Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 69, Creekside Date: August 14, 2019
Address: 8612 Cobblestone Drive, Fort Pierce, FL Order #: 19DR575
Area Tested: Building Pad Permit #: 1810-0622
Material Type: Very Dark Brown Sand Tech:, RP
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.
Palm Bay, FL 32907 Proctor Method
ASTM D-155 @ CoUn
Test
#
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
SW Corner
of Building Pad
12"
FL
9.2
104.9
105.0
9.0
99.9%
Yes
2
lNE Corner
of Building Pad
12"
FL
1 8.5
1 105.0
105.0
9.0
100.0%
Yes
3
Center
of Building Pad
12"
-FL
9:0
104.8
105.0
9.0
99.8%
Yes
4
5
6
7
8
9
10
11
12
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Digitally signed by Keith LeBlanc
stJ{ DN: c=US, st=Florida,l=Pompano
Y..
.•��������» f Beach, o=Federal Engineering &
u,
Legend for Elevation: ��0����.v�GENSF0��: ,Testing, Inc., ou=FL Professional
. ineer #59394, cn=Keith
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift*: No.59394 ;•* e Engineer
SL = Springl'ne FL = Final Lift 3.0 : * ; ¢ LeBlanc;'einail=keith@fed-
9 STATE OF
SG = Subgr de BG = Below Grade ••acoR;oP. en com
I ac�s,..
BC = Basecdurse BOF = Bottom of Footing
TOP =Top c�f Pipe FG =Finished Grade 1oS/ONALEe•`'
„1 Date: 2019.08.16 11:47:51 -04 00
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of
material only. A�density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure.
The results do of preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the
proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this
work. '
PAGE 1 of 2
Pursuant to your request, Federal Engineering & Testing, Inc, (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material ori,ly. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of add�d fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of
the added Ifill material does not include an analysis of the underlying soil materials to determine if they are capable of
supporting,the proposed structure without settlement. This density compaction test does not warranty any underlying soil
materials o I r conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to
verify the underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results arel based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities,
excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and
re -tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future
Page 2 of 2