TRIPLEWIDE SET UP INFORMATION BULLETIN
IMPORTANT: PLEASEREVIEW WITH YOUR SET UP CREW
o improve our finished product, we have been asked to leave the shingles off of tag
nit dormers so they can be installed on sight. We now have approvals to honor your
SCANNEo
St Lucie
ive with homes produced after June 14, 2000 , SN 0120N, we will begin c0unfy
;implementation of two new procedures to enhance the visual appearance of the roof
.at the tag unit / dormer transition.
The first revision will change our methods of completing the tag and main unit roof
sheathing. Luaun paneling will be used for temporary close off at the roof mating
line. Roof sheathing shipped loose in the home, must be cut to size and installed after
the units are secured together. This is illustrated in the "Addendum for Alternate
Roof Sheathing Application on Tag Unit" print attached.
The second revision will delete the shingles on the dormer. Shingles will be applied at
the factory as illustrated on the "Closed Valley for Dormer Tag" print. Once the
triangular beam and roof sheathing is secured, properly apply underlayment and
shingles as per Manufactured Home Installation for Triple Wide Homes Manual.
Also, before shingles are applied and after the underlayment is installed, be sure to
strike chalk lines to insured good straight course lines.
May 19, 2000 `
I l
I
W
Main Unit Sidewall save.
Removeable roof sheathing
panel for access to plywood
beam.
Tag unit
24' on main
unit side.
16' on tag \
unit side. —
Varies Ifs■
s Y 1
.�
Tag and main
a
Field Installed -roof - -
sheathing panels.
See detail'R.
End
2x blocks 24"
Triangular plywood beam
Dormer ratter (typical)
unit mating line. 40' s t l
m S Tp OFF ! Removeable roof sheathing
DETAIL 'A' P` w �o panel for access to plywood
a �1.'•• 1. �`;.•' beam.
v,14, goL on o♦♦w♦�'f/� REVIEWED BY ENGINEERING DEPT.
INSTRUCTIONS: \\ ISSUED By Fni 1 OW•UP SERVICES DEPT.
1) Bring main unit and tag unit together as described in the Skyline Corporation Manufactured Home E E g 1 4 2000 File: MH9321
Installation Manual. Vol.: 1
2) Bolt or lag triangular beam halves together as described in the Skyline Corporation Manufactured V 14DERWRITERS Sec.: 4
Home Installation Manual. 4AaoRg7c»IEs, INC. III.: 151LPL4Le.84
3) Reinstall removeable roof sheathing panels, and install 40" wide roof sheathing panels. Fasten panels
to each dormer rafter and 2x block with 8d twist nails, or 15Ga.x7/16"x1-1/2" staples 4" o.c. Panel REVISIONS:
seams must fall at a dormer rafter and 2x block. Addendum to Installation ■
4) Install remaining roof underlayment and shingles as described In the Skyline Corporation Manufactured Instructions for Alt. Roof
Home Installation Manual, and the Manufactured Home installation for Triple Wide Homes Supplement.
5) All other aspects of the setup should adhere to the requirements of In the Skyline Corporation Sheathing App. on Tag Units
Manufactured Home Installation Manual, and the Manufactured Home Installation for Triple Wide p� L�Ry. BringingAmerfca Home
Homes Supplement.. ONG. BY JTL - 111212000
36' wide roll-roofino i
(50 lb. or heavier).
Shingles to extend post r+S # #l>
•
valley omterline 1T min. '%' k if z
Shingles are left off domes <'
tag for field kvstallabon.
' . ' .... ?iz
v ia.
Unded yrnaM A •z iri3<:
.�.i.
�13
. See Triple •Wide',' N'' :•
Manual for ,•
•
.� valley construction ,c3
'f jaw ' ; � •tliil�
,* e
Tag Unit
Strike chalk lines; Mating Line
for shingle courses
from eave zz
Tag Eave
-GT- unrem
sheathing.
C
Underiamwit
0
r
-- N-
0
0
.12 removeabla sheathing o
fLv yes to rjdgebeam. D
00
rn
rO
r
Main Unit
Install t st a courses of /
shingles V to Z backtrom Roof decking
valley centerline for field File: MH9321
Main Unit Eave Vol.: 1
Sec. 3
III.: 248B
REVISIONS: I) Revise valley shingle) - JTZ - 4/4/2000
Closed Valley for 850-S-
Dormer Tag 111B
BringingAmerica Home
PRE-LIM BY.• 3/-0/96
ENG. BY,•
C
c
r.
C
N
INSTALLATION MANUAL SUPPLEMENT FOR
TRIPLEWIDE WITH HINGED ROOF
Raising the hinged portion of the roof.
For triple wide homes, the center section of the unit is the hinged section. See figure 1 below for a'general truss layout in the
folded position. The hinged portion of the roof has been temporarily secured for transportation. Remove all shipping braces
or straps before attempting to raise the hinged sections of the roof.
I
NOTE: All of the temporary securement must be removed from the unit before proceeding to avoid stressing the roof
unnecessarily.
rrv.
Raise the hinged sections of the roof by using lifting jacks or a crane. (See Fig. 2). The jacks are spaced along
the length of the home. One side of the roof is raised first. Lifting locations are to be located 8 fe o maximu . ise
the roof, so that the hinged diagonal member of the truss is just able to be swung into position. ( it above the ce ter
truss vertical member) Do NOT over jack. This process is repeated on the opposite side of the ti section until t e entire
roof is in position.
� ro
`r r.A
L u
3The final position of the
truss is shown on the
OFenclosed drawing.
�— Lifting
y
O �
J �
4
� J
Q �O
14CTs
tinged diagonal
2x4 rail
Come�verffcal
Horizontal member 2x8 Fait
FIG. 2
Use the following method to secure the hinged truss diagonal members. See Figure 3.
Secure the hinged truss diagonals to the horizontal truss members by driving #84" screws 12, o.c. max. through each 2x4
rail into the factory installed 2x8 rag. Repeat fastening process for both hinged sides of the center section truss.
APPROVED
PF] C•rp—V.n
M.dl.- W I
wrdvos
MUD M.nuhetund
Nom.
C...buctlon a
s•aVr er.nd.rd
File: MH9321
Wcable
Vol: 1Page 1 of 3. Sec q
ag m III: 62_
1,
i Truss centerline
i
fTop chord
I APPROVe I
I PFS Corporal n
I Madison W
bnt� Hinged Diagonal i Fasten each 2x4 rail to the 2x6 ran 01/31/05
i Y T �C �+�y i wl-#8x3" screws 12' ox. max. HUD Manufact r
i
!r +� 2x4 rail I Home
r �7 I ConstructHo &
�Factory 1nst ed 2x8 rag. Safety Stand rd
i OP 1 A.
`i«►taQ�f • Center Truss horizon member
• •......•� J ti
s irts� FIG.3 `e9C
Roof Close-up.`' ru��
�V�
The units should now be joined together as directed in the Skyline Corporatio ���facttrr stallation• Manual and
Triplewide supplement Care should be taken not to damage the ceiling duri t operationo�4s
A peak frame is required to be installed to finish the peak area of the home. See res 4 and below. The peak framing is
shipped loose in eight (8) foot sections and is to be installed after the hinged sections be n secured. Toe -Screw peak
framing to 2x4 rails along the truss top chords with #8x3" screws 2(r o.m 2x4 blocks of pea me -should tine up with
trusses.
Peak frame
r Y
#B)W screws 20" o.c. max. -
Peak tame toes\crewed.
i
FIG. 4 2x4 block's. FIG. 5 Truss top chord
The triangular area at the raised section of each gable endwall is to be closed by using 318" rated sheathing nailbase or
hardboard siding provided. The nailbase or siding should be fastened to the gable endwall truss using ed nails 6" o.c.
The remaining roof and endwall close-up is to be as described in the Skyline Corporation Manufactured Home installation
Manual and Triplewide supplement.
File: MH9321
Vol: - I
Page 2 of 3. Sec: 4
9 BrfngingAmerfca Home III: 62D
t I
i
Yw��
•Zf A
OP
Hhged
Truss centerline
Top chord
/ ! PFS Corpora
Fasten each 2x4 rail to the W raft Madison V
01/31/05
)nil
mow/ i{8x3" saews 12" o.a max HUD Manufac
2x4 rail r Home
i Constructioi
Fac loryinst Led 2x8 rill. Safety Stanc'
,111 Truss horizon member
J�
FIG.3 0 p0N- -go
Roof Close-up. r'A
Q
!v ct�
The units should now be joined together as directed in the Skyline Corporate Viactur�d stallation. Manual and
Triplewlde supplement Care should be taken not to damage the ceiling durl g f operation
A peak frame is required to be installed to finish the peak area of the home. ures 4 and below. The peak framing is
shipped loose in eight (8) foot sections and is to be installed after the hinged sections be n secured. Toe -Screw peak
framing to 2x4 rails along the truss top chords with #8x3" screws 20" o.m 2x4 blocks of pea me should line up with
trusses.
Peak frame
t
Y �.
*54" screws 20" o.c. max. -
Peak frame toesmwed.
FIG. 4 2x4 blocks. FIG. 6 Truss top chord
The triangular area at the raised section of each gable endwall is to be closed by using 3/8" rated sheathing nallbase or
hardboard siding provided. The natibase or siding should be fastened to the gable endwall truss using 6d nails 6" o.m
The remaining roof and endwall close-up is to be as described in the Skyline Corporation Manufactured Home Installation
Manual and Triplewide supplement
LNVol: MH� 1 _
Page 2 of 3. Bringing America Home Sea 4
III: 82D
r
Rev-- nad 2d rd . Jit.. e
Plumbing Vents:
If the center section of the triplewide has a toilet installed on it, then a plumbing vent will be required to be installed
through the hinged portion of the roof. One vent is required for each toilet The plumbing vents have been factory
Installed through the ceiling into the roof cavity and above the insulation. The additional piping, couplers and
adhesive have been factory provided to complete the vents. The vent pipe shall be installed straight through the
roof. No additional turns are allowed to be installed between the factory and field installed portions of the vent
pipe.
The exterior roof flashing has been factory installed. After the hinged portion of the roof is secured, install the
remaining piping through the factory installed flashing. Secure the pipe sections togetherwith the provided
coupler and cement. The plumbing vent must extend at least 2 inches above the roof.
Firestopping for site installed roof jack/vent assemblies for furnaces, water heaters and/or fireplaces with
hinged type roof trusses:
The gas furnace, gas water heater or fireplace roof jack (exhaust vent) must be firestopped between the interior of
the home and the ceiling cavity. Gypsum firestopping has been precut and is included with the home. Figure 6
below depicts the provided gypsum firestopping. '
Securement screws,
4 each half -
minimum length 1-112"
Pre-cut Hole -
diameter of
exhaust vent
Approx.10
FIGURE 6
Firestopping must be Installed tight against the roofjadc and secured in place with screws. The screws must be
driven Into the roof trusses or a wood backer to hold the firestopping securely in place.
Note:
This firestopping requirement is for use only with units that
conform to HUD alternate construction letter number 95-08-AC.
REVIEWED AND ISSUED BY
CONFORMITY ASSESSMENT SERVICES
JUL 2 4' 2002
DAPIA • UNDERWRITSRS
I.ABORATORIEB INC
INE
Page 3 of 3. Bringing America Home
APPROVED
PFS Corporation
Madison WI
01131 /05
HUD Manufactured
Home
Construction &
Safety Standard
File: MH9321
Vol: - 1
See
III: 82E -