' To be used only when none of the following is available: a. Soils investigation and analysis of the site. b. Compliance with the local building code. } c. Competent opinion by a local engineer or building official. d. If the soil bearing capacity is less than 1,000 PSF, consult a professional engineer for foundation system requirements. FIG. 3-1 TABLE 8 PLYWOOD TYPE REQUIREMENTS WIND ZONE II 1 WIND ZONE III MAXIMUM .WINDOW SIZE STANDARD WALL AREA WALL AREA WITHIN 3' OF CORNER STANDARD WALL AREA WALL AREA WITHIN 3' OF CORNER WOOD SCREW SPACING 14.5" 1 1 1 1 16" O.C. 24.5" 2 3 3 4 16" O.C. 30.5" 4 5 5 7 16" O.C. 36.5" 6 7 6 8 12" O.C. 40" 7 8 8 9 12" O.C. 46.5" 1 8 10 10 10 101, O.C. 72" 1 10 1 10 10 10 6" O.C. All plywood for protective window coverings is APA rated exterior sheathing. Thickness and span ratings will vary with window or door size. Plywood listed below, with a higher number than is required by Table 8, may be substituted for a lower numbered plywood. -1. 3/8" with 20/0 span rating. Fasten to receiver w/#8x2" wood screws. 2. 1/2" with 24/0 span rating. Fasten to receiverw/#8x2" wood screws. 3. 3/8" with 24/0 span rating. Fasten to receiver w/#8x2" wood screws. -4. 1/2" with 32/16 span rating. Fasten to receiver w/#8x2" wood screws. ���`��1y„a:.•!�//,�F ..! 5. 5/8" with 32/16 span rating. Fasten to receiver w/#8x2-1/4" wood screws. = CERT 6. 3/4" with 40/20 span rating. Fasten to receiver w/#8x2-1/4" wood screws. = # 09703 = 7. 5/8" with 40/20 span rating. Fasten to receiver w/#8x2-1/4" wood screws. : -o 8. 7/8" with 48/24 span rating. Fasten to receiver w/#8x2-1/2" wood screws. ; o=.. STATE OF 9. 3/4" with 48/24 span rating. Fasten to receiver w/#8x2-1 /4" wood screws. %F'••!N p I pN? 10. Plywood with wood frame required. ��•• ONAL t-t t q 3' 3' 3' 3' FIG. 8-3 3' 3' In the event of a windstorm, the corners of this home will sustain higher wind pressure than the rest of the home. Therefore, it is required that windows and doors located within 3 feet of any corner be designed to withstand these higher pressures. Figure 8-3 shows the typical locations of the corners. Table 8 has separate columns indicating the plywood requirements for standard wall area and wall area that is within 3 feet of a corner. After the windstorm is over and the plywood has been removed, all holes made by the screws in the 2 x 4s should be filled 8 with a weather -resistant caulk. 57 CHAPTER 8 CHAPTER 4 PROTECTIVE WINDOW COVERINGS If your home is destined to be set in Wind Zones II or III, then it has been designed to install protective window and door cov- erings, in the event of a windstorm. Two different types of protective coverings are available. Your home may have either, or both The first type of protective window covering is to attach plywood to a 2 x 4 member that has been installed around window and door openings. The plywood is attached to the 2 x 4 members with #8 wood screws. The type of plywood, screw length, and screw spacing will vary with the window or door size. See Table 8 for these requirements. Note that the window sizes listed in Table 8 are the small dimension of the window or door (See Figure 8-1). Large openings (such as sliding glass doors) are required to be covered with a plywood and lumber frame assembly. See Table 8 to determine-when_this-is-required,_and-Figure-8-2-for-frame-construction.- - - - Window Size. See 9vA Rcrni—, 1 Plywood 1 face grain I #8 wood sc F I G. 8-1 See Table 8 ._. size and spacing. Window Size. See Table 8. 2x2 any grade SPF 6" o.c. 6" o.c. --------------- Plywood ----Jage gain--- --- �--------- Window Size. See Table 8. �����rlurrrrrr p`"o C ERT # 09703 = C'_ '. STATE OF .. Z P: =� '.F DIAN• vN /0 �'rrrrrti►��''` �� Receiver / 3/8" plywood, APA Rated Exterior Sheathing with 20/0 span rating. Fasten 2x2s to 2x4s with 2-8d nails at each connection. Plywood seam over 2x4. #8x3-1/2" wood screws, 6" o.c. into 2x4 receiver. Fasten plywood to 2x framing members w/full PVA white glue #2 SPF 2x4s, laid flat, 16" o.c. and 6d nails or #8x2" screws 6" o.c. all around. 56 FIG. 8-2 FOUNDATION AND SUPPORT REQUIREMENTS NOTE: This chapter covers only foundations. Page 11 space. When the space to be shimmed is less than the summarizes the usual types. Set-up procedures and minimum thickness of available caps or concrete blocks, methods for securing the home to its foundation are discussed dimension lumber may be used under the caps. in Chapter 5. A home that is certified for a higher roof load zone than the area that it is installed,_ may_ be set on a foundation system that is designed for the roof load zone for that area of the country. For example, a home that is certified to withstand a 30 PSF roof load is installed in a 20 PSF roof load zone area. The support under the home need only be designed for the 20 PSF roof load, in accordance with the requirements set forth in this manual. PIERS Importance. Incorrect size, location or spacing of piers may cause serious structural damage to the home. It is important to install piers around the perimeter if required for the home. Failure to do so may lead to sagging floors, walls and roofs. Acceptable Types. Piers may be concrete blocks or pressure treated wood, capped and shimmed with wedges, or adjust- able manufactured metal or concrete devices (see Figure 4-2). Manufactured piers should be listed and labeled for the ` required load capacity. DESIGN REQUIREMENTS Load -Bearing Capacity. The load that each pier must carry depends on factors such as the dimensions of the home, the roof live load, the spacing of the piers, and the way they are used to support the home. Center beam/marriage wall blocking is required for rnultisection homes. See tables 1 and 2 for pier capacities. Manufactured piers must be rated to at least these capacities, and locally con- structed piers must be designed to transmit these loads safely. Configuration. Figure 4-2 shows the recommended arrange- ment of concrete piers constructed on -site. Concrete blocks should have nominal dimensions of at least 8" x 16". They must be stacked with their hollow cells aligned vertically. When piers are constructed of blocks stacked side -by -side, every layer should be at right angles to the previous one (See Figure 4-2). Itap hollow block piers as shown in Figure 4-2 to distribute the structural load evenly across them. Caps may be of solid masonry or hard wood, and of the same length and width as the piers they rest upon. Avoid plywood, as it may lead to unwanted settling or movement. Use 4" x 6" hardwood shims (wedges to level the home and fill any gaps between the base of the I-beam and the top of the pier cap. Always use shims in pairs (See Figure 4-2). Drive them in tightly so they do not occupy more than 1" of vertical Select manufactured pier heights so that their adjustable risers do not extend more than recommended by the -manufacture r-when-fi nally-positioned, -- - - - - — All piers must rest on footings that either extend below the frost line or are otherwise protected from frost effects, and are placed on either undisturbed soil or compacted fill. DESIGN PROCEDURES Piers Less Than 36" High. Construct piers less than 36" high out of single, open or closed -cell concrete blocks, 8" x 8" x 16". Install them so that the long side is at right angles to the supported I-beam (See Figure 4-2). Position open cells verti- cally upon the footers. (See Figure 4-1). Horizontal offsets should not exceed 1/2" top to bottom. Mortar is not normally required. Manufactured piers should be listed and labeled. Do not extend their adjusting studs beyond the limits specified by the manufacturer. Piers 36" to 80" High. Construct all piers between 36" and 80" high, and all corner piers over three (3) blocks high, out of double, interlocked concrete blocks (See Figure 4-2). Mortar will not normally be required. Piers Over 80" High. Where permitted by local codes, lay them in concrete mortar with steel reinforcing bars inserted in the block cells and fill the cells with concrete. Where such construction is not permitted by local codes, have piers over 80" high designed by a registered professional or structural engineer. Location and Spacing. The location and spacing of piers depend upon the dimensions and weight of the home, the roof load zone, size, and type of construction of the footings. Other factors such as the location of doors or other openings and heavy pieces of furniture are also important. In general locate piers no more than 2' from either end, and not over 10' O.C. Single -Section Homes. Figure 5-2 shows the recommended locations and spacing of piers for single -section homes. Multi -Section Homes. Figure 5-3 shows the recommended location and spacing of piers for multi -section homes. Under Doors and Heavy Furniture. Place additional piers on both sides of exterior doors, side -wall openings wider than 4' (such as sliding glass doors), at Pavilion dormers, under porch posts, wood stoves, and under the expected locations of heavy pieces of furniture such as pianos, organs, waterbeds, etc. 9 FOUNDATION AND SUPPORT REQUIREMENTS (Continued) UTILITY SYSTEM CONNECTION AND TESTING (Continued) DESIGN PROCEDURES (Continued) Footings. Support every pier with a properly designed footing, as follows. ACCEPTABLE TYPES OF FOOTINGS. Concrete. Footings may consist -of -precast -or poured=in=place concrete, pads, slabs, or ribbons with a 28-day compressive strength at 3,000 psi. Pressure -Treated Permanent Wood. Two layers of 2" thick pressure -treated wood planks, with the long dimension of the second layer placed perpendicular to that of the first, fastened with cut edges painted or retreated, may also be used. Other Materials. You may also use other materials approved for this use by local authorities if they provide equal loadbear- ing capacity and resistance to decay. PLACEMENT IN FREEZING CLIMATES. Conventional Footings. For frost -susceptible soils, the most cost effective method of preventing the harmful effects of ground frost heave is usually by placing the footing below the frost line. Consult local authorities to determine frost penetra- tion. In the absence of a local code, use the frost penetration map as a guide. Existing manufactured home communities may be located on frost -susceptible soils in which homes historically have been installed on piers or slabs located above the frost line. For these communities, if there is a history of these homes not experiencing any deleterious effects from frost -heave and the homes are setup, supported and skirted as described herein, then footings are not required to extend below the frost line. Floating Slab System. When properly engineered by a reg- istered professional engineer, compatible with the anchorage requirements of Chapter 5, and acceptable to the local author- ity having jurisdiction, a "floating slab system" may be used above the frost line. Insulated Foundations. Footings may also be placed above the frost line when the home is provided with a perimeter foundation or skirting having insulation properties sufficient to prevent freezing of the soil under or adjacent to every load - bearing component of the foundation and acceptable for this purpose by the local authority having jurisdiction. Useful design guidelines may be found in references at the end of this chapter. Insulation systems should be compatible with the re- quirement to cross ventilate the entire space under the home. Proper Sizing of Footings. Proper sizing of footings depends upon the load -carrying capacity of both the piers and the soil. See Table 4 for recommended footing sizes. See Table 4B for minimum required concrete footing thickness. Footing size in no case shall be less than 144 sq. in. or smaller than the pier it supports. Permanent Foundations. Check local building codes and 10 regulations and consult a registered professional or structural engineer when you are setting your home on a permanent foundation (such as a full basement, crawl space or load -bear- ing perimeter foundation). A permanent foundation design, which meets most local codes, may be available from Skyline Corporation. Please contact the Skyline division which manu- factured the home or Skyline's National Director of Consumer Relations. - Flood -Prone Areas. Skyline Corporation does not recommend locating homes in river or coastal flood -prone areas. Special elevation and anchoring techniques are required when locating in a flood -prone area. Consult a registered professional or structural engineer to make sure that the home design and construction conform to applicable federal, state and local codes and regulations. The FEMA publication listed below contains design and construction recommendations. Severe Wind Areas. Special foundation and anchoring tech- niques are required when locating in a severe wind area. Consult a registered professional or structural engineer. The HUD foundations design guide referenced herein contains recommendations for designing foundations and anchoring systems. Do not place your home in a wind zone more severe than the one indicated on the data plate located by your home's main electrical panel. Special Snow Load Conditions. Homes designed for and located in heavy snowfall areas or subject to other extreme loading conditions may require special piers or footings. See tables and/or special manufacturer's instructions provided with your home. IMPORTANT REFERENCE DOCUMENTS • Foundation plans available from manufacturer. • ANSI/NCSBCS A225.1-1987, "Manufactured Home Installations," NCSBCS, 505 Huntmar Park Drive, Herndon, VA 22070, (703)437-0100. • ASCE 7-88, "Minimum Design Loads for Buildings and other Structures," ASCE, 345 East 47th Street, New York, NY 10017-2398. • FEMA 85, "Manufactured Home Installation in Flood Hazard Areas," FEMA, Washington, DC 20472, (202)646-2708, September, 1985. • HUD Handbook 4930.3 (1989), "Permanent Foundations Guide for Manufactured Housing," HUD, 415 7th Street, S.W., Washington, CD 20410. • "All Weather Wood Foundation Systems Manual," National Forest Products Association, 1619 Massachusetts Ave., N.W., Washington, DC 20036, June, 1976. • "Design Guide for Frost -Protected Shallow Foundations," Prepared for U.S. Dept. of Housing and Urban Develop- ment by NAHB, Upper Marlboro, MD, June, 1994, Instrument No. DU100K000005897. • "Building Foundation Design Guidebook," Document No. DE 88013350, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. • METER BASE AND PANELBOARD WIRING WITH MASTHEAD ALL ELECTRICAL WORK SHOULD BE PERFORMED ONLY BY QUALIFIED PERSONNEL. For homes with a factory installed meter base and mast- head, the correct procedure for wiring is as follows: 1. The outdoor (weatherproof) meter socket and service entrance panel may be mounted at any location on the exterior walls of the home with a fixed roof overhang. 2. Bond the service entrance conduit to the service entrance panel with an insulated bonding & grounding bushing. Use #6 (AWG) copper between ground lug on the bushing &-terminal on the panel. Use 94 (AWG) copper between ground -lug on the bushing & terminal on the panel with 200 and 225 amp service. Where threaded coupling and threaded bosses on enclosures with joints exist, they shall be made up wrench -tight in lieu of grounding bushing and strap. 3. A label is attached outside the home and near the service entrance conduit termination which reads: "This con- nection for 120/240 volt, 3 Pole, 3 Wire, 60 Hertz Ampere Service." The correct ampere rating is marked in the blank space. 4. A red label is attached adjacent to the service entrance breaker, which states: "WARNING - Do not provide electrical power until grounding electrode is installed and connected (see installation instructions)." 5. The grounding conductor shall be connected to the grounding fitting with suitable lugs, pressure connectors, and clamps. Connections depending on solder shall not be used. Rod and pipe electrodes shall not be less than 8 feet (2.44m) in length and shall consist of the following materials, and shall be installed in the following manner: (1) Electrodes of pipe or conduit shall not be smaller than 3/4 inch trade steel and, where of iron or steel, shall have the outer surface galvanized or otherwise metal - coated for corrosion protection. (2) Electrodes of rods of steel or iron shall be at least 5/8 inch (15.87mm) in diameter. Nonferrous rods or their equivalent shall be listed and shall not be less than 1/ 2 inch (12.7mm) in diameter. (3) The electrode shall be installed such that at least 8 feet (2.44m) of length is in contact with the soil. It shall be driven to a depth of not less than 8 feet (2.44m) except that where rock bottom is encoun- tered, the electrode shall be driven at an oblique angle not to exceed 45 degrees from the vertical or shall be buried in a trench that is at least 2-1/2 feet (762mm) deep. The upper end of the electrode shall be flush with or below ground level. Other methods of grounding electrode shall be in accor- dance with National Electric Code Article 250, Part H. 6. Equipment grounding connectors shall be bare, covered, or insulated. Covers or insulation shall be continuous and green, or green with one or more yellow stripes. 7. Approved fittings to be site installed on end of service entrance conduit to protect cables from abrasion. 8. Connect feeder conduit to conduit stub at distribution panelboard. 9. See Fig. 7-2 below. Clamp -on weather head 7 Service Entrance conduit (Rigid) ` RED 1-1/4" min. at 100 amp BLACK 1-1/2" min at 125 amp 1-1/2" min. at 150 amp WHITE 2" min. at 200 amp Roof flashing (neutral) 2-1/2" min at 225 amp 1/4" x 3" lag screws— U.L. listed outdoor (Type 3R) ca E meter socket and service o equipment panel. Pictorial o 2 hole galvanized only, actual equipment may pipe strap vary with each manufacturer. ' Field install 4 wire feeder to distribution panelboard. Use X Service Entrance Breaker copper 75 degree C rated conductors (types RH, RHH,�� RHW, w/o covering THW or XHHW). At 100 amp service - 3-#3 (AWG) w/#8 (AWG) ground • • • At 125 amp service - 3-#2 (AWG) w/#6 (AWG) ground At 150 amp service - 2-1/0 (AWG),1 #2 (AWG) w/#6 (AWG) ground At 200 amp service - 2-3/0 (AWG), 1 -1 /0 (AWG) w/#6 Threaded Hub (AWG) ground At 225 amp service - 2-3/0 (AWG), 1-1/0 (AWG) w/#6 (AWG) ground Service grounding electrode conductor, #6 (AWG) Conduit, rigid or Run feeder in Rigid or EMT bare copper. Coil 6' below floor to grounding EMT. To be field conduit. electrode. (Use #4 AWG with 200 or 225 amp installed 1-1/4" min. at 100 amp service.) 1-112" min. at 125 amp �-f--� 1-1/2" min. at 150 amp 2" min. at 200 amp 2-1/2" min at 225 amp FIG. 7-2 55 UTILITY SYSTEM CONNECTION AND TESTING (Continued) 54 Multisection Frame Bonding Ground clamp with screw Typical Under Chassis Feed Connections a. Flex conduit b. Feeder conductors c. Junction box d. Raceway e. Conduit connector f. Approved electrical connectors g. Insulated bushing �— Ground wire should be the same used on panel box FOUNDATION AND SUPPORT REQUIREMENTS (Continued) Front or rear crossmembers or any set of outriggers on opposite halves 1--d-MANUFAC T-U-R E-D-H-O-M-E 1-N S T-AL-L-A-T-1 O-N d d FLOOR e 9 CONDUCTORS f b a B - Black "hot R - Red "hot" W - White "neutral" e a G - Green "grounding" b Typical Meter Base Installation and Grounding BRANCH CIRCUIT FZZ MAIN PANEL MAIN „ METER DISCONNECT METER BASE 1 UNDING GROUNDIN EXTERIOR METER / PANEL BOX COMBINATION I ELECTRODE I / I ELECTROD OVERHEAD ENTRANCE JUMPER r MAIN PANEL ENCLOSURE SE ENTRY E BONDED TO ROUND ENCLOSURE BAR METER BASE NEUTRAL BUS BAR r, GROUNDING ELECTRODE CONDUIT OR CABLE SERVICE J =L I UNDERGROUND ENTRANCE ' MAIN PANEL METER SERVICE �BASE HEAD STRAP tt.. CONDUIT GROUNDING ELECTRODE ENTRANCE BELOW ROOF LINE SINGLE OR MULTI -SECTION HOMES TYPES OF FOUNDATION SYSTEM - MAIN COMPONENTS(*) 1_. -Piers-Ground Anchors. Home rests on piers of concrete block, formed -in -place concrete,_perman.ent wo-od_or_steel-- pedestals on permanent wood, crushed stone or concrete footers. Ground anchors in soil angled to resist straps or embedded in concrete deadmen in soil. Straps tied to the frame, with or without over -the -top straps. 2. Concrete Slab or Continuous Footing. Home rests on a concrete slab or ribbons of concrete. Straps tied between frame and perimeter footers or concrete slab. Skyline Corp. recommends installing earth anchors prior to pouring concrete slab. Concrete slab should be sloped to prevent water accumulation under home. 3. Pile/Post System. Home rests on piles/posts placed sufficiently deep in the ground to resist all wind, snow, frost heave and earthquake forces. Straps fasten home to the piles/posts or caps placed thereon. 4. Concrete or Concrete Block Load -Bearing Perimeter Walls (Basement or Crawl Space). Home rests on exterior loadbearing walls which sit on concrete footings' weight to resist all external forces. The floor connection to foundation resists external forces. *For Skyline multi -section homes, the mating walls are supported by piers or support walls with straps and ground anchors, providing resistance to downward and uplift forces. TYPICAL FOOTING PADS FIG. 4-1 16`� � "."16" \ I �6 l� I ' �i11 1/4^ SINGLE PAD FOOTING . i.� �\ Y DOUBLE PAD FOOTING SINGLE PAD FOOTING'24" • DOUBLE PAD �i TRIPLE PAD FOOTING Y iT . I �� DOUBLE PAD FOOTING , FOOTING . TWO DOUBLE PAD FOOTING ��y%'r � Y F\T`>>�� LOAD DISTRIBUTING PAD FOR SUPPORT TRIPLE PAD FOOTING LOAD DISTRIBUTING PAD FOR SUPPORT (24° X 24° X 4-) TWO DOUBLE PAD FOOTING QUAD PAD FOOTING 16"x16"x4" CONCRETE PAD FOOTINGS 8"x16"x4" CONCRETE PAD FOOTINGS 2"x12"x24" WOOD PAD FOOTINGS 11 FOUNDATION AND SUPPORT REQUIREMENTS (Continued) UTILITY SYSTEM CONNECTION AND TESTING (Continued) TYPICAL PIER CONSTRUCTION I -Beam frame Gap between top of pier and main frame may be hardwood plate (not exceeding 2" in thickness 'and shims (not exceeding 1" in thickness). Shims shall be at least 4" wide and 6" long, fitted an driven tight between wood plate or pier and main frame. 2" or 4" solid concrete block may fill } remainder of gap. Cap — Wood or concrete, 2" x 8" x 16" installed with 16" dimension perpendicular to the I-beam frame. Single open or closed cell concrete blocks 8" x 8" x 16" (open cells placed vertically upon footer) installed with 16" dimension perpendicular -to the I-beam frame. Footing - Solid concrete or other product approved for the purpose. /Size according to Table 4. Ground Level 7Footing below frost line when subject to frost heaving. ,SINGLE BLOCK PIER - 8000 LBS. MAXIMUM CAPACITY. PIER CAPACITY MUST BE EQUAL TO OR MORE THAN REQUIRED FnnTFR rAPArITY Cap - Solid concrete block or equivalent. Double Interlocked Blocks, Max. Height is 80". 'oncrete grouting — Steel reinforcing bars For piers exceeding 80 inches in height the concrete blocks should be filled with concrete grouting and steel reinforcing rods should be used. DOUBLE BLOCK PIER - 14000 LBS. MAXIMUM CAPACITY. PIER CAPACITY MUST BE EQUAL TO OR MORE THAN REQUIRED FOOTER CAPACITY. Footings placed on firm undisturbed soil or in controlled fill free of grass and organic materials compacted to a minimum load bearing capacity of 1000 PSF. Ft AVERAGE DEPTH OF FROST PENETRATION — IN INCHES SOURCE: U.S. Dept. of Commerce Weather Bureau 12 FIG. 4-2 ELECTRICAL ALL ELECTRICAL WORK SHOULD BE PERFORMED ONLY BY QUALIFIED PERSONNEL. The electrical supply connection to the manufactured home may be made by any of the following methods depending on the manufactured home construction and electrical service: a. Listed 50 ampere manufactured home power supply cord (50 amp service only) b. Permanent feeder connected to a factory installed mast weatherhead assembly. The routing, connection and support o tf -fie service drop is to be in accordance with local codes. c. Permanent feeder routed to the distribution panel through the factory installed feeder raceway which terminates beneath the manufactured home. Ajunction box or approved fitting must be used to connect the manufac- tured home feeder raceway to the supply raceway beneath the manufactured home. The proper feeder conductor sizes and the required junction box sizes are given in Table 7. After the connection has been made, the following tests should be conducted using approved test equipment: 1. Continuity test of circuit conductors OUTSIDE DISTRIBUTION PANEL BOARD Accessibility to distribution panel board, and the use of unit switches as disconnect means, is subject to the requirements of the local inspection authority. ELECTRICAL SYSTEM TEST With approved testing equipment, the following tests should be performed before connecting to the power source: • Continuity Test of Circuit Conductors A continuity test with all branch circuit breakers and switch- es controlling individual outlets in the "on" position should be conducted. There should be no evidence of connection between any of the supply conductors (including neutral) and the grounding circuit. • Continuity Test of Electrical Grounding System All noncurrent carrying metal parts of the electrical system including fixtures, appliances and the chassis of the home should be tested for continuity with the grounding circuit. The following test should be conducted after connecting and energizing the electrical system: • Polarity and Grounding Tests of 15 and 20 AMP Receptacle Outlets With circuits and lighting circuits energized, use a recep- tacle polarity tester to check polarity and grounding of each receptacle outlet. 2. Polarity test 3. Continuity test of electrical grounding system • MANUFACTURED HOME ELECTRICAL SUPPLY REQUIREMENTS TABLE 7 MAXIMUM LOAD & MAIN BREAKER SIZE (AMP) CONDUCTOR SIZE' (AWG) (TWO LINE AND ONE NEUTRAL) GROUNDING CONDUCTOR SIZE (AWG) FACTORY INSTALLED FEEDER RACEWAY TRADE SIZE (IN.) MINIMUM JUNCTION BOX SIZE 50 #6 #10 1" 6"x6"x6" 100 #3 #8 1-1/4" 8"x8"x4" 125 #2 #6 1-1/2" 10"x10"x4" 150 2-1 /0 & 142 #6 1-1/2" 10"x10"x4" 200 2-3/0 & 1-1/0 #6 2" 12"x12"x4" 225 2-3/0 & 1-1/0 #4 2-1/2" 15"x12"x4" 1. Conductor size and feeder raceway sized for copper, 75 degree C rated conductors, types RH, RHH, RHW without outer covering, THW or XHHW. WARNING CARELESS INSTALLATION OF TELEPHONE AND CABLE TELEVISION LINES MAY BE HAZARDOUS. The manu- factured home walls contain electrical circuits and the floor section may contain electrical circuits, plumbing or duct work. Extreme care must be exercised during drilling through and placing of communication cables within these cavities, to avoid contact with these home systems. Such work should be performed only by qualified personnel. FAILURE TO FOL- LOW THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH. 53 UTILITY SYSTEM CONNECTION AND TESTING (Continued) FOUNDATION AND SUPPORT REQUIREMENTS (Continued) The gas piping system was pressure tested for leaks prior to shipment; however, it is essential that the system be retested by qualified personnel for leaks prior to use. (Many utility compames require this on -site test.) The instructions printed on the tag near the gas supply connection must be followed (See Fig. 7-1). In some localities, utility companies and/or building inspec- tors may require additional tests as follows: 3. Check the gauge after 10 minutes; there should be no drop in pressure. - 4. Check the piping to appliances by pressurizing to at least 10 inches but no more than 14 inches water column and applying a bubble solution to all joints and flexible connec- tors. CAUTION: DO NOT PRESSURIZE THE SYSTEM ABOVE THE PRESSURES STATED ABOVE. 1. Isolate all appliances with appliance shut-off valves. PRESSURE SHALL BE MEASURED WITH A MERCURY The connection to the gas supply should be made only by ---MANOME—T-ER-OR-SLOPE—GAUGE-C-AL-IBRAT-ED-IN authorized -representatives of -the utility.--- --- INCREMENTS OF NOT GREATER THAN 1/10 POUND. 2. Pressurize the system to 3 psi and isolate the source of pressure from the gas piping. NOTE: BEFORE A TEST IS BEGUN, THE TEMPERATURE OF THE AMBIENT AIR AND OF THE PIPING SHOULD BE APPROXIMATELY THE SAME — CONDUCT THE TEST AT SUCH A TIME DURING THE DAY WHEN AIR TEMPERA- TURES WILL REMAIN CONSTANT. Combination LP — Gas and Natural Gas System This gas piping system is designed for use of either liquefied petroleum gas or natural gas. NOTICE: BEFORE TURNING ON GAS BE CERTAIN APPLIANCES ARE DE- SIGNED FOR THE GAS CONNECTED AND ARE EQUIPPED WITH CORRECT ORIFICES. SECURELY CAP THIS INLET WHEN NOT CONNECTED FOR USE. When connecting to lot outlet, use a listed gas supply connector for manufactured homes rated at ❑ 150,000 Btuh or more. ❑20,000 Btuh Before turning on gas, make certain all gas connections have been made tight, all appliance valves are turned off, and any unconnected outlets are capped. After turning on gas, test gas piping and connections to appliances for leakage with soapy water or bubble solution, and light all pilots. Fig. 7-1 NOTE: DO NOT BUBBLE CHECK BRASS GAS LINE FITTINGS WITH SOLUTIONS CONTAINING AMMONIA. SUPPORT REQUIREMENTS The design loads and minimum footing sizes used in the The support requirements for homes designed for 60 PSF and selection of the support structure are set forth in Table 4. higher roof load (and those specifically indicated middle and north The loads and footing sizes are the minimum values to be zone homes) are found in the supplement accompanying this used for the support structure and are based on the manual entitled "Manufactured Home Installation for Perimeter indicated roof live load and a floor live load of 40 PSF. Blocking." -All-load-bearing-supports-and-footings-may-be--subjectAo C—ontactthe Skyline div'rsiun that builtthe home for more approval by the local Enforcement Agency. information concerning perimeter blocking. TABLE 1 PIER -LOADING UNDER MAIN I -BEAMS SINGLE -WIDE HOMES 12' WIDE HOMES 14' WIDE HOMES 16' WIDE HOMES Pier Spacing Under Main I -Beams (Ft.) Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone - 4 2130 2420 2560 2410 2740 2940 2700 3060 3320 5 2660 3020 3190 3020 3420 3670 3370 3830 4150 6 3190 3620 3830 3620 4110 4410 4050 4590 4980 7 3720 4230 4470 4220 4790 5140 4720 5360 5810 8 4250 4830 5110 4820 5480 5880 5400 6120 6640 9 1 4780 5440 5750 1 5430 1 6160 1 6610 6070 1 6890 1 7470 10 5320 6040 6380 6030 1 6850 1 7340 6750 7650 8300 Wt. Per Foot See Note 4 532 604 638 603 685 734 675 765 830 ' NOTES: 1. See Table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. The footing sizes and pier loads are minimums required for the applicable conditions. The footing shall not be smaller than the pier it supports of 144 square inches. 2. The maximum spacing of supports is not to exceed 10 feet. 3. Where it is impractical to maintain spacing, such as in the axle area, the average of the distance to each adjacent support may be used to determine support requirements. For example: if the distances to the adjacent supports were 6'-0" and 8'-0", the average spacing would be 7'-0"• ``���t�i�i�rl�i��� % 6' 0" 8' 0" CERT ' I I I # 09703 -a.JiaE '. P. Pier Pier B Pier C The average spacing for pier B would be (6 + 8) / 2 = 7 ft., therefore, pier B would be designed for 7 ft. pier spacing. 52 4. The last line in the above Table is the weight per foot each main I-beam is carrying. Multiply this number by the span a pier is carrying to determine the required capacity of that pier. 13 FOUNDATION AND SUPPORT REQUIREMENTS (Continued) CHAPTER 7 TABLE 2 PIER LOADING UNDER MAIN I -BEAMS DOUBLE -WIDE HOMES 20' WIDE HOMES 24' WIDE HOMES 26' & 28' WIDE HOMES 32' WIDE HOMES Pier Spacing Under Main I -Beams (Ft.) Pier Load (Lbs) 20 PSF I Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF_ Roof — Zone 4 1810 2060 2170 2100 2390 2560 2360 2630 2940 2680 3000 3320 5 2270 2580 2710 2630 2980 3190 2950 3350 3670 3350 3750 4150 6 2720 3100 3260 3150 3580 3830 3540 4020 4410 4020 4500 4980 7 3170 3610 3800 3680 4180 4470 4130 4690 5140 4690 5250 5810 8 3630 4130 4340 4200 4770 5110 4720 5360 5880 5360 6000 6640 9 4080 4640 4880 4730 5370 5750 5310 6030 6610 6030 6750 7470 10 4540 5160 5420 5250 5970 6380 5900 6700 7340 6700 7500 8300 Wt. Per Foot See Note 5 454 516 542 525 597 638 590 670 734 670 750 830 NOTES: See Table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. The footing sizes and pier loads are minimum required for the applicable conditions. The footing shall not be smaller than the pier it supports of 144 square inches. 2. The maximum spacing of supports is not to exceed 10 feet. 3. Where it is impractical to maintain spacing, such as in the axle area, the average of the distance to each adjacent support may be used to determine support requirements. For example: if the distances to the adjacent supports were 6'-0" and 8'-0", the average spacing would be 7'-0". SCOW T •. I I # 1 1 •* I =� ..NA;601 EN Pier Pier B Pier C +-zi.9-7 UTILITY SYSTEM CONNECTION AND TESTING Many local jurisdictions have special requirements for utility connections and on -site inspection of these connections. Con- sult with the proper authorities prior to utility connection. Use only qualified service personnel, familiar with local codes and licensed where required. The drainage and water systems were tested for leaks prior to shipment from the factory. It is essential that they be rechecked by qualified personnel for leaks that may have been caused=by-vibration=during-transportation WATER The water system has been designed for an inlet water pres- sure of 80 psi. If the manufactured home is installed in areas where the water pressure exceeds 80 psi, a pressure reducing valve should be installed. The water system may be connect- ed to any safe, potable water source. The connection is via a single 3/4 inch inlet beneath the home. A master shut-off full flow valve must be installed in the water supply line adjacent to the home; this -valve should be a full port gate or ball valve with threaded or solder joints. After removing the aerators from all the faucets, open all the faucet valves and allow the water to run for 15 minutes. This should remove any foreign particles left in the line that might cause an unpleasant taste or become lodged at faucet washers and cause dripping faucets. All ex- posed water piping subject to freezing should be protected by insulation and electric heat tapes (with an integral thermostat) listed for use with manufactured homes. It is recommended that only UL listed heat tapes be used and installed in accor- dance with their installation instructions. DRAINAGE — CONNECTION The drainage connection is made at the 3-inch main drain outlet. Care should be exercised to slope and support the drain line from the home to the site sewage system (1/4" per foot slope). The average spacing for pier B would be 6 + 8 / 2 = 7 ft., therefore pier B would be designed for 7 ft. pier s acin DANGER: IMPROPER OR INADEQUATE TESTING, CON- NECTION OR MODIFICATION OF ANY PART OF GAS OR 4. Concentrated loads at marriage line (see Table 3). ELECTRICAL SYSTEMS, ESPECIALLY BY UNQUALIFIEDPERSONNEL, MAY BE EXTREMELY DANGEROUS AND MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH. 5. The last line in the above Table is the weight per foot each main I-beam is carrying. Multiply this number by the span a pier is carrying to determine the required capacity of that pier. GAS — The gas piping system was designed for a range of 7 to 10 1/2" of water column for natural gas and 11 to 14" of DRAINAGE —1, 1 1/2, 1 3/4 & 2 BATH When applicable the parts required to bring all drain lines to a single point are provided as follows: 1. Pipe and fittings. 2. 1/4 pint of ABS solvent cement. 3. 10 feet of 3/4" x 28 gauge plumbing strap. 4. Ten 1/4" x 1 " stove bolts. The procedure for bringing all drain lines to a single point is as follows: 1. Remove caps on drain outlets and connect supplied parts together as shown by the drain line schematic shipped with the house. (Do not apply cement). 2. Check to be sure that the assembly has the proper 1/4 inch drop per foot. 3. Mark each joint to aid in reassembly. Start at outlet end of system and remove, cement and reassemble each slip joint one at a time. Be sure to apply the cement on both male and female ends with a good even coating. 4. Using the 3/4" x 28 gauge strapping, strap the drain line to the center crossmembers of the frame placing a strap at each member (4 feet apart). Use a 1/4" x 1" stove bolt to secure strap in place. 5. Connect home drain to site sewage system as for single bath previously discussed. 6. Check completed system for leaks. water column for LP gas. The manufactured home gas supply pressure must be within this range for safe and efficient opera- tion of the gas piping system. 14 51 INSTALLATION OF OPTIONAL FEATURES (Continued) FOUNDATION AND SUPPORT REQUIREMENTS (Continued) FIELD INSTALLED TERMINATION OF FIREPLACE CHIMNEY. - TABLE 3 PIER LOADING UNDER CENTERLINE BEAMS DOUBLE-W1D-E-HOMES_ -- - - - Termination cap - field installed Storm collar - field installed Flashing - field installed Top section of flue pipe - field installed Factory installed thimble Factory installed flue pipe 10 feet or less (typical) !JRicdge'Beam Truss (typical) Upper and side shingles overlap r----------- ; flange and are set in asphalt Flue pipe I cement i Lower part of flange overlaps lower shingles SHINGLE INSTALLATION AROUND FLUE PIPE 20' WIDE HOMES 24' WIDE HOMES 26' & 28' WIDE HOMES 32' WIDE HOMES Span Between Columns (Ft.) See note 1 Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone Pier Load (Lbs) 20 PSF Roof Zone Pier Load (Lbs) 30 PSF Roof Zone Pier Load (Lbs) 40 PSF Roof Zone 6 900 1200 1500 1080 1440 1800 1260 1680 2100 1350 1800 2250 10 - 1-500— --2000- -- —2500— —180 4010— __W50 - 2100 2800 3500 2250 3000 3750 12 1800 2400 3000 2160 2880 3600 2520 3360 4200 2700 3600 4500 14 2100 2800 3500 2520 3360 4320 2940 3920 4900 3150 4200 5250 16 2400 3200 4000 2880 3840 4800 3360 4480 5600 3600 4800 6000 18 2700 1 3600 1 4500 3240 4320 5400 3780 5040 6300 1 4050 1 5400 6750 20 3000 1 4000 1 5000 3600 4800 6000 4200 5600 7000 1 4500 1 6000 1 7500 24 3600 1 4800 1 6000 4320 5760 7200 5040 6720 8400 1 5400 1 7200 1 9000 NOTES: 1) Where a column is located between two openings, sum the loads for each opening to obtain the required pier load. 2) See table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. 3) The concentrated load consist of roof load only. 4) Pier locations at the marriage wall are marked with paint or metal indicator straps. 5) Piers used side by side to obtain the required load are permissible. PIER LOADING AND INSTALLATION UNDER SIDEWALL DOORS AND WINDOWS Typical door or window opening - Width varies • see table below. T t 1) Install shingles up to edge of factory cut-out in roof decking. Cut shingles installed under roof flashing are set in asphalt cement. 2) Place flashing over pipe section and shingle and set in asphalt cement. Tack flashing to roof deck at top 2 corners with roofing nails. 3) Resume shingle application. Cut shingles in successive courses to fit around the pipe and embed them in asphalt cement where they overlap the flashing. Secure shingles with roofing nails through flashing and apply asphalt cement over nail heads. 4) The completed installation should appear as shown above, with the lower part of the flange overlapping the lower shingles and the side and upper shingle overlapping the flange. NOTES: 1) The upper portion of the fireplace chimney assembly has been left off due to transportation height restrictions. 2) The final section of flue pipe, roof flashing, storm collar and termination cap for the fireplace are required to be field installed. 3) Remove temporary close -off material from roof and top of flue pipe that has been factory installed. 4) Install parts listed in 2 above per the fireplace manufacturer's installation instructions. 5) Install roof shingles around chimney pipe per instructions above or per ARMA residential asphalt roofing manual instructions. 6) All required parts for completion of chimney have been shipped with the home, including the manufacturer's installa- tion instructions. 7) Applicable only to Coleman Deluxe II model, 36ECMII solid fuel burning fireplace. 8) All other aspects of the setup of the home are to be in accor- dance with this manual. 50 WARNING This appliance has been shipped with the flue assembly partially disassembled. The flue assembly must be completed in accordance with the installation instructions prior to use of this appliance. The label above has been placed on the fireplace in your home if the chimney assembly is required to be field completed. Floorjoists Typical Pier 4x4 block, 4" longer than joist spacing. Installed such that it �' spans joists on either side of doorjamb. Pier installed when Pier installed when joist is not under joist is under doorjamb. doorjamb. A sidewall See note 6: TABLE 3A 11n;f cirlou 11 SECTION 'A -A' Floorjoists tier 4: OPENING 1 �. l: •' •' Nominal Unit Width (Ft.) ... (Lbs) 1 PSF Roof Zone FRW... (Lbs) 30 PSF Roof Zone 71"•.• (Lbs) 40 PSF Roof Zone - ... (Lbs) 20 PSF Roof Zone ... (Lbs) 30 PSF Roof Zone ... (Lbs) 41 PSF Roof Zone - •.. (Lbs) 20 PSF Roof Zone ON •.. (Lbs) 30 PSF Roof Zone - ... • 40 PSF Roof Zone - ... ... 30 PSF Zone •.• �� :•1 .1 1 ���.11� •.1 ��w.1� 11 .11 :1 •.1 •:1 • 1 � t,l .l .1 NKE.I:�11�wOF F1 �[ � • 1 : • 1: • 1� 11 1 1 1 : 1 1 1 �I I l.ml : • 1 , 1 miff1 tI�I:1�111�• 1� .1 ! '�' .•1 '1 • 1 c1 '•1 tfi[III� ��11�r11l�• �•I �. GI 11 IN . I 1 • 1 : 1 o 1� : 1 ��� ���� .1 IN 11111�'71l01 . 1 • : 1 o1 1 11 :.1 �� � 11 • 1 ��lif.7�lt�i��w� .1 • 1 . 1 • � 1 • 1 � 1 • 1 ���� �1611�11•��.tICIII!•t11,:L11!• . 1 NOTES: 1) Piers are required at all entry doors and window openings greater than four feet. 2) Piers are also required at bay windows where the sidewall opening is greater than four feet. 3) Piers are not required at door and window openings located along endwalls. 4) Piers are not required at some door and window locations if the floor has been reinforced at the factory. Contact the division that built your home to determine if this is applicable to your home. 5) See table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. 6) Maximum pier setback is 6". If pier load (from table 3A) is 1240 lbs. or less, and nominal unit width is 12', 14', 20', 24', 26', or 28', then setback may be 10" max. If pier load (from table 3A) is 1930 lbs. or less, and nominal unit width is 16', 18', or 32', then setback may be 10" max. 7) For piers between multiple openings, sum the loads for each opening to obtain the required load. 15 FOUNDATION AND SUPPORT REQUIREMENTS (Continued) INSTALLATION OF OPTIONAL FEATURES (Continued) 16 PAVILION DORMER BLOCKING NOTES: 1) All units that have a Pavilion dormer require additional perimeter blocking. 2) Install piers under door/window openings and at each end of Pavilion wall. Install piers 4'-0" o.c. max between end of pavilion wall and door/window opening. 3) See table 3A for required pier capacities under windows or doors. 4) Piers located at each end of wall and spaced 4'-0" o.c. shall support 1300 lbs. min. 5) For roof loads in excess of 40 PSF, install piers per the "Manufactured Home Installation for Perimeter Blocking" supplement. TABLE 4 FOOTING SIZES FOOTING SIZES (IN x IN) OR EQUAL AREAS (SQ. IN.) ALLOWABLE SOIL BEARING VALUE REQUIRED 1000 PSF 1500 PSF 2000 PSF 3000 PSF 4000 PSF 6000 PSF PIER LOAD REQUIRED TYPICAL REQUIRED TYPICAL REQUIRED TYPICAL REQUIRED TYPICAL REQUIRED TYPICAL REQUIRED TYPICAL CAPACITY AREA SIZES AREA SIZES AREA SIZES AREA SIZES AREA SIZES AREA SIZES (POUNDS) (SQ.IN) (IN.xlN.) (SQ.IN) (IN.xlN.) (SQ.IN) (KAN.) (SQ.IN) (IN.AN.) (SQ.IN) (IN.xlN.) (SQ.IN) (KAN.) 1500 216 12x20 144 12x20 144 12x20 144 12x20 144 12x20 144 12x20 2000 288 16x20 192 12x20 144 12x20 144 12x20 144 12x20 144 12x20 2500 360 18x20 240 12x20 180 12x20 144 12x20 144 12x20 144 12x20 3000 432 20x22 288 16x20 216 12x20 144 12x20 144 12x20 144 12x20 3500 504 22x24 336 18x20 252 1420 168 12x20 144 12x20 144 12x20 4000 576 2424 384 20x20 288 16x20 192 12x20 144 12x20 144 12x20 4500 648 26x26 432 20x22 324 18x20 216 12x20 144 12x20 144 12x20 5000 720 26x28 480 22x22 360 18x20 240 12x20 162 12x20 144 12x20 5500 792 28x30 528 22x24 396 20x20 264 1420 180 12x20 144 12x20 6000 864 30x30 576 2424 432 20x22 288 16x20 198 12x20 144 12x20 6500 936 30x32 624 2426 468 22x22 312 16x20 216 12x20 156 12x20 7000 1008 32x32 672 26x26 504 22x24 336 18x20 234 12x20 168 12x20 7500 1080 32x34 720 26x28 540 2424 360 18x20 252 1420 180 12x20 8000 1152 34x34 768 28x28 576 24x24 384 20x20 270 1420 192 12x20 8500 1224 3436 816 28x30 612 2426 408 20x22 288 16x20 204 12x20 9000 1296 36x36 864 30x30 648 26x26 432 20x22 306 16x20 216 12x20 9500 1368 36x38 912 30x32 684 26x28 456 22x22 324 18x20 228 12x20 1440 38x38 960 30x32 1 720 26x28 480 22x22 360 18x20 94o 12x20 TABLE 4A COMMON FOOTING SIZES AND CAPACITIES FOOTING CAPACITY AT VARIOUS ALLOWABLE SOIL BEARING VALUES (Pounds) FOOTING SIZE 1000 PSF 1500 PSF 2000 PSF 3000 PSF 4000 PSF 6000 PSF 16"x16" 1780 2665 3555 5335 7110 10665 18"x18" 2250 3375 4500 6750 9000 13500 24"x24" 4000 6000 8000 12000 16000 24000 16"x32" 3555 5335 7110 10665 14220 21335 32"x32" 7110 10665 14220 21335 — — 12"Round 785 1180 1570 2355 3140 4712 16" Round 1395 2095 2790 4190 5585 8375 18" Round 1765 2650 3535 5300 7070 10600 24" Round 3140 4710 6280 9425 12565 18850 36" Round 1 7070 1 10600 1 14135 21205 1 — — EXPANDING ROOMS, SLIDE -OUTS, ETC. Where optional expanding rooms, slide -outs, tip -outs, etc. are provided, specific instructions and directions are provided for proper installation and set-up. INSTALLATION OF SITE INSTALLED ATTACHED STRUCTURES All site installed attached structures, including garages, porches, steps, stairways and landing must be designed and constructed to support all of their own dead load and all of the live load to which it will be subjected. Attached structures should be constructed in accordance with the manufacturer's installation instructions and all applicable local codes. In par- ticular, attached garages generally require fire protection and GFCI electrical circuit protection as required by local code. HINGED ROOFS AND EAVES Where optional hinged roof and/or hinged or prefabricated field installed eaves are provided, supplemental installation instructions are provided. CEILING (PADDLE) FANS Site provided and installed ceiling fans are to be installed in accordance with the manufacturer's installation instructions. To reduce the risk of injury, the minimum dimension from the trailing edge of the fan blade to the floor must be in accor- dance with the manufacturer's requirements. TELEPHONE AND CABLE TV Careless installation of telephone and cable television lines may be hazardous. Electrical circuits, plumbing and duct work are contained in the floor and walls of the home. Avoid con- tact with these systems when drilling into and placing cables in these cavities. FAILURE TO FOLLOW THESE INSTRUC- TIONS MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH. FIREPLACE INSTALLATION Because of transportation restrictions, fireplaces require on -site installation of additional section(s) of approved, listed chimney pipe, a spark arrestor and a rain cap assembly. The fireplace manufacturer's installation instructions and all required components for proper installation are included in each home with a fireplace. SITE INSTALLED, FIREPLACE HEARTH EXTENSION The home will be shipped with fireplace installed. The block- ing between the bottom of the fireplace and the floor shall be removed. The carpet where the hearth is going to be placed shall be removed. A bead of noncombustible fireplace mortar or gasket cement shall be run to seal the joint between hearth extension and face of the fireplace. The edge of the hearth extension shall be placed under the fireplace surround and centered in front of the fireplace. The carpet tackstrip shall then be placed around the hearth to secure it. (See Fig. 6-6). Non-combustible mortar or gasket cement Fireplace 'JNJi Ilf:. � r. �: ir:: !: J: N.•!'1::: h": h'::: J :': X: Hearth extension FIG. 6-6 49 INSTALLATION OF OPTIONAL FEATURES (Continued) STANDARD BLEND -AIR INSTALLATION WITH DEALER INSTALLED EXTERIOR HEATING/COOLING Figure 6-5 below depicts the Evcon Standard Blend -Air installation used with homes designed for dealer installed exterior heating -cooling systems. The Evcon Standard Blend -Air unit provides whole - house ventilation -and -is -designed -to -operate -when - the exterior heating or cooling system is in use. The following information is important when electri- cally interconnecting the Standard Blend -Air with the exterior heating -cooling unit system: Chase fully enclosing flex duct. Standard Blend -Air control box Access panel removed, exposing damper tube assembly. Grille with filter (Access to Blend Air filter) 4-Wire thermostat cable to outdoor unit. See manufac- turer instructions for wiring to exterior heat -cooling unit. Roof Line 1. The Standard Blend -Air must be connected to a heating -cooling unit with transformer having at least a 40 Va. Capacity. 2. The wiring of 4-wire thermostat cable from the Blend -Air control to the exterior heating -cooling controls -is -to -be -as -follows —.- -Green Connector - blower continuous run -Red connector - 24 v. supply -White connector - system heating -Yellow connector - system cooling Ceiling Cavity --- ' Factory installed 4-wire thermostat cable to indoor thermostat. Box airtight (except @ air return & grille with filter). Note: The Unit must be operated from one transformer having at least Return Air 40 Va. Capacity. TABLE 4B MAXIMUM FOOTING SIZE PER FOOTING THICKNESS PIER Minimum Footing Thickness —DESCRIPTION— Single Concrete 4" 6" 8' 12" 30"x30" squareff40N40" square U) Block 36" round am Double Concrete 38"x38" square 48"x48" square U Block 44' round W.0' Single or Double 34"x34" square 45"x45" square o Steel Pier 40" round om Quad steel Pier 46"x46" square o Single Concrete 22"x22" square WNW' square 38"x38" square T �.6 Block 28" round 38" round 48" round Ea Double Concrete WNW' square 38"x38" square 46"x46" square u_ U Block 36" round 46" round COT Single or Double 26"x26" square 34"x34" square 42"x42" square o as Steel Pier 32" round 42" round o a) N0° Quad steel Pier 38"x38" square 46"x46" square 44" round Single Concrete 20"x20" square 26"x26" square 32"x32" square 46"x46" square U )= Block 24" round 32" round 40" round aC Double Concrete 28"x28" square 34"x34" square 40"x40" square U Block 32" round 40" round 48" round Single or Double 24"x24" sq uare 3 NW' square 36"x36" square o� Steel Pier 28" round 36" round 44" round C3M Quad steel Pier 36"x36" square 42"x42" square 48"x48" square 40" round 48" round Single Concrete 16"x16" square 20"x20" square 26"x26" square 34"x34" square in._ Block 20" round 24" round 30" round 42" round aDouble Concrete 24"x24" square 28"x28" square 34"x34" square 42"x42" square CU as Block 28" round 34" round 40" round U U) rn Single or Double 20"x20" square 24"x24" square 30"x30" square 39"x39" square o_ S; Steel Pier 24" round 30" round 34" round 46" round om Quad steel Pier 32"x32" square 36"x36" square 42"x42" square 48"x48" square co 36" round 42" round 48" round Note: 1. Concrete blocks are 8"x16" minimum. 2. Steel piers have 12" square base minimum. 3. Double steel pier may not be used on this footing. 48 FIG. 6-5 17 CHAPTER 5 INSTALLATION OF OPTIONAL FEATURES (Continued) SET-UP PROCEDURES WARNING: WHEN SETTING UP THIS HOME, THE FOLLOWING PRECAUTIONS REGARDING JACKING MUST BE FOLLOWED. Moving Home To Location: Make sure the following items are completed before placing the home: • The site is properly prepared. See Chapter 3. • All concrete work necessary to setting the home is finished • Utilities are installed or available. • Any trenching, for crossover drain lines or for wheels that will be left in place, is complete. • Items that could be difficult to install after the home is sited (such as anchors and ground moisture retarders) are in their proper locations. CAUTION: THE HOME WEIGHS SEVERAL TONS. USE ADEQUATE TEMPORARY SUPPORT BLOCKING TO SAFEGUARD WORKERS. SKYLINE CORP. RECOM- MENDS WOOD BLOCKING. Positioning Home. When not placing the home on a con- crete slab or poured -in -place footings, mark the corners of the home and lay out footings and support devices close to where they will be used. Then move the home or first section into position. Leveling and Blocking — Single -Wide Homes. 1. Before doing any jacking, place support piers for the home in the location under the home as specified in the home instal- lation instructions. 2. Use a minimum of two jacks, each with a rating of at least ten tons. 3. Jack only on the main chassis I-beam. Locate the jack directly under the vertical web of the I-beam. Do not jack on the seam (joint between flanges) of a twin I-beam. 4. Use a large 3/8 inch thick steel plate, C-channel or other equivalent plate between the main chassis I-beam and the jack head to distribute the load. 5. The jack base and any blocking must be located on firm ground. 6. Do not operate the jacks while you are under the main (-beams of the home. 7. Use jacks only for raising the home. Do not rely on the jacks to support the home. 18 8. Place 4" x 6" x 48" min. safety timbers between the k beams and ground in case of jack failure. Timber should be hardwood. 9. Raise the home in small increments and provide additional blocking between the home and the piers and safety piers as the home is raised. 10. Do not go under the home while it is supported on the jacks unless safety timbers capable of supporting the home are in place. FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR DEATH. Reminders before jacking... 1. Use only jacks in good condition with a minimum rating of 10 tons. 2. Use a minute man C-Channel jacking plate or equivalent between jack and steel I-beam to distribute the concentrated loads. (See Figure 5-1) 3. Use a firm support under the jack base to prevent tipping or settling of the jack. Skyline recommends a 12" x 12" or larger pad. 4. Always follow the sequence of jacking outlined below to avoid overstressing structural members. T-BEAM C-CHANNEL 8" LONG t 10 TON JACK JACK SUPPORT - LOCATE ON FIRM SOIL III-III=III -III=III-III=11 = III =III =III =III = III = I I AIR CONDITIONING ELECTRICAL CONNECTION (Factory Provided Circuits) THE ELECTRICAL CONNECTION SHOULD BE MADE ONLY BY QUALIFIED PERSONNEL. THE COMPLETED INSTALLATION MUST CONFORM TO ARTICLE 440 OF THE NATIONAL ELECTRI- CAL CODE AND APPLICABLE LOCAL CODES. Factory installed branch circuits for air condition- ing _areyindicated on the data plate under the head- ing "Rating of Factory Installed Circuit." The maxi- mum full load ampere draw for the desired air con- ditioning unit must not exceed the indicated branch circuit rating. "A" coil air conditioning units installed must be listed for use with the furnace in this home; for air conditioning installation, see the instructions shipped with the air conditioner. If a self-contained air conditioner is to be installed and connected to the heating supply duct the installation must include a damper beneath the furnace to prevent cool air from "backing -up" into the furnace durin,9 the cool- ing mode and a damper at the air conditioner supply to prevent heated air from "backing -up" into the air conditioner during the heating mode. It is recom- mended to wrap the dampers with insulation. 4 The electrical connection is via a branch circuit terminating in a Junction box beneath the home (See Fig. 6-3). The field installation wiring beyond the junction box must incorporate a fused discon- nect (sized in accordance with NEC Article 440) located within sight of the condensing unit. The maximum fuse size to be used with fused discon- nect is marked on the condenser data plate. The acceptability of the air conditioning equipment, rating the location of disconnect means, fuse type branch circuit protection, and connections to the equipment are to be determined by the local inspec- tion authority. For some models the electrical connection is made to the home via a separate rigid conduit. The conduit is 1" and is run from the panelboard and terminates below the bottom board. A PVC cap is cemented to the end of the conduit and this must be cut off to provide access to the panel board. Wiring is then installed from the panelboard to the air con- ditioner per all applicable NEC & local codes and all requirements listed above. Condensation should not be allowed to drain under home. NOTE: REFER TO N.E.C. AND AIR COND. INSTRUCTIONS FOR INSTALLATION REQUIREMENTS DISTRIBUTION PANELBOARD FIELD PROVIDED ------- -_--�&INSTALLED JUNCTION BOX- FUSED DISCONNECT BENEATH HOME REMOTE CONDENSING CONDUIT UNIT m=m=u�=ui=lu =ui FIG. 6-3 NOTE: THE ELECTRICAL CONNECTION SHOULD BE MADE ONLY BY QUALIFIED PERSONNEL. 1.• On models equipped for installation of optional evaporative cooler, install the roof -mounted cooler according to the instructions with the cooler. For coolers without an integral air duct the cooler box shall be lined with 0.013 in. metal. The factory installed branch circuit for the cooler is sized for a maximum cooler electrical load of 12 amperes. 120 V. AC, 60 Hz. 2. Remove the cover from the roof -mounted junction box and make the connection of the color -coded wires using the provided wire nuts. The electrical portion of the installation is now complete (See Fig. 6-4). = III —III =III =III COLOR CODE 11 = III = III = WHITE ................................................... Neutral YELLOW................................................ Pump BLACK ................................................... High Fan FIG. 5-1 RED ....................................................... Low Fan GREEN .................................................. Ground EVAPORATIVE COOLER LOCATED ON '— ROOF OF HOME WEATHERPROOF BOX ROOF JACK ROOF FIG. 6-4 47 INSTALLATION OF OPTIONAL FEATURES (Continued) SET-UP PROCEDURES (Continued) B. PROTRUDING RIDGE BEAM For proper ceiling fan installation, a prefabricated box has been -provided -and -includes -the -electrical -box -for -containment of the spliced wires with their connectors. The prefab box is also designed to conceal the wire which is run through the ceiling where the fan is to be located. CAUTION: BEFORE FOLLOWING THE STEP-BY-STEP PROCEDURE, BE SURE THAT POWER TO FAN WIRE IS OFF. 1. Remove the fan manufacturer's installation instructions from the package and determine the method of fan attach- ment to the beam. (Also see Fig. 6-2). 2. Insert the ceiling wire through a side knock out hole in the electrical box. Secure the wire in the electrical box clamp at a point approximately 4" from its end. FIG. 6-2 B FAN V FROM C 3. Place the prefab box in its final position on the beam and secure the box to the beam with #6x2" wood screws (pro- vided)-i n-the-metal-corner-braces- 4. Strip about 3/4" of insulation from the white and black con- ductor ends. 5. Position the noncombustible flash ring (provided) over the electrical box so that the finished surface (adjacent to electri- cal box) which is to be covered by fan canopy is not exposed. 6. Follow the manufacturer's installation instructions for mount- ing the fan assembly to the box and for electrical wiring of the -fan.--Use-provided-electrical-connectors-for splicing -wires. -BE certain that fan is grounded as specified in manufacturer's instructions and that wires are connected properly (white to white and black to black). ELECTRICAL BOX -0- CLAMP WIRE AT BOX INLET: CLAMP PROVIDED WITH BOX. (4" MIN. FREE CABLE IN BOX) C. FALSE RIDGE BEAM For proper ceiling fan installation, an electrical box and a decorative foam block have been provided for attachment to the false beam at the unit centerline. The prefab box is also designed to conceal the wire which is run through the ceiling where the fan is to be located. CAUTION: BEFORE FOLLOWING THE STEP-BY-STEP PROCEDURE, BE SURE THAT POWER TO FAN WIRE IS OFF. 1. Remove the fan manufacturer's installation instructions from the package and determine the method of fan attach- ment to the beam (See Fig. 6-2A). 2. After ridge beam halves have been secured together, fasten bottom halves of false beam together with 16d nails 16" o.c. (max). 3. Attach gypsum close -off panel (provided) with staples 6" o.c. around perimeter. 4. Secure decorative foam block to false beam with 2-16d nails or 2-#8x3" screws. 5. Attach electrical box (U.L. listed for use with paddle fan) per its listing (installation) requirements (provided). 46 PRE-FAB BOX FASTENED TO BEAM w/2-#6X2" SCREWS EACH SIDE 6. Strip about 3/4" of insulation from the white and black conductor ends. The jacking -procedure is as follows: 1. After the home is located in its final position, you can preliminarily level it by using the hitch jack but only after ad- equately wheel blocking the home so it does not roll. 2. Jack up one side of the home by placing one jack just forward of the front spring hanger and the other just behind the rear spring hanger. —These two tacks�be opera e simultaneously to raise the home. Jack low side of the home first. Install footings and piers; one just forward of the front jack and another just behind the rear jack (taking care not to exceed the correct spacing selected from Table 1 or 2). 3. Next, jack the main I-beam at the front and position a pier within 2'-0" of the end of the I-beam. At the completion of this step, this side of the home should be approximately level. 4. Repeat Steps 2 and 3 for the other side of the home. At the completion of this step, the home should be roughly level from front to rear and from side to side. 5., _ Place the remaining pier supports under the main I-beam on each side taking care to maintain a maximum distance of no more than the spacing determined from Tables 1 or 2 with t piers located with 2"-0" of each end of each I-beam. (See Fig. 5-2) 7. Follow the manufacturer's installation instructions for mount- ing the fan assembly to the box and for electrical wiring of the fan. Use provided electrical connectors for splicing wires. Be certain that fan is grounded as specified in manufacturer's instructions and that wires are connected properly (white to white and black to black). —� Ridge Beam False Beam Toe -nail bottom halves �� ~— Electrical wire - factory of false beam together installed paddle pan. w/16d nails 16" o.c. Decorative foam block. Gypsum close- Fasten to beam w/2-16d off panel - fasten ® nails or 2-#8x3" screws. to false beam w/staples 6" o.c. around perimeter. p Electric box - U.L. listed for use with paddle fan. Secure to false FIG. 6-2A beam per its installation requirements. 6. Level the home within reasonable tolerances, using a 6 foot carpenter's level, water level, or similar equipment. The final height adjustment is obtained by jacking the I-beam and placing hardwood shims between the piers and I-beam, or other approved methods such as adjustable piers. THIS LEVELING PROCESS IS IMPORTANT FORAPPEARANCE AND IS ESSENTIAL FOR THE PROPER OPERATION OF DOORS, WINDOWS, AND THE DRAINAGE SYSTEM. 7. Place additional supports at each side of sidewall door and window openings over 4'0" wide. (See Table 3A) 8. Within 90 days after initial set-up, the home should be releveled, if necessary to compensate for any pier settlement. Follow the procedure in Item 6 above. NOTE: DURING THE LEVELING OR RELEVELING PRO- CESS, LOOSEN FRAME TIES AND OVER -THE -ROOF TIES (IF PROVIDED) PRIOR TO JACKING HOME. r 1 T r I -BEAM r r L J L. 2'-0" MAXIMUM PIER SPACING AS SELECTED FROM TABLE 1 1 \TYPICAL PIER LIJ L}J r -i r-� L J T 10'-0,. i MAX. r-Tn r" L_J L=J - 2'-0" FIG. 5-2 19 SET-UP PROCEDURES (Continued) INSTALLATION OF OPTIONAL FEATURES (Continued) LEVELING AND BLOCKING, DOUBLE -WIDE HOMES With the exception of the requirement for support under the marriage wall of double -wide units, leveling and blocking pro- cedures are the same as for single -wide units. The site must be prepared as previously described. Special consideration must be given to the footings and pier construction required by (1) local soil conditions, (2) depth of frost line and (3) special requirements for local jurisdictions. It maybe desir- able to construct the footings and piers (to grade height) prior So II Cn M z x 0 z w Q z_ 9 0 z Pier at centerline within 1' of front and rear wall. This pier required only if there is a column located at the front or rear wall. (See Table 3) 1 LTA L J L{J L] 2'-0" Max. I I I I L J L J L J L J Varies* t I I {{I L}J L1J L J III II i Piers required at all inte- rior I rior column locations, per I Table 3. (See detail) LJ LJ LJ 4 I , I I i I I rTI 'II-� L{J L1, L J L1 II I I I Max. Pier spacing as selected from Table 2. I I I I I LIJ Lil L J L J m IJ L -v -J r+-i L-J r-h L_J IIIL *Dimensions vary. If pre -construction of footing is desired, contact the Skyline divi- sion that manufactured the unit for applicable dimensions. �rs161101 18A%i s`~t 4�I T' �G +r++ .GISTEI��,`Qj ,�G�,+�i * i Centerline Support pier i 8`30 location indicator -Metal s - STATE *.►�Si , strap or centerline joist �`.�.,�IAN4'- marked with paint beneath F I G. 5-3�1� "V/Q(�f�j, • home or label indicating Ifs«ll���ti pier location. 20 to moving the home to its final location. Preconstruction of the footings and piers to grade may be accomplished by referring to the pier location diagram, Figure 5-4, making special note of the additional piers required at centerline beam supports. If there are questions regarding pier locations, please contact the division for aid. Piers located at the centerline may carry much higher loads than other pier locations. PROPER BLOCKING OF THE CENTERLINE BEAM IS VITAL TO THE PERFORMANCE OF A DOUBLE -WIDE HOME. FIG. 5-4 RIM JOIST AT MARRIAGE LINE WHERE AVAILABLE PIERS DO NOT HAVE THE CAPACITY REQUIRED BY TABLE 3 FOR CONCENTRATED LOADS-2 OR MORE PIERS MAY BE USED. THE SUM FOOTINGS AND PIERS SHOWN OF PIER CAPACITIES AT EACH SUP- FOR ILLUSTRATIVE PURPOSES PORT POINT SHALL BE AT LEAST EQUAL ONLY —ANYAPPROVED SYS- TO THE LOADS SPECIFIED IN TABLE 3. TEM MAY BE USED. FIG. 5-5 UPLIFTED CON- NECTOR CAPACITY IS 1242# EACH TO BE RESISTED BY UPLIFT CONNECTOR CAPACITY IS MARRIAGE WALL ANCHORING 3114# EACH TO BE RESISTED BY EQUIPMENT ANCHORING EQUIPMENT. CABLE & THIMBLE SYSTEM SHOWN STANDARD i FOR ILLUSTRATION HURRICANE STRAP ONLY —ANY CAPACITY IS 3150# APPROVED METHOD PER STRAP MAY BE USED RIM JOIST . 1/4" CABLE THIMBLE INSERTED IN \ 1/4" CABLE o CONNECTOR CLAMPS STANDARD HURRICANE HOLE. STRAP IS TO BE CON - GALVANIZED STEEL SLOT IN STRAP IS FOR INSTALLA- NECTED DIRECTLY TO CABLE 7/32" DIA. TION OF STANDARD HURRICANE APPROVED ANCHOR. (7x7) OR 1/4" DIA. STRAP DESCRIBED ON PAGE STRAP IS ATTACHED TO (7x17) TENSION 25. CONNECT TIE -DOWN STRAP WALL IN FACTORY. CABLE PER DIRECTLY TO UP -LIFT CONNECTOR TIE -DOWN AS SHOWN BY FIG. 5-12. (SPLICE INSTRUCTIONS DEVICE NOT REQUIRED) TYPICAL MARRIAGE WALL STRAPS PADDLE FAN INSTALLATION FOR DOUBLE -WIDE HOMES WIRED FOR MOUNTING ON CENTER BEAM A. FLUSH RIDGE BEAM For proper ceiling fan installation, an electric outlet box and the decorative center beam to contain the box have been pro- vided for attachment to the ridge beam at the unit centerline. CAUTION: BEFORE FOLLOWING THE STEP-BY-STEP PROCEDURE, BE SURE THAT POWER TO FAN WIRE IS OFF. 1. Remove the fan manufacturer's installation instructions from the package and determine the method of fan attach- ment to the beam. (Also see Fig. 6-1 below.) 2. If the center beam (shipped loose) does not contain a precut hole for the electrical box, cut a hole with a hole saw approximately 1/4" larger than the box diameter at the proper location (center line of hole should line up with location of supply wire through ceiling) and centered in the width of the beam. 3. Install the box in the hole and secure flange (plastic box only) to the center beam with 4 - #6 x 1" screws. • CEILING BOARD f SUPPLY WIRE COILED &� - , SECURED FOR SHIPMENT NOTCH BEAM AT HOLE IF NECESSARY FOR WIRE CHASE SECURE BOX TO 2x6 CENTER BEAM WITH 4-#6x1" WOOD SCREWS (FIELD INSTALLED) 4. a. Insert the ceiling wire through a knock out hole in the side of the electrical box. NOTE: It may be necessary to cut a notch from the top on the supply wire side of the center beam hole to allow the supply wire to be inserted in electrical box without binding against center beam during installation. b. Leave approximately 4" of wire free in the box. 5. Secure the center beam in place over the center line joint. Be sure that the fan supply wire is not pinched or penetrated with beam fasteners. 6. Secure electrical box to ridge beam with #8 x 2 1/2" wood screws through the two holes in the top of the box. 7. Strip about 3/4" of insulation from the white and black conductor ends. 8. Position the noncombustible flash ring (provided) over the electrical box so that finished surface (adjacent to electrical box) which is to be covered by fan canopy is not exposed. 9. Follow the manufacturer's installation instructions for mounting the fan assembly to the box and for electrical wiring of the fan. Use provided electrical connectors for splicing wire. Be certain that the fan is grounded as speci- fied in manufacturer's instructions and that wires are connected properly (white to white and black to black). DOUBLE WIDE RIDGE BEAM I I I N I I FIELDCENSTALBLAT ON SHIPPED LOOSE FOR I i HOLE FOR BOX CUT THROUGH 2x6 (MAY BE I CUT IN PLANT OR IN FIELD) SECURE BOX TO RIDGE BEAM WITH 2-#8x2 1/2" WOOD SCREWS (FIELD INSTALLED) ELECTRICAL BOX (SEE NOTE 1) SUPPLY WIRE INSERTED IN FIELD NOTE: APPLICABLE TO U.L. LISTED PADDLE FAN WITH A THROUGH SIDE KNOCKOUT OF BOX SWIVEL TYPE MOUNTING BRACKET. FIG 6-1 45 CHAPTER 6 SET-UP PROCEDURES (Continued) INSTALLATION OF OPTIONAL FEATURES INSTALLATION OF "ADJUSTABLE OUTRIGGER" ELECTRIC DRYER VENTING GAS DRYER INSTALLATION _ Homes factory equipped with an electric dryer receptacle Homes factory equipped with a gas dryer will-also-have_the will also have t>�isture-lint exhaust system roughed -in. To moisture -lint exhaust duct and termination fitting provided. To Perimeterjoist 5-412x2" wood screws complete the moisture -lint exhaust system the following must complete a roughed -in system follow steps 1-5 under Electric Typical transverse be performed: Dryer Venting. Thrust Bracket floor joist Homes with "stubbed -in" gas service will also have the 1. Remove the covers over the vent hole in the floor. moisture -lint exhaust system roughed -in. However, the ex- 2. Push the duct through the hole provided in the floor and haust duct and termination fitting are not provided. Such connect to the dryer in accordance with the dryer termination fitting should be supplied with dryer at time of manufacturer's instructions. installation. The gas connection and completion of the mois- —NOTE:—Some-dryer-manufacturers-require that -metallic ture-lint exhaust system must�e by qualified personnel Pipe Main Unit I -Beam. Must be duct be connected to the dryer and routed through floors in accordance with the dryer manufacturer's installation instruc- g and/or sidewalls. tions. The gas connection must be tested (See Utility Hook-up + or - 10" deep or more. and Testing) prior to use of the appliance. To complete the 1/2" 3. Secure the termination fitting at the outside edge of the moisture -lint exhaust system, follow steps 1-5 under Electric _ Threaded Rod must floor: Dryer Venting. be seated in corner of NOTE: The termination fitting must be installed such that the dryer does not exhaust beneath the home. This may be accomplished by attaching the fitting to a piece of exterior grade plywood or, if the home is skirted, directly to the skirting. 4. Secure the flexible duct to the termination fitting with the provided clamp. (Do not use sheet metal screws or other devices which extend into the interior of the duct.) 5. Seal the duct penetration through the floor with a good grade of caulking. CAUTION: MATERIALS WHICH MAY BE PROVIDED FOR THE MOISTURE -LINT EXHAUST SYSTEM ARE NOT AC- CEPTABLE FOR INSTALLATION OF GAS DRYERS. GRILL/RANGE VENTING When a home is provided with a combination range (cook top)/grill that contains its own exhaust system, the exhaust must be routed such that it does not terminate beneath the home. To complete the exhaust system the following must be performed: 1. Remove the cover on the factory installed exhaust pipe protruding from beneath the floor in the vicinity of the range. ' 2. Secure the provided termination fitting at the outside edge of the floor. 3. Run the provided flexible metallic duct between the elbow' protruding from the floor and the termination fitting. Sup- port the duct and make the connections per the manufacturer's installation instructions provided with the grill/range. GAS WATER HEATER VENTING Homes factory equipped with certain types of gas water heaters may require special provisions to ensure proper ventilation. If the gas water heater installed in your home is not independently vented to the exterior of the home through a grilled opening in an exterior water heater door, then the following provisions must be followed. A. If the home is set on a crawlspace, or piers and skirting are used, then an air intake opening with a minimum free area of 32 square inches must be provided in the foundation wall or skirting. If the opening is covered by louvers or screen, the total free area must be 32 square inches. The air intake opening should be located as close as practical to the water heater location. B. If your home is set on a basement and a factory installed basement exterior venting system has not been provided, then the following steps must be taken: 1. Fabricate a plenum box to encompass the air inlet assembly without alteration to the air inlet assembly itself. This plenum must have a minimum horizontal dimension of eight (8) inches. The minimum clearance between the air inlet assembly and the inner wall of the plenum shall be two (2) inches. The vertical height of the plenum shall be as necessary to accommodate the air inlet assembly without alteration. The air inlet assembly is a round tube that is extended from the bottom of the water heater through the floor. 2. To ensure proper air entry into the fabricated plenum box, a 6 inch minimum round (or equivalent cross -sectional area) duct is required. The duct shall be of a smooth surface, rigid variety (no flex pipe) and shall be connected to the plenum in a manner that does not reduce the cross sectional area of the pipe. 3. The air inlet shall be of damperless type and provide a free area not less than the cross -sectional area of the duct. A screen, if used, shall be 1/4 x 1/4 inch minimum. 44 [-Beam web/flange. ADJUSTABLE OUTRIGGER Adjustment nut 3/4" threaded rod INSTALLATION INSTRUCTIONS 1. Locate the floor joist that requires support. 2. Mark I-beam directly under the floor joist to align "Adjustable Outrigger". 3. Adjust nut on threaded rod so it clears the frame flange for easy adjustment. 4. Set threaded rod in the pipe and against the frame. 5. Set thrust bracket on the floor joist and secure it with five #12 x 2" screws. If there is insulation installed between bottom board and floor joist, cut a small slit in the bottom board and insulation. Move the insulation away from the area where the thrust bracket is to be installed. Install bracket and repair bottom board with provided bottom board tape. 6. Adjust proper pressure by tightening the nut, until the perimeter joist is square and level. 7. If the "Adjustable Outrigger" is to be exposed to the weather after installation, or installed in highly corrosive environment, then it shall be painted with an exterior grade paint. NOTES: 1., The "Adjustable Outrigger" is intended as an alternate to perimeter piers at door and window openings. Page 6 of this manual requires perimeter piers at sidewall door and window openings that are 4 feet wide or wider. 2•. The "Adjustable Outrigger" is to be installed at the building site at time of setup. It may be factory supplied and shipped loose _ • or purchased separately by the dealer. The thrust bracket is listed by Preferred Construction Inspections (#1055-11). The threaded rod meets ASTM standard A307-1994 and the nut meets ANSI/ASME standard B18.2.2-1986. All necessary parts for the "Adjustable Outrigger" assembly are included in the package, and are purchased together. 3. The maximum load carrying capacity of the "Adjustable Outrigger" is 1400 lbs. See page 15, Table 3A for required pier loads at door and window openings. 4. These instructions are applicable ONLY to "The Adjustable Outrigger" manufactured by Manufactured Housing Foundations Systems Inc. (A subsidiary of Oliver Technologies, Inc.) 5. The "Adjustable Outrigger" is to be temporarily removed if the home is to be retransported, and then reinstalled after setup. 6. The "Adjustable Outrigger" is not available for use on 18' singlewides, 14' singlewides with 75.5" I -Beam spacing or 16' single- wides with 82.5" or 75.5" I -Beam spacing. 21 SET-UP PROCEDURES (Continued) SET-UP PROCEDURES (Continued) UTILITY INTERCONNECTION INSTALLATION OF EXTERIOR LIGHT FIXTURES FIG. 5-6 USE OF WATER LEVEL WATER LINE VALVE SUPPORT DEVICE MATERIAL TO MAKE LEVEL • Five Gallon Pail with Lid • Plastic Tubing —100 feet x 3/8" or 1/2" • Cork-1-1/2" • Male Barbed Fitting — 3/8" x 3/4" • Steel Washer — 7/8" • Nut — 3/4" • Female Barbed Fitting — 3/8" x 1/2" • Male Valve —1 /2" • Pipe Sealant • Food Coloring — 8 oz. "HOW TO USE A WATER LEVEL" j t PLACE AT ANY POINT AROUND HOME Unroll Tubing: Position level where it is to be used. Take care not to have kinks in it, step on it or lay anything on it. Check for Air Bubbles: To remove any lower valve below bottom of container and open. Close valve when they are out. Container Location: Located so valve can reach all areas of home. Build up container so water line in valve end of tubing is at the predetermined height support devices will be set. Leveling of Support Device: Secure valve above determined height and open. Adjust device as needed. Close valve and move to next support device. NOTE: Level all support devices before lowering home. HOLES IN ALT. WATER LINE CROSSOVER SIDE JOIST BRASS ADAPTERFLOOR I�i COPPER FLEX PIPE- DECKIt O O I BRASS ADAPTER J INSULATIONS NOTE: WRAP WATER LINE CONNECTOR WITH INSPECTION AND INSULATION IN ACCESS COVERS TO --FREEZING CLIMATES. PERMIT CONNECTION FIG. 5-30 WATER LINESION OF FLOOR r� ® ® MAKE WATER CROSSOVER �J WITH CONNECTORS PRO- VIDED WITH THE HOME FIG. 5-31 ALT. WATER LINE CROSSOVER Centerline Access Panels FIG. 5-31A Access Panel Frame Drainage Line Cross Connect Applicable only to models with plumbing on both halves. The connection may be made with field assembly of factory supplied parts (refer to drainage of 2 bath models, page 48), or when the below floor plumbing is factory installed, a flex- ible coupler is used as follows: Use only the approved flexible coupler provided (1-1/2 inch or 3 inch, as required). See Fig. 5-32. 1. Slip the flexible coupler over one end of the drainage line. 2. Align the pipes and center the coupler over the joint. 3. Tighten the clamps and check for leakage. DRAINAGE PIPE FIG. 5-32 APPROVED FLEXIBLE COUPLER METAL ROOF TIGHTENING Metal roofs may be tightened by the use of bonded washers secured to the roof truss with #8 x 1-1/4" screws, placed in rows of four across with width of the roof and spaced at approximate- ly 48" o.c. along the length of the roof. Care must be taken to assure that the screws are placed to penetrate the truss. After application, the screw heads and washers are to be sealed with a roof sealant material. ELECTRICAL CONNECTIONS SHOULD BE MADE ONLY BY QUALIFIED PERSONNEL. MAKE SURE POW- ER IS OFF BEFORE INSTALLING LIGHT. The correct procedure is as follows: 1. Install threaded tube in the strap secured to the fixture outlet box as shown in Fig. 5-33. 2. Apply caulking around base of light fixture to insure a water tight seal to side wall. (NOTE: On units with Masonite or vinyl siding, make certain the flashing ring is installed around outlet box.) 3. Connect wires, black to black, white to white, and ground to ground, using wire nuts. 4. Push wires into box and secure fixture in position using the nut provided on the threaded tube. Install the bulb. FACTORY INSTALLED NOTE: SOME LIGHTS WILL USE LIGHT BOX TWO BOLTS WHICH THREAD INTO THE MOUNTING STRAP IN LIEU OF THE THREADED ROD ILLUSTRATED + C+7 FIG. 5-33 THREADED ROD VENTILATION OF SKIRTING AND CRAWL SPACE ENCLOSURE Skirting or other crawl space enclosures, such as founda- tions, not only add to the appearance of the home but also provide important benefits in the reduction of heat loss. En- closures also aid in reducing the danger and inconvenience of damaged plumbing through freeze-up. Skyline Corporation recommends enclosing the underside of the home; however, it is very important that any enclosure be adequately ventilated. Ventilation openings need to be provided in the foundation or skirting along at least the two long walls of the home. The total area of ventilation openings should be at least 1 square foot for each 150 square feet of crawlspace area. An opening should be located within 3 ft. of each corner. PORCHES AND DECKS Some Skyline manufactured homes are constructed with factory -built porches or decks along the front, rear or main entry door side of the home. Porches and decks may be constructed with pressure treated wood floors which read- ily permit the passage of rain and/or snow through the floor. The area under porches or decks constructed with pressure treated decking lumber must be separated from the crawl space enclosure of the remainder of the home. Excessive moisture in the crawl space can be the cause of window or ceiling condensation and other problems associated with high moisture levels in the home. 22 43 SET-UP PROCEDURES (Continued) SET-UP PROCEDURES (Continued) UTILITY INTERCONNECTION 4. Connect the flexible ducts together per the provided_ manufacturer instructions using the splicing collar provided 5. Install a strap around duct and attach to the rim joists. 6. Tape bottom board closed with provided tape. The method of installation for the optional design with integral floor/frame or Perimeter frame is as follows: 1. Locate crossover locations as indicated by spray paint on rim joists and bottom board. --2. -Cut out-bottom-boa-rd--at-rim-joists for crossover connec= tions. 3. Cut the bottom board below floor for access to flexible ducts (See Fig. 5-29A). 4. Extend the flexible ducts through the cutouts in the rim joints from the half with the furnace to the other half. 5. Connect the flexible ducts together per the provided manufacturer instructions using the splicing collar provided. 6. Push the floor insulation against rim joist and tape bottom board closed with provided tape. INSULATION RIM JOIST FLEXIBLE FLOORDUCT DECKING -- -rr BOTTOM BOARD PLYWOOD L-1�i1 L LLl v� REINFORCING PLATE (TYP. EACH SIDE) STRAP SPLICING COLLAR OPTIONAL CROSSOVER DUCTS FOR STANDARD FRAME FLEXIBLE RIM JOIST SPLICING FLOOR DUCT COLLAR DECKING Nk))!! r! r r r r l! r r LSL OR LVL BEAM w/ INTEGRAL FLOOR FRAME STEEL I -BEAM BOTTOM w/PERIMETER FRAME BOARD 7 rACCESS I AREA (TYP.) OPTIONAL CROSSOVER DUCTS FOR INTEGRAL FLOOR/FRAME OR PERIMETER FRAME. FIG. 5-29A 42 Heating Crossover with V-Bonaet Some double -wide units will require a V-Bonnet duct connector to be installed prior to connection of the crossover ducts. The proper method of installation is as follows: 1. Remove axle if required for access to furnace area. 2. Fit tabs inside V-Bonnet and secure with #8x3/4" screws in holes provided on tabs (3 per side -12 total) (See Fig. 5- 29B). 3. Install flexible crossover ducts per the standard crossover cTuct design described on the previous page. Gasline Crossover Applicable only to models with gas appliances on both halves. The listed flexible connector supplied with the home must be used to make the connection. This connector will be located beneath the home. NOTE: DO NOT USE TOOLS TO CONNECT OR REMOVE FLEXIBLE CONNECTOR QUICK DISCONNECT. 1. Remove protective caps from the connector. 2. Connect the quick disconnect fitting. 3. Test for leaks with soapy water. Waterline Cross Connect. Applicable only to models with plumbing on both halves (See Fig. 5-30, 5-31, and 5-31A). ' 1. Remove the shipping caps from water lines and install provided connector. 2. Check for leaks. 3. In areas where exposed piping is subject to freezing, protect exposed piping with heat tapes listed for use on manufactured homes, and insulation. It is recommended that only U.L. listed heat tapes be used and installed in accordance with their listing. DOUBLE -WIDE INTERCONNECTION The -procedure -for -connecting -the -homes is-as-follows- 1. Remove the temporary closure materials (polyethylene and batten strips) and position the halves as close together as possible in the final desired location. Do not remove tempo- rary beam supports until step 7 has been completed. 2. Move the first section of home into its desired position. Block and level it in the same manner as described for a single section home. Skyline Corp. recommends, if possible the wavy half be blocked and beveled first as it is easier to lift and roll the light half and fit into place. 3. Install sill sealer insulating material (provided) around the ceiling (to the ridge beam at the ceiling panel line), endwalls and floor mating line. Fasten sill sealer with staples or nails. See figure 5-8A. 4. Slide the two halves together with rolling and jacking equipment. Care must be taken during rolling and jacking operations to avoid overstressing structural members. With the halves together at the floor, align the floors at the ends of the home. It is better to have a minor misalignment under the siding where it cannot be seen and will not cause a problem, than a small misalignment that will be observed in the interior cf the home. 5.. With the home aligned at the floor and supported by its foundation, join the floors using 3/8" x 3" (4-1/2" lags with double perimeter joist) lag screws 2 to 3 feet on center. A gap between halves up to 1" is allowable. Gaps larger than 1/2" must be filled with plywood or lumber shims. For 1/2" max gaps, increase fastener length 1 ". Use the procedures out- lined on page 16 to level the home and check supports and footings with tables 2 and 3. 6. To obtain access into the ceiling cavity to bolt or alter- nately lag screw the ridge beam sections together, fold back the underlayment paper and remove the 16" wide sheathing panel(s) at the peak. Note that the shingles may not have been -installed -on -one -or both halves,-at-the-16"-wide area at the peak. If one side is shingled, it is intended that the beams be lag screwed together. If neither side is shingled, the beam may be lag screwed or bolted together. Bolts to be 3/8" x 4- 1/2". Lag screws to be 3/8" x 5". Install lag screws or bolts at 24" o.c. with 6 additional lag screws at 3" o.c. over interior beam supports. (If marriage walls and ridge beam halves have been plated with 3/8" sheathing, then the bolts or lags must be increased in length by 3/4" to 5-3/4".) Predrill 1/4" pilot holes for the lag screws at 1-112" down -from -the top of -- the beam and with a maximum offset from the horizontal of 45 degrees. A gap between beam halves up to 1" is allowable. Gaps larger than 1/2" must be filled with plywood or lumber shims. For 1/2" max gaps, increase fastener length 1/2". For 1" max. gaps increase fastener length 1-1/4". See Fig. 5-7. 7. Prior to interconnecting the ridge beam halves, examine the ridge beam ends. Should there be a slight misalignment, it can be eliminated by placing a jack under the low side of main beam on one half and use the jack to raise the beam. The alignment can be held by properly bolting or lag screwing the beam halves together. See Fig. 5-8. 8. Place additional pier supports at the centerline at the interior column locations marked on the floor with indicator straps or paint (see Figure 5-3 and 5-4 and Table 3). Skyline Corp. provides pier location diagrams for all multiwide mod- els. These diagrams show the required locations of piers and are very useful in determining pier placement prior to taking receipt of home. Additional piers are required each side of exterior doors and sidewall openings greater than 4' in width. See Table 3A for these pier load requirements. 9. Toe -nail endwall centerline studs together using 16d nails 10" O.C. 10. If home has double mating walls, then fasten the mating wall columns together with #8 x 4" screws 16" o.c. Shim any gaps at columns with plywood or lumber and increase fasten- er length to achieve min. penetration. See Figure 5-7A. NOTE: (1) When beam support consists of a column instead of Centerline bearing wall, use 6 bolts/lags at 3" o.c. each side of column. (2) Beam marked with paint at column locations. 3" 3" If< 24° � 2�fE�f 2� Roof Ridge Beam I 1 1. - Endwall • I FIG. 5-7 APPROVED PFS Corporation Madison Wil - 07 03/14/05 HUD Manufactured Home Construction & Safety Standard Hall bearing wall 24" 24" #8X4" wood screws at 16" o.c. Either fastener location shown is ac- ceptable. If post is constructed from 2x4s or 2x6s use toe -screw locatio . (1-1/2" penetration required.) Mating line iE Interior support post FIG. 5-7A configurations (typ.) 23 SET-UP PROCEDURES (Continued) SET-UP PROCEDURES (Continued) DOUBLE -WIDE INTERCONNECTION (Continued) NOTE: IT IS IMPORTANT TO HAVE ROOF/CEILING SEC- TIONS FLUSH AT MATING LINE PRIOR TO FASTENING OF RIDGE BEAM HALVES. IF THEYARE NOT FLUSH, THEN THE LOW SIDE SHOULD BE RAISED BY JACKING WITH A WOOD POST OR STEEL PIPE WITH A WOOD OR METAL PAD AT THE CEILING. PLACE THE BASE OF THE JACK ACROSS THE FLOOR -MATING LINE SO -THAT IT RESTS ON BOTH HALVES. JACK AGAINST CEILING ONLY -IN AREAS WHERE THERE IS NO MARRIAGE WALL. FIG. 5-8 FIG. 5-8A Pad on ceiling section to be raised. Es Base over both floors at mating lines--► Ridge beam Install sill sealer (provided) at endwalls, floor mating line and ridge beam bottom flange. Matinn lino rim inict ATTACHMENT OF GYPSUM PANELS AT DOUBLE -WIDE CENTERLINE Some multiple -wide units will have a gypsum panel left off at the centerline for field attachment. Fasten the factory sup- plied gypsum wallboard panel(s) at the center of the endwalls after the units have been attached. Fasten the panel(s) to the wall framing as described in figure 5-813 below. Blocking if required, will be factory provided. \ Fasten 5/16" gypsum panels to framing with 3/16"x1" sta- ples or 1" washer head screws 6" o.c. around perimeter & 12" o.c. in the field. Fasten 1/2" gypsum w/1-5/8" x 0.099" gypsum nails 8" o.c. or 1-1/4" type 'w' drywall screws 12" o.c. If gypsum is overlaying 3.6mm lauan, then increase fastener lengths 1/4". Gypsum may be glued to framing (optional) in combination with w/mechanical fastening above. Use an approved glue. Centerline of Unit Gypsum Wallboard , Panels 4' for field installed gyp. Panel. INTERIOR VIEW FIG. 5-8B Center gypsum panel is field in- stalled. All required gypsum panels, fasteners and adhesives are supplied by the factory. UTILITY INTERCONNECTION In Floor Cable Splice The correct procedure is as follows: 1. Remove bottom board access covers (See Fig. 5-28C). 2. Feed cable through hole or notch in joists. 3. Connect cable splice together. 4. Replace access covers with provided bottom board tape. Cable Splice Hole or notch in joists FIG. 5-28C 20 Amp Non - Exterior Metallic cable Exterior ac- splice -Type cess panel on studs NM -(])or both halves. cable splice Fasten with manufactured wood screws by moiex-etc. to wall studs. (part no. 19045). Factory installed wire During transit free protectors over notches ends of cable are in studs Marriage Line for coiled and secured Double wide in the wall cavity. FIG. 5-28D NOTE: Some models n axle or axles be the crossover duct or connect the home air distribution system to the heating - cooling appliance. SUPPORT % NOTE: If unit has multiple cable splices the circuits will be identified by the attached code markers. Endwall Cable Splice The correct procedure is as follows: 1. Remove access panels on exterior side of endwall (See Fig. 5-28D). 2. Uncoil wire located inside endwall. 3. Connect cable splice halves together. 4. Reinstall access panels. Note: If unit has multiple cable splices the circuits will be identified by the attached code markers. Heating Crossover There are two basic hookup procedures for all designs. The first procedure is the standard design and is a single 12" diameter flexible duct. The second procedure is an optional design that includes a varying number of 5" or 6" crossover ducts that are installed in the floor. The method of installation for the standard design is as follows: 1. Connect each end of the provided insulated 12" diameter flexible duct to the metal duct connector on each half of the home by sliding duct over metal tabs on duct connector. 2. After mechanical connections are made, tape each connection with 2-inch wide duct tape to ensure an airtight seal. 3. Permanently secure the crossover duct with straps as shown in Fig. 5-29. Do not allow duct to rest on the ground. Maintain at least a 4-inch clearance between duct and the ground. The method of installation for optional design with standard frame is as follows: 1. Remove access panels at crossover ducts. The access panels are located below the floor. 2. Cross cut bottom board at 8" holes in reinforcing plates. 3. Extend the flexible ducts from each half through the access holes (See Fig. 5-29A). DUCT NOTE: 5 STRAPS AS SHOWN TO FLOOR JOISTS. FIG. 5-29 MINIMUM CLEARANCE TO GROUND TO BE 4". 24 41 SET-UP PROCEDURES (Continued) SET-UP PROCEDURES (Continued) DOUBLE -WIDE UTILITY INTERCONNECTION ELECTRICAL INTERCONNECTION OF DOUBLE-WIDES -Bonding Chassis halves floor joist construction are to be bonded to- gether with the provided bonding wire and lugs (See page 54). Electrical Crossover NOTE: ALL ON -SITE ELECTRICAL WORK MUST BE PERFORMED BY QUALIFIED PERSONNEL. BEFORE CONNECTING ELECTRICAL CROSSOVER ASSURE THAT POWER._HAS-NOYE-T_-BEEN-CONNECTED. - Endwall Crossover The procedure for this interconnection is as follows: 1. Feed wires from side B through metallic wire protectors into junction box or Sub -Panel in side A (See Fig. 5-27). 2. Staple wires within 8 inches of junction box or Sub -Panel to side of stud at centerline of stud. 3. Remove cover from junction box inside home; cut wires to length allowing a minimum of 4 inches of free wire extend- ing from box. 4. Strip approximately 1 inch of wire and connect like circuit numbers (white to white, black to black, ground to ground, red to red on multi -circuits and 240V circuits) with the provided wire nuts. 5. Push wires into box and replace cover. NOTE: SOME MODELS MAY HAVE ELECTRICAL CROSSOVERS AT FRONT AND REAR. Endwall Access to junction Endwall Acce Side A box - inside home E Side B Factory installed wire protectors I FIG. 5-27 I IVIU II IJLCAIIVU VVI IUUIL U VVI IUUVLVI0 (materials provided) FIG. 5-28 40 1 NM or SE cable Plywood or U613 access cover FIG. 5-28A access cover FIG. 5-28B Below Floor Crossover The correct procedure is as follows: 1. Remove the pull box covers and install the provided conduit and conductors between the boxes (See Fig. 5-28) 2. Using the provided wire connectors, connect like circuit numbers (white to white, black to black, ground to ground, red to red on multi -circuits and 240V circuits). 3. Push wires into boxes and replace covers. Below Floor Crossovers In Floor Pull Box The correct procedure is as follows: 1. Remove plywood access covers and cut bottom board for access to wires (See Fig. 5-28A). 2. Feed wires around bottom of marriage line floor joists and into junction box. 3. Cut wires to length allowing a minimum of 4" free wire extending into box. 4. Strip approximately 1 inch of wire and connect like circuit numbers (white to white, black to black, ground to ground red to red on multi -circuits and 240V circuits). 5. Replace access covers and tape bottom board with pro- vided tape. In Floor Pull Box The correct procedure is as follows: 1. Remove plywood access cover to pull box and cut bottom board on opposite half for access to wires (See Fig. 5-28B) 2. Feed wires through hole or notch in joists into junction box. 3. Attach wires as described in steps 3 and 4 for endwall crossover. 4. Replace access cover and tape bottom board with pro- vided tape. MANUFACTURED HOME TIE -DOWN INSTRUCTIONS The support system must also resist lifting, sliding, and over- turning forces resulting from side winds. A method used is to install ground anchors and tie -down straps in addition to the piers. Tie -downs as described are the minimum necessary if the home is to withstand its design loads without dislocation. On multi -section homes, sections must be fastened together -and -level -before tie -down straps are installed. WARNING BEFORE GROUND ANCHOR INSTALLATION, DETERMINE THAT THE ANCHOR LOCATIONS AROUND THE HOME WILL NOT BE CLOSE TO ANY UNDERGROUND ELECTRI- CAL CABLES, WATER LINES OR SEWER PIPING. FAIL- URE TO DETERMINE THE LOCATION OF UNDERGROUND ELECTRICAL CABLES MAY RESULT IN SERIOUS PER- SONAL INJURY OR DEATH. NOTE: IN THE FRAME TIE -DOWN SYSTEM, IT IS IMPOR- TANT TO USE MATERIALS OF PROPER DESIGN AND OF ADEQUATE QUALITY. THE MATERIAL SPECIFICATIONS CONTAINED HEREIN SHOULD BE CONSIDERED AS MINIMUM REQUIREMENTS. . Materials not furnished with the home which will be neces- sary to complete the tie -down system must meet the require- ments set forth below. Such materials would include: 1. Cable or steel strap with a breaking strength of at least 4,725 pounds e.g. galvanized aircraft cable at least 1/4" diam- eter or Type 1, Finish B, Grade 1 steel strapping 1-1/4" wide and 0.03" thick, conforming with ASTM D3953-91. 2. Galvanized connection devices such as turnbuckles, eyebolts, strap buckles, and cable clamps should be rated at 3,150 working load minimum. 3. Ground anchors - capable of withstanding at least a 4,725 pound pull. Anchors must be installed as specified by the anchor manufacturer. Stabilizers or concrete collars may be required by anchor manufacturer. THE HOME MUST BE IN ITS FINAL LEVEL POSITION PRIOR TO TYING IT DOWN. The procedure for tying down the manufactured home is as _ follows: 1. Position and install the ground anchors under exterior walls so that the final strap angle and height (H) will be within the limits shown in tables 5 thru 6C. 2. Connect the straps to the frame and ground anchors (See Figs. 5-9 and 5-10). Straps wrapped around the I -Beam as shown in Fig. 5-9 require protection from premature failure due to sharp corners. Fig. 5-9A illustrates one method to protect against sharp corner damage. Other methods (such as beam clamps - Tie -Down Engineering part no. 59003 or equivalent) approved by the local building authority having jurisdiction may be used. 3. Tighten thestrapsusing the tensioning device _provided - with the ground anchors. Use caution to avoid overtension- ing the straps which might pull the home off the piers. It is recommended that all straps be tightened only enough to re- move slack. Then, after all straps are installed and the slack removed, tension the straps. 4. The strap tension should be rechecked at frequent inter- vals until all pier settlement has stopped. CAUTION: DURING THE RELEVELING PROCESS, DO NOT JACK THE HOME AGAINST TIGHT STRAPS. Protect sharp corners with 26Ga. (0.019" min.) x 2" galvanized steel strapping material formed to fit around beam flanges. Sharp corner protection at top and bottom of beam if strap is wrapped around beam. Unit kBeam FIG. 5-9A 25 SET-UP PROCEDURES (Continued) SET-UP PROCEDURES (Continued) MANUFACTURED HOME TIE -DOWN INSTRUCTIONS (Continued) OPTIONAL OVER -THE -ROOF STRAP PROCEDURE If over -the -roof straps are provided (optional on all homes) they may be connected to ground anchors as specified in the following procedure in order to achieve additional stability in extreme winds. Note that the frame tie -down procedure on page 25 is still mandatory — STEP 1 STRAP BUCKLE NOT PROVIDED PULL TIGHT DOWN TO ANCHOR SItF ' Strap to frame tie -down procedure Note: Beam attachment device may be run to top or bottom of (- Beam if device is approved in that manner. 1 1/4" --MIN. MINUTEMAN STRAP DEVICE OR EQUIVALENT APPROVED ANCHOR FIG. 5-9 FIG. 5-10 Materials not furnished with the home which will be neces- sary to properly connect the over -the -roof straps are: 1. Ground anchors capable of withstanding at least 4,750 pound pull when installed in the soil at the site. 2. Strap end connection devices (See Fig. 5-10). THE HOME MUST BE -IN -ITS -FINAL LEVEL POSITION -WITH FRAME TIES INSTALLED BEFORE CONNECTING THE OVER -THE -ROOF STRAPS. The procedure for over -the -roof strap installation is as follows: 1. Position and install the ground anchors so that the strap will be vertical after attachment to the anchor. The anchor may be installed slightly beneath the home to avoid interference with skirting (See Fig. 5-11). 2. Insert the minuteman connector yoke through the eye in the anchor and insert slotted bolt through the yoke. 3. Place end of strap through slotted bolt and remove slack by turning bolt. DO NOT TENSION UNTIL BOTH ENDS OF _ STRAP ARE CONNECTED. 4. Tension and lock minuteman connector in position; consult instructions furnished with connectors. 5. Check strap tension (See step 4 under frame tie -down procedure). 6. For double -wide homes see Fig. 5-12 for the splice connection at the centerline. OPTIONAL UNDER -SKIN STEEL STRAP (FACTORY INSTALLED) R FIG.5-11 STRAPS TO BE INSTALLED VERTICALLY ANCHOR 1. Insert end of the strap through the slat on the splice device, allowing 15" of strap to extend through the device. DOUBLEWIDE OPTIONAL 2. Make a 180 degree bend in the strap and slide a strap seal over OVER -THE -ROOF STRAPS STEP t the double thickness of strap, positioning the strap seal as close to the splice device as possible. Compress the strap seal on the strap with a pair of vise grip pliers or hammer, or crimp strap seal with an A-B ® STRAP SEAL Chance crimping tool. (Make all bends in the strap as sharp as pos- sible by crimping with vise grip or larger pliers). ®SPLICE DEVICE O STEP 2 3. Bend strap back over the seal and insert back through the slot on the splice device. Flatten bend with vise grip pliers or hammer. 4. Repeat steps 1 through 3 with the mating strap. Draw the com- pleted assembly down to the ridge beam by tensioning the strap in the STEP 3 ground anchor. FIG. 5-12 DOUBLE -WIDE SHINGLED ROOF FASTENERS: Use 1" crown x 1" leg 16 GA. galvanized staples or 1 1/4" 12 GA. galvanized roofing nails with 3/8" diameter heads 36" Shingle x x x x 12" WIND ZONE I WIND ZONE II & III Nail 1" from each end 5 5/8" above exposed butt & 5/8" above each cut out FIG. 5-23 Nail or staple ridge shingles as indicated. See fig. 5-23 for fastener sizes. 1" 5" Exposure Ridge line FIG. 5-25 12" CUT SHINGLE INTO 3 PIECES AS SHOWN BY DOTTED LINE I I 1 2 3 FIG. 5-24 FIG. 5-26 26 39 SET-UP PROCEDURES (Continued) TABLE 5 STRAP ANGLE TABLE'FOR STANDARD HEIGHT PIERS - WIND ZONE 1 SHINGLE ROOF CLOSURE -INSTALL-A-T-ION-OF-SHtNGL-ED-ROOF . Ifhome i-s-fo-be set in a Wind Zone II or III area, then apply 1. Fold back underlayment paper. a 6" wide strip of asphalt cement to the roof decking on both 2. Remove the 16 inch wide sheathing at the ridge beam of halves of home, directly adjacent to the roof peak. one or both halves which was temporarily secured to the 6. Tack roof underlayment paper back in place. roof at the factory. 7. Staple additional underlayment strip down, centered at 3. Bolt the,ridge beam together as outlined on page 23. For ridge. models with heat ducts in the roof cavity make the intercon- 8. Fasten drip cap to sheathing at roof edge (above felt). nection of two units by running the provided flexible duct 9. Complete installation of shingles (See Fig. 5-22). _ - thro.ugh_the-access_hole-in-the-ridge-beam-After-the-me- - 10.-Cut-shingles-for-ridge-cap-and-install as -shown -in -Figures- chanical connection is made, tape the joint with 2 inch wide 5-24 and 5-25. duct tape. 4. See Fig 5-21. Reinstall the 3/8" x 16" wide sheathing by first NOTE: TO PREVENT WIND LIFTING AND POSSIBLE reinstalling the factory provided sheathing panel clips (2 per LEAKAGE, THE RIDGE CAP SHINGLES SHOULD BE bay), then fasten using 15 gauge x 7/16" x 1-1/2" staples or ORIENTED WITH RESPECT TO PREVAILING WINDS AS 8d twist nails 4 inches on center at butt joints and at each INDICATED IN FIG. 5-25. truss between joints. Special fastening may be required at trusses located over shearwalls. These trusses will be 11.. Install closure cap at eave joint (See Fig. 5-26). marked with a paint spot on the truss top chord. Fasten 12. See supplement for ridge vent if applicable. roof sheathing to these trusses with fasteners spaced 2" o.c. (Y o.c. - if truss is doubled - to both trusses). 38 Field installed sheathing 16" Site installed 4 shingles Ridge Shingles 9 ( � Underlayment paper or 5 courses) Underlayment strip (� `• Sheathing 18" shingle 24" shingle - _ 24" shingle 30" shingle ` 36" shingle See Fig. 5-23 for fas- Underlayment ` folded tening requirement paper back for beam bolting. Ridge beam Drip cap If the roofing In the area of the front rake has been covered to protect from wind damage during transit, the protective covering and fasteners are to be carefully removed. Seal the fastener holes with asphalt roofing cement. FIG. 5-21 FIG. 5-22 OPTIONAL CENTERLINE METAL FLASHING AND SHINGLE INSTALLATION. 10" strip of underlayment paper installed over metal flashing and below shingles. Shingle ridge cap - install per figures 5-23 Install shingles (each thru 5-25 section) to centerline. 8"x32Ga. (min.) or .019" (min.) alumi- num metal roll flashing. Fasten with 1"xl" - 1/4"xl6Ga. Galvanized staples or roofing nails at 16" o.c. both sides. FIG. 5-22A SINGLE-WIDES ' ANCHORS/STRAPS 12' O.C. ANCHORS/STRAPS 14' O.C. MIN STRAP ANGLE 18 DEGREES 22 DEGREES MAX. STRAP AN_GLF 47-DEGREES -37-DEGREE DOUBLE-WIDES ANCHORS/STRAPS 12' O.C. ANCHORS/STRAPS 14' O.C. MIN STRAP ANGLE 8 Degrees, 10.5 Degrees for 32' Wides 8 Degrees, 12.5 Degrees for 32' Wides MAX. STRAP ANGLE 43 Degrees, 54.5 Degrees for 32' Wides 33 Degrees, 47 Degrees for 32' Wides DOUBLE-WIDES WITH 5/12 ROOF PITCH ANCHORS/STRAPS 8' O.C. NA __MIN S_T-RARANGLE - -_ _ _ _ _ _7_8-Degreesr9.2_Degrees-for-24-Wides,-4.-9-Degrees-for- 32' Wides-- - - - - - - - - - - - - - MAX. STRAP ANGLE 40.3 Degrees, 43.0 Degrees for 24' Wides, 37.3 Degrees for 32' Wides - DOUBLE-WIDES WITH 7/12 ROOF PITCH ANCHORS/STRAPS 6' O.C. NA MIN STRAP ANGLE 21.7 Degrees, 8.4 Degrees for 32' Wides - MAX. STRAP ANGLE 48.3 Degrees, 44.7 Degrees for 32' Wides - MINJMAX. PIER HEIGHTS FOR STANDARD HEIGHT PIERS - WIND ZONE I SINGLE-WIDES MAIN I -BEAM SPACING (in) ANCHORS/STRAPS 12' O.C. ANCHORS/STRAPS 14' O.C. 82 99.5 75.5 82 99.5 12 ft WIDES H MIN (in 12 36 14 48 16 60 - - 12 32 12 44 13 56 - - 12 23 12 35 12 47 12 58 13 25 17 34 19 42 - - 12 34 13 31 15 40 - - 12 16 12 25 12 33 - - H MAX in 14 ft ' WIDES H MIN in H MAX (in) 16 ft k WIDES H MIN (in) In 18 ft WIDES In H MAX (in) DOUBLE-WIDES WIND ZONE I MAIN [-BEAM SPACING (in) ANCHORS/STRAPS 12' O.C. ANCHORS/STRAPS 14' O.C. 75.5 82 99.5 75.5 82 99.5 20 ft WIDES H MIN (in 12 23 12 36 12 42 12 48 - - - - 12 32 12 39 12 45 - - 12 23 12 30 12 35 12 35 12 14 12 22 12 25 12 29 - - - - 12 19 12 23 12 27 - - - - 12 14 12 18 12 21 12 43 H MAX in 24 ft WIDES H MIN in H MAX (in) 26 ft WIDES H MIN in In 28 ft WIDES H MIN in H MAX (in) 28 ft WIDES H MIN in H MAX in DOUBLE-WIDES WITH 5/12 ROOF PITCH MAIN I -BEAM SPACING (in) ANCHORS/STRAPS 8' O.C. NA 75.5 82 99.5 75.5 82 99.5 24 ft WIDES H MIN in 12 12 - 28 25 - - - 12 - - 27.5 - - 12 - - 30.5 - - - - - - - - - - - - - - - - - - H MAX in 28 ft WIDES H MIN (in) H MAX in 32 ft WIDES H MIN in H MAX in DOUBLE-WIDES WITH 7/12 ROOF PITCH MAIN ]-BEAM SPACING (in) ANCHORS/STRAPS 6' O.C. NA 75.5 82 99.5 75.5 82 99.5 28 ft • WIDES H MIN (in) - - 12 - - 34 - - - - - - H MAX in 32 ````1 WI P '��� MIN in - - 12 - - 35 - - - - - - .'ftL in Pioasro52 See Table 5 & 5A for spacing 6" typ. Buckle -See Fig. 5-9 •'• Strap - See page •o STATE OF a I I~ 25 for specs. %�O.e'•.�VOIAXAV- ♦ :� 1" min. Bunn„ua I -Beam Main Fram I H A Strap Angle♦ < v q Stra Anchor - - Anchor rated and installed per - - -- Q 4 ANCHOR TIE DOWN DETAIL FIG. 5-13 Anchor manufacturer's instructions SECTION A -A 27 SET-UP PROCEDURES (Continued) TABLE 5A STRAP ANGLE TABLE FOR HIGHER THAN STANDARD PIERS SINGLE-WIDES WIND ZONE I WIND ZONE I ANCHORS/STRAPS 8' O.C. ANCHORS/STRAPS 6' O.C. MIN. STRAP ANGLE 18 DEGREES _ MAX. STRAP ANGLE 63 DEGREES - DOUBLE-WIDES ANCHORS/STRAPS 8' O.C. ANCHORS/STRAPS 6' O.C. MIN. STRAP ANGLE 6 Degrees, 7 Degrees for 32' Wides 4 Degrees, 5.5 Degrees for 32' Wides MAX. STRAP ANGLE 63 Degrees, 67 Degrees for 32' Wides 70 Degrees, 73 Degrees for 32' Wides MIN./MAX. PIER HEIGHTS FOR HIGHER THAN STANDARD PIERS SINGLE-WIDES WIND ZONE I MAIN I -BEAM SPACING (in) ANCHORS/STRAPS 8' O.C. ANCHORS/STRAPS 6' O.C. 75.5 82 99.5 75.5 82 99.5 12 ft WIDES H MIN (in) 12 12 12 66 59 42 14 13 12 72 72 64 18 17 14 72 72 72 - - 18 - - 72 - - - - - - - - - - - - - - - - - - - - - - - - H MAX in 14 ft WIDES H MIN in H MAX (in) 16 ft WIDES H MIN (in) In 18 ft WIDES In H MAX(in) DOUBLE-WIDES MAIN I -BEAM SPACING (in) ANCHORS/STRAPS 8' O.C. ANCHORS/STRAPS 6' O.C. 75.5 82 99.5 75.5 82 99. 20 ft WIDES H MIN in) 12 42 12 67 12 72 12 72 - - - - 12 60 12 72 12 72 - - 12 43 12 55 12 65 12 72 12 60 12 72 12 72 12 72 - - - - 12 72 12 72 12 72 - - - - 12 60 ^ 12 72 12 72 12 72 H MAX in 24 ft WIDES H MIN in H MAX (in) 26 ft WIDES H MIN (in) In 28 ft WIDES In H MAX (in) 32 ft WIDES H MIN (in) H MAX in See Table 5 & 5A for spacing 6" typ. I 14- I-Beam A q Strap Anchor ANCHOR TIE DOWN DETAIL FIG. 5-14 •45J Buckle - See Fig. 5-9 Main Strap Angle 1" min. ----------------- Anchor rated and installed per 01 Anchor manufacturer's instructions SECTION A -A Strap - See page 25 for specs. DOUBLE -WIDE EXTERIOR CLOSURE JAMES HARDIE "HARDIPLANK" OR "HARDIPANEL" SIDING "Hardiplank" and "Hardipanel" are fiber -cement siding panels. "Hardiplank" is a lap style siding, and "Hardipanel" is a panel type siding. Fasten the siding panels to framing members with 6d galvanized nails (2" long min.-2-1/4" with "Hardiplank" at Wind Zones II and III) per the details shown in Figure -5=20-below. "Hardiplank" siding -requires 2 additional fasteners evenly spaced between studs into sheathing at Wind Zone II and III only. "Hardiplank" siding is not allowed within 3 feet of a sidewall/endwall corner at Wind Zone III. Finish siding by painting with an exterior grade, semi -gloss acrylic or latex paint. All ripped edges of panels should be painted to match. Fiaure A Fiaure B Hardiplank Rim Joist or �� Exterior Hardiplank Siding wall Siding bottom plate 1 /4" to 1 /2" 1 Fasten with 6d 1"x2" Wood Stops nails 12" to 16" Starter DeLailj o.c. I Outside Corner Figure C Figure D Hardiplank Lap joints must fall Siding at stud. Stagger Hardiplank joints at least 2 stud Siding Fasten with 6d nails bays. 48" min. be- r- --_ 12" to 16" o.c. tween joints at same - course. 2 Stud bays 1 3/4" to 1" required from wall 1 "x1" Wood Stop corner to 1 st joint. 3/8" to 1 /2" Inside Corner I Lap Joint 6d nail required at each stud location (16" o.c.). 2 Figure E additional nails required at Wind Zones II and III. Figure F Hardiplank P These fasteners shall be evenly spaced between studs into a 3/8" (min.) structural sheathing. Siding µ's3's's Window frame Flash, shim, gap 1-1/4 in. 1-1/47min. overla s•s> overla <'�'�^� t�^< 3/16" and caulk. �$». `^.%A�T'Ctf%p:. is �: $S:�•MC} $;'!C: This fastening style is required HardiPlank Nailing at Wind Zones Window Detail II & III Figure G 2" min. from corners NOTE: 6d nail 6" o.c. at edges ........ & 2" o.c. in field at Wind Double studs are required within 3 feet of a sidewall/endwall Zone I. 6d nails 5" o.c. at - corner at Wind Zones II and III. Fasten HardiPanel siding edges Zones es II & Ill field at Coveumber with lumber panels to both studs at double stud locations. • battens or Hardiplank • : • • caulk. •3/8" Siding min. 3/8" min. HardiPanel Application FIG. 5-20 28 37 SET-UP PROCEDURES (Continued) TIE -DOWN DETAILS FOR EXTRA TALL PIERS (UP TO 88") WIND ZONE I ONLY DOUBLE -WIDE EXTERIOR CLOSURE The siding panels should be attached using galvanized steel or aluminum 16 ga. 1/2 by 1-1/2" staples. (6d galvanized nails may also be used). Staples should be driven so that there is a 1/32" clearance between the siding and staple crown to allow some lateral movement. Fasten every 16" at the stud location. See Figure 5-19 Detail A for proper fastening. Snap the bottom course of siding into the starter strip and -fasten to -the -wall —Leave -a 114" space -at -comer -posts -and — 'J' channels around window and door openings to allow for expansion. Do not fasten within 4" of an accessory. Verti- cal butt joints in panels should overlap 1 ". Do not fasten the panel within 4" of the joint. Install vinyl, aluminum, felt or other suitable material for flashing at bottom corners of doors and windows per Figure 5-19 Detail E. Apply caulk around siding and light blocks, water faucets, or other small penetrations. Install successive courses similarly to the first. Butt joints in adjacent courses should be offset approximately 24" for best appearance. Joints in alternate courses should be aligned vertically (See Figure 5-19 Detail B). Panels will have to be cut at headers and sills. Asingle panel should extend without joints across the width of the opening. When cutting a panel at a sill, measure the distance between the bottom of the opening and the top lock of the lower course, then deduct 1/4" (See Fig. 5-19 Detail C). Slide the cut panel into the under sill trim and install. Note that the under sill trim piece may have to be furred to maintain the proper pitch of the siding. Measure and cut the header panel in the same manner as indicated above. The top sections at the gable will need to be angle cut. Use two scrap pieces of siding to make a pattern (See Fig. 5-19 Detail D). Interlock one piece with the siding panel below. Hold the other piece on top against the gable. Mark a line on the bottom piece and cut. Use this piece as a pattern for cutting gable pieces. Install the gable pieces by interlocking with the lower course, sliding into the gable 'J' rail and fastening. If a home has been provided with "Craneboard" solid core vinyl siding, then read and follow the special instructions provided with this manual. Incorrectly Correctly Incorrectly Appl1ied Applied Applied ih DETAIL A 36 FIG. 5-19 DETAIL B DETAIL C Mark Angle 2 Scrap Pieces for Cut ' of Siding _ _ Pattern for Angle DETAIL D • J-Trim / 0 0+ Diverter 1/2" Min. J-Trim f� All Purpose Trim DETAIL E • TABLE 513 H TYPICAL 51NGLE-WIDE 99.5", except 24' wides may be 99.5", 82" or 75.5" 1 TYPICAL DOUBLE -WIDE '��grrrr T. * ' 19600' r 3 -Jr.; i 9 ' STATE '0�'��DIA' .�:; /0NAr Straps and anchors to be installed 12'-0" o.c. maximum. 8'-0" o.c. maximum for units with 5/12 roof pitch A NOMINAL UNIT WIDTH Singlewides Doublewides Doublewides with5/12 Roof Pitch 14' 16, 24' 28' 32' 28' 32' Strap Angle, A (degrees) Min. 8 8 9.1 12.1 15.7 13.7 7.5 Max. 69.9 63.9 39.9 34.6 32.2 34.6 32.2 Pier Height, H (degrees) Min. 12 12 18 28 40 29 19 Max. 88 88 88 88 1 88 88 88 Notes: 1) Straps and anchors to be rated for 3150 lbs. of working stress min. 2) See page 25 for strap material specification, connection to I -Beam and all other setup information. 3) See page 12 for required pier construction. 29 STANDARD TIE -DOWN DETAILS SET-UP PROCEDURES (Continued) T. '�: Q�sTe),�:.G��•. No. * I9600312 03 P.-I -o STATE OF °e Z Z 0 O OQ J� m J F w w y M Z O Z Q � W N W Z 0 a W W TABLE 6 SEE NOTE #1 STRAPANGLE STRAP ANCHOR TO BE RATED FOR 3684# OF WORKING STRESS, TOTAL FOR BOTH STRAPS. (INSTALLED PER ANCHOR MANUFACTURER'S INSTRUCTIONS SEE NOTE 3) SINGLE -WIDE 1 rT-t -4 -4 STRAPANGLE F==9 F Mq r- r-i I- T l­-1-4 1 STRAP INSTALL STRAP & ANCHORS 6'-8' @ ZONE II 5'-4" @ ZONE III & 4'-0"@ ZONE II&Ill FOR SHED ROOF - SINGLEWIDES SEE TABLE FOR ELEVATION & STRAP ANGLE LIMITATIONS ANCHOR TO BE RATED FOR 3684# OF WORKING STRESS, TOTAL FOR BOTH• -- STRAPS. (INSTALLED PER ANCHOR MANUFACTURER'S INSTRUCTIONS SEE NOTE 3) DOUBLE -WIDE USE 24' WIDE RESULTS FOR 12' HALF OF 22' WIDE DOUBLE WIDES NOTE #1 WIDTH WIND ZONE II WIND ZONE III MIN. & MAX. ELEVATION MIN. & MAX. DIAGONAL STRAP ANGLE MIN. & MAX. ELEVATION MIN. & MAX. DIAGONAL STRAP ANGLE 12' 14" TO 25" 25° TO 40° 14" TO 26" 25° TO 41 ° 14' 12" TO 27" 20.5° TO 40° 20.5° TO 41' 12' SHED ROOF 25.2" TO 34.6" 41' TO 50° 25.2" TO 34.6" 41' TO 50° 14' SHED ROOF 23.4" TO 38.4" 36° TO 50° 23.4" TO 38.4" 36° TO 50° 16' 16" TO 36" 20.5° TO 40° 15.5" TO 38" 19.5° TO 41 ° 18, 20" TO 44" 20.5° TO 40° 19" TO 47" 19.5° TO 41' 20' OR 22' * 12" TO 15" 34° TO 40° 12" TO 16" 34° TO 42° 24' 12" TO 22" 24.5° TO 40° 12" TO 23.5" 24.5° TO 42° 28' 1 12" TO 23.5" 23'TO 40° 12" TO 25.5" 23° TO 42° 32' 12" TO 33" 1 167TO 39.3° 12" TO 36" 16.6° TO 41.8° 16' SHED ROOF 21" TO 27.5" 1 25.9° TO 32.4° 21" TO 27.5" 25.9° TO 32.4° NOTES: 1) FOR STRAP MATERIAL SPECIFICATION, CONNECTION TO FRAME I -BEAM & OTHER SETUP INFORMATION, REFER TO SKYLINE INSTALLATION MANUAL 2) FOR ANCHORING SYSTEMS, THE INSTRUCTIONS SHALL INDICATE: A) THE MINIMUM ANCHOR CAPACITY REQUIRED; B) ANCHORS SHOULD BE CERTIFIED BY PROFESSIONAL ENGINEER, ARCHITECT, OR A NATIONALLY RECOGNIZED TESTING LABORATORY AS TO THEIR RESISTANCE, BASED ON THE MAXIMUM ANGLE OF DIAGONAL TIE AND/OR VERTICAL TIE LOADING AND ANGLE OF ANCHOR INSTALLATION, AND TYPE OF SOIL IN WHICH THE ANCHOR IS TO BE INSTALLED; C) GROUND ANCHORS SHOULD BE EMBEDDED BELOW THE FROST LINE AND BE AT LEAST 2 INCHES ABOVE THE WATER TABLE; D) GROUND ANCHORS SHOULD BE INSTALLED TO THEIR FULL DEPTH, AND STABILIZER PLATES SHOULD BE INSTALLED TO PROVIDE ADDED RESISTANCE TO OVERTURNING OR SLIDING FORCES; E) ANCHORING EQUIPMENT SHOULD BE CERTIFIED BY A PROFESSIONAL ENGINEER OR ARCHITECT TO RESIST THESE SPECIFIED FORCES IN ACCORDANCE WITH TESTING PROCEDURES IN ASTM STANDARD SPECIFICATION FOR STRAPPING, FLAT STEEL AND SEALS. 3) ANCHORS RATED @ 3150# OF WORKING STRESS TOTAL FOR BOTH STRAPS, MAY BE USED IF STRAP & ANCHOR SPACING IS REDUCED TO 5'-8" @ WIND ZONE II AND 4'-6" @ WIND ZONE III. STRAPS AND ANCHORS MAY BE INSTALLED 4'-0" O.C. ON SHED ROOF SINGLEWIDES WITH ANCHORS RATED @ 3150#. 4) THE A-B CHANCE STRAP SEAL DEVICE DEPICTED BY FIG. 5-12 MAY BE USED AS DIRECTED FOR ATTACHING THE REQUIRED DOUBLEWIDE CENTERLINE STRAPS TO GROUND ANCHORS. 5) STANDARD TIE -DOWN DETAILS ARE NOTAPPLICABLE TO 5/12 ROOF PITCH DOUBLEWIDES @ WIND ZONE 11 & III. 30 SKYLINE CORP. DOUBLE -WIDE EXTERIOR CLOSURE HARDBOARD SIDING Fasten the precut strip of Masonite with 8d galvanized nails (head should be painted to match the siding) 4" o.c. around the perimeter and 8" o.c. on the intermediate studs. Apply trim and caulking at the centerline, horizontal joints and around windows (if required) as illustrated by the details in Figure 5-18. (In cases where the Masonite has to be cut to fit in the field, the ripped edges should be stained to match the siding with acrylic latex stain). Note: Use 8d galvanized box Figure A nails w/min. 3/16" dia. heads at 4" o.c. around perimeter Vertical Masonite Application and 8' o.c. at intermediate studs. 16" o.c. max. typical studs 3/8" typ i� I i i I • I_ I • I i I I 4" 4 P. I , typ. •1" tYP I •��� I I 333333------ 4" I • • 4" • • • typ• • I • 4-3/8" 1-1/8" typ. Perimeter Joist Unit Stain bottom Centerline edge Figure B Double Wide Masonite Close -Off Application i Unit I Centerline Butyl caulking p at joint Masonite Siding Masonite Close -off field installed w/8d galvanized 8d galvanized box nails 8" o.c. at Wind box nails 4" o.c. Zone I, 6" o.c. at Wind Zones 11 and III. Stain edges to match Masonite (See note 1) Figure C Figure D Vertical Joint Horizontal Joint Masonite Siding Caulk joint w/ ::• butyle caulking Flashing �I:., / Masonite Strip (rip Masonite Siding Masonite Siding from siding sheets) Stain Edges Use 8d galvanized box to match Use 8d galvanized box nails 4" o.c. nails 4" o.c. w/min. 3/16" dia. heads Masonite Siding' (May be lap siding) Figure E NOTE: Typical Window Trim Application 1. All ripped edges to be stained with matching acrylic latex 8"typ.AtWind Zone I, 6" Typ. At .III stain from sidingmfr. Caulk with butyl Wind Zone II caulking to match � trim I� 1/2" ? TYP Butyl caulking to • match trim (fill • rabbetted area) Use 8d galvanized box nails w/min 3/16" dia. heads FIG. 5-18 35 SET-UP PROCEDURES (Continued) TIE -DOWN DETAILS FOR 5/12 ROOF PITCH TIE -DOWN STRAP INSTALLATION EXAMPLE DOUBLE WIDES AT WIND ZONE II & III --------------------- TABLE6A -- --To-properly-install-groant-aTrchors and-tie=down straps fora I-beam spacing. H max.=35" with straps/anchors spaced at 12' home, certain criteria must be established. This criteria is as o.c. maximum. Therefore, tie -down strap spacing should not follows: exceed 12 foot on center. If the home were placed in a Wind Zone II or III area, the tables on pages 30 or 31 would be used. 1. Width of the home. Next, determine the correct soil anchors to be used. An an- 2. Main I-beam spacing of the home. chor soil test probe is required to test the soil where the exam- ple home is to be set. The soil test probe looks like a long_drill _3Wnd-Zone-area-where-home-is-to-be-placed. bit with a fitting at the top which accepts a torque wrench. The torque required to turn the probe, when the probe reaches the 4. Distance from bottom of I-beam to ground. desired anchor depth, is measured. The anchor manufacturer provides a chart relating the measured torque value to the type 5. Torque reading of the soil. of anchor required to provide the desired holding force. 6. Nominal roof pitch of unit (for double-wides). AN INCORRECTLY SELECTED ANCHOR WILL NOT PROVIDE THE REQUIRED LOAD RESISTANCE. For this example assume the home being installed is a 14 foot wide (single -wide) by 66 feet long. The home is being installed in Wind Zone I, and the main I-beam spacing has been established at 99-1/2 inches. The home has a 12 inch tall I-beam, and the clearance from the I-beam to the ground is measured at 20 inches. To determine the distance (H) from the ground to the underside of the floor add the I-beam depth (12") to the clearance between I-beam and the ground (20"). Therefore H=12"+20"=32". From Table 5 on page 27 (Wind Zone 1) determine the maxi- mum allowable strap spacing. Enter table at left hand side for 14' wides, and check the maximum pier height (H) for 99.5" For this example, assume a torque of 300 inch -pounds was measured at a probe depth of 4 feet. A class 4 soil is indicated from the anchor manufacturer data. The correct anchor would be identified and rated for a class 4 soil. Soil anchors must be installed as directed by the anchor man- ufacturer. If the direction of the pull is not in line with the shaft of the anchor, a concrete cylinder collar or a ground anchor sta, bilizer plate is required. The anchor manufacturer installation instructions should describe the correct anchor placement with regard to direction, water table level and frost line location. Sidewall straps are factory installed. ZZ Ground anchor (typical). Optional Strap location A2 I �_---- H11 H2 Straps and Anchors Standard Strap to be spaced location 51- 4" o.c. max. @ Zone 11 Al & 4'- 0" o.c. max. @ Zone III. k r• G1STEq •.�. G ; N0. 19600312 's q,29.o STATE OFF i•Q .0,1 '•�:VO1 ANP'"S WIND ZONE II (100 mph) Unit Width H (max.) H (min.) Angle (max.) Angle (min.) 24' 48" 12" 23.2 degrees 6.12 degrees 26' 48" 12" 20.3 degrees 6.12 degrees 28' 48" 12" 20.3 degrees 5.28 degrees 32' 48" 12" 18.96 degrees 4.91 degrees WIND ZONE III (110 mph) Unit Width H (max.) H (min.) Angle (max.) Angle (min.) 24' 48" 12" 25.2 degrees 6.12 degrees 26' 48" 12" 20.3 degrees 6.12 degrees 28' 48" 12" 20.3 degrees 5.28 degrees 32' 48" 12" 18.96 degrees 4.91 degrees NOTES: 1) Straps and anchors to be rated for 3150 lbs. of working stress (min.). 2) Use H1 and Al for standard strap location. Use H2 and A2 for optional strap location. 3) See page 25 for strap material specification, connection to I -Beam and other setup information. 4) The A-B chance strap seal device depicted by Fig. 5-12 may be used as directed for attaching the required doublewide centerline straps to ground anchors. 34 31 TIE -DOWN DETAILS FOR UNITS WITH 102" SIDEWALLS Factory installed sidewall strap. Not required at Wind Zone I. Alternate Strap angle (A). Z . Ground anchor (typical). Alternate Tiedown Strap location. Wind Zone II or III only. Standard Tiedown \ Strap location Strap angle (A). Factory installed sidewall strap. Not required at Wind Zone I. Ground anchor (typical). TYPICAL DOUBLEWIDE Alternate Tiedown Strap location. Wind Zone II or III only. Alternate Strap Standard Tiedown angle (A). Strap location _ �H rtiS TYPICAL SINGLEWIDE Standard Strap angle (A). STANDARD TIE -DOWN STRAP LOCATIONS 'Q RF;0%r.A � * j No. da 19600312 's 3.5.0 3 '0 S STATE OF Straps and Anchors to be spaced 12'-0" o.c. max. at Wind Zone I. 8'-0" o.c. max. on 5/12 roof pitch units @ Wind Zone I. 5'-4" o.c. max. at Wind Zone II. 4'-0" o.c. max. at Wind Zone III. 14' Singlewides 16' Singlewides 28' Doublewides 32' Doublewides 28' Doublewides with 5/12 roof pitch 32' Doublewides with 5/12 roof pitch H (Max.) 32" 44.5" 36" 49.5" 23.5" 27.5" Wind H Min. 12" 14" 12" 12" Zone I A (Max.) 45.0 degrees 46.0 degrees 50.0 degrees 51.0 degrees 38 degrees 34.5 degrees A (Max.) 19.0 degrees 18.0 degrees 7.0 degrees 10.0 degrees 9 degrees 6 degrees (Max.)28" 37" 25 35" - - Wind H Min. 3 7.5 12" 12 - - Zone II A (Max.) 41.0 degrees 40.5 degrees 4 .5 degrees 41.0 degreesA717 ax.7_ 22.0 degrees 22.0 degrees 23.0 degrees 16.6 degrees H (Max.) 33" 44" 29" 41° Wind H (Min.) 12" 15.5" 12" 12, Zone III A Max. 45.7 degrees 1 45.5 degrees 45.8 degrees 1 45.5 degrees - - A (Max.) 20.4 degrees 1 19.7 degrees 23.0 degrees 1 16.6 degrees ALTERNATE TIE -DOWN STRAP LOCATIONS 14' Singlewides 16' Singlewides 28' Doublewides 32' Doublewides 28' Doublewides with 5/12 roof pitch 32' Doublewides with 5/12 roof pitch' H Max.) 48" 48" 48" 48" - - Wind H Min. 2 2 12" 12 - - Zone II A (Max.) 20.0 degrees 18.6 degrees 20.6 egrees 19.0 degrees - _ ax. 5.2 degrees 4.8 degrees 6.4 aegreeF-- 4.9 degrees - _ H (Max.) 48" 48" 48" 48" - - Wind H (Min.) 1 12" 12" 12" 12" - _ Zone III A(max-) 20.0 degrees 18.6 degrees 20.6 degrees 19.0 degrees - _ A (Max.) 1 5.2 degrees 4.8 degrees 5.4 degrees 4.9 degrees - _ NOTES: 1 1 Straps and anchors to be rated for 3150 lbs. of working stress (min.). 2 See page 25 for strap material specification, connection to I -Beam and other setup information. 3 Main I -Beam spacing to be 99.5" min. on all units. 4 Not available on 5/12 roof pitch units at Wind Zone II or III. 32 TAG I -BEAM ------------- IF -BEAM I -BEAM TYPICAL DOUBLE -WIDE GROUNDANCHOR-- LONGITUDINALTIEDOWNS MAX. HORIZONTALANGLE r� (SEE TABLE) I I ]-BEAM FRONT OR REAR CROSS MEMBER TOP VIEW -BEAM TYPICAL SINGLE -WIDE -BEM --- -- Z-BEAM TYPICAL DOUBLE -WIDE fit--- - - --77 -- ZI-BE; M 71 BEAM 1----- - -- r7 TYPICAL TRIPLE -WIDE MAIN I-BEA SHOULDER -TYPE EYE BOLT, NUT & MAIN I -BEAM WASHER NOT PROVIDED LONGITUDINAL TIEDOWNS _ I\ IL T-, FRONT OR REAR STRAP GROUNDANCHOR� CROSS MEMBER GROUND LEVEL CABLE -FRAME TIE -DOWN CONNECTION VERTICALANGLE IS MEASURED FROM STRAP TO LEVEL HORIZONTAL PLANE @ ANCHOR SIDE VIEW 2 TIE -DOWN STRAPS @ FRONT & REAR OF EACH FLOOR. WIND ZONE II NOMINAL UNIT WIDTH (feet) SINGLFWInFS nnI IRI FWInFR I nn1 IRI FAA/InDc,.drii,), RnnF DITrw ANGLES DEGREES 12' 14' 16' 18' 24' 26' 28' 32' 24' 26' 28' 32, TRIPLEWIDES TAG UNITS MAX. VERTICALANGLE 46 35 WiLW 37 32 13 35 28 19 NA 23 42 MAX. HORIZONTAL ANGLE 20 2020 20 20 20 20 20 NA 20 20 2 TIE -DOWN STRAPS @ FRONT & REAR OF EACH FLOOR. WIND ZONE III NOMINAL UNIT WIDTH (feet) SINGLEWIDES DOUBLEWIDFS I nn11Rl FWInFG w/Fi/19 RnnF PITRH ANGLES DEGREES 12' 14' 16' 18' 24' 26' 28' 32' 24' 26' 28' 32' TRIPLEWIDES TAG UNITS MAX. VERTICALANGLE 32 NA NA NA 27 17 NA NA 11 NA NA NA NA 27 MAX. HORIZONTAL ANGLE 20 20 NA NA 20 20 20 NA 20 NA NA NA NA 45 4 TIE -DOWN STRAPS @ FRONT & REAR OF EACH FLOOR. WIND ZONE II NOMINAL UNIT WIDTH (feet) Smn.i FWInFS nnl IRI F_ I nnl IRI MnnnGc ­Irlio DnnG DIT! u ANGLES DEGREES 12' 14' 16' 1 18' 1 24' 26' 28' 1 32' 1 24' 26' 28' 32' TRIPLEWIDES TAG UNITS MAX. VERTICALANGLE 1 62 157 151 145 1 61 58 56 150 1 57 54 51 43 52 NA MAX. HORIZ( LANGLE 1 45 145 145 1 45 1 45 1 45 1 45 1 45 1 45 1 45 1 45 45 45 NA 4 TIE -DOWN STRAPS @ FRONT & REAR OF EACH FLOOR. WIND ZONE III NOMINAL UNIT WIDTH (feet) SINGLEWIDES I DOUBLEWIDES I nnllRl FWInFS w/5/l9 RnnF PITRH ANGLES DEGREES 12' 14' 16' 18' 24' 26' 28' 32' 24' 26' 28' 32' TRIPLEWIDES TAG UNITS MAX. VERTICALANGLE 56 49 41 145 31 54 51 47 39 49 1 45 41 28 42 NA MAX. HORIZONTALANGLE 45 45 45 45 45 1 45 45 45 45 45 45 45 NA NOTES: 1) Longitudinal Tiedowns are in addition to diagonal tiedowns along the main rails. 2) Ground anchors, straps & cables (including eyebolt, nut, etc.) shall be capable of resisting an ultimate load of 4725 lbs. (3150 lbs. design) min. Install ground anchor in accordance with ground anchor manufacturer's installation instructions. See note 2 page 29. 3) Anchorage system subject to local inspection at the time of installation. 4) Other methods approved by local building authorities may be used. 5) Longitudinal tiedowns are not required at wind zone I. 6) If a doublewide unit has a roof pitch exceeding 3/12 (i.e. 4/12) then use 5/12 roof pitch requirements. 33