Loading...
HomeMy WebLinkAboutLETTER ABOUT FLOOR TRUSS LAYOUTl THE ERIVIIVG CORPORATIO GENERAL CONTRACTORS/PROFESSIONAL ENGINEERS CGC019771 - PE 022920 Mr. Gordon.Willett ,.Blue'Water Homes; L.C. '590 Peacock Blvd. #7 Port St. Lucie, FL 34956 Reference: Katzman Residence Lot 109, The -Reserve . B96-020256 Subject: Floor Truss and C'asterete Lintel Revisions Dear Mr. Willett, Marc' SCANNED BY St Lucie County The new floor truss layout, through the second story floor section above the garage (Exercise room, etc.), has the floor trusses span across the entire garage, bearing in turn, on both of the exterior CBS walls, rather than on a series of floor girders and steel columns, as originally designed. This has cleaned up the design considerably. This has eliminated a major bearing on one of the. garage door beams, allowing us to use lintels above all of the openings, eliminating the formed and poured beam originally, required, but has added more distributed load on each of the three lintels above the garage doors. Consequently, each of the lintels should contain two #5 rebars, the course of block directly above the lintel should be constructed of beam block and also contain two #5 rebars. The bond beam on top of these openings should also contain two #5 rebars. All of the intervening courses of block can be constructed in a normal manner. All of the cells above the garage door openings should be filled with coarse grout, from the bond beam, down to the lintel, forming an approximate 66 deep composite beam. A #7 rebar may be substituted for two #5 rebars if you wish. If you have any questions , please contact me at your convenience. Thank you. Sincere Dr. Ernest A. Kuonen, Florida Registered Engineer #22920 ST, LUCIE COUNTY BUILDING DIVISION REVIEWED FOR COMPLIA E REVIEWED BY DATE PI ANS AND 134 BUTTONWOOD CIRCLE • TEQUESTA,.FLORIDA 33469 o (407) 747-2152