HomeMy WebLinkAboutPROPOSALRECEIVED
MAR 19 2019
PROPOSAL ST. Lucie County, Permitting
FROM:
1ASSURED CONTRACTING LLC
3553 NW 1 Vh Ave
Oakland Park, FL 33309
TEL # 954-200-0073
,EMAIL: 4supremebuilders@aft.net
Todd Nepola
Phone: 954-966-8181
Email: todd(&cc-rea.com
0301302019
PAGE NO. 1 OF 1 PAGES
DATE: Mar. 13, 19 C4 �tV D
JOB NAME: TENANT IMPROVEMENT
ADDRESS: 7133 S US I
CITY/STATE/ZIP: Port St Lucie, FL 34952
hereby submit specifications and estimate for:
,OPE OF WORK: TENANT IMPROVEMENT
uctural
• Frame three (3) new offices with 3 -5/8 20 GA stud and track.
• Frame new conference area with 3-5/8 20 GA stud and track.
• Frame two (2) new ADA bathrooms with 6" 20 GA stud and track.
• Bathroom ceiling will be 9ft high acoustical ceiling.
• Frame new break room with 3-5/8 20 GA stud and track.
• Frame new storage area with 3-5/8 20 GA stud and track.
• Storage area will be 9ft high acoustical ceiling.
• Frame new reception area with 3 5/8 20 GA stud and track.
• Frame all new exterior with 1x2 and 1x4 furring strips.
• Frame new party room with 6" 20 GA stud and track.
• Insulate exterior wall with file back or 4.5 insulation.
• Insulate interior walls where shown on plan with R-19 battered insulation.
• Close door opening in rear of building .where as shown on plan with concrete
blocks and stucco to match existing building.
• Remove existing sliding glass from .rear of building and enclose with concrete
block and leave opening for new 3070 fire rated solid steel door.
• Remove existing steel door and install new 3070 fire rated steel door.
• Install solid core metal frame doors on 3ft x 7ft high on all locations shown on
plan.
• Install lever locks on all doors.
• All areas will be drywall with 5/8 one (1) hour fire rated drywalls.
• Finish with level 4 finish.
• Install new flooring.
• Install new 5 %" baseboard throughout entire unit.
• Install new cabinet into breakdown.
• Install new 2x2 mop sink.
• Paint entire area where work was done.
Acoustical Ceiling
• Ceiling throughout entire offices, conference area and kitchen will be 2x4 - 10
ft high.
Ceiling tiles will be 2x4 revealing tiles.
Electrical
• Install one (1) 200 AMP electrical panel.
• Install one (1)125 AMP electrical panel.
• Install fourteen (14) electrical back up combo lights.
• Install ceiling capacity censor as shown on plan.
• Install new power pack for switches and lights as shown on plan.
• Install four (4) new LED battery backup exit signs.
• Install forty two (42) LED 2x4 lay in ceiling lights.
• Install outlets and switches as shown on plan.
• Run wire from electrical panel to supply AC chilling system in ceiling for
Chilling system 1 and 2
Mechanical
• Supply and install (10) Air Return.
• Supply and install (25) Air Supply.
• Supply and install 200' Hard Trunk Line R6 Fiberglass Duck work.
• Supply and install (2) Smoke Detector.
• Supply and install (2) Carrier (7.5 ton) RTU with motorized damper and heater.
• Supply and install (2) Programmable Thermostat.
• Supply and install (2) Safety Switch.
• Supply and install (2) Bathroom Exhaust Fan and Vent.
2 Curb Support (Welding Service).
• Anchor (2) curb.
• Hook up (2) Condensate Drain Line within 3-4 feet
• Crane Service.
f • Certified Test and balance Service.
Plumbing
• Run 1" supply from existing supply to feed two (2) bathrooms, break room, (1)
mop sink and drinking fountain.
• Install new shut off valve.
• Install new back flow.
• Cut existing slab.
• Install new 3" PVC pipes for toilet and lavatory drainage and sink.
• Install new.lab for ADA bathroom.
Install new toilet in ADA bathroom.
• Install new single sink in break room.
• Install new 30 gallon water heater above ceiling in restroom area.
• Install new drain pan.
• Install new release valve drain.
B: If there are any additional changes from plan will be considered as a
Change Order.
Material and Labor Cost = $168,875.93
here by propose to furnish labor and materials complete in accordance with the above
,ifications. for the sum of:
AYMENT SCHEDULE:
AL $168,875.93 (ONE HUNDRED AND SIXTY EIGHT THOUSAND, EIGHT HUNDRED AND
ENTY FIVE DOLLARS AND NINETY THREE CENTS).
I material is guanteed to be as specified. All work to be completed in awork-man-like manner
:cording to standaarrd practices. Any alteration or deviation from above specifications involving extra
fists will be executed only upon written orders, and will become an extra charge over and above the
;timate. All agreements contingent upon strikes, accident or delays beyond our control. This proposal
abject to acceptance within 14 days and it is void thereafter at the option of the undersigned.
4TE OF WORK COMMENCEMENT AND SUBSTANTIAL COMPLETION
)mmence work: Upon Permit Issuance. Construction time through - substantial completion:
)proximately 6 weeks, not including delays and adjustments for delays caused by: holidays; inclement
;ather; accidents; additional time required for change order and additional work; delays caused by
uner, owner's design professionals, agents, and separate contractors; and other delays unavoidable
beyond the control of the contractor.
I
CONCEALED CONDITIONS: This Agreement is based solely on the observations Contractor was able
was able to make with the project in its condition at the time the work of this Agreement was bid. If
additional concealed conditions are discovered once work has commenced or after this Agreement is
executed which are not visible at the time this Agreement was bid, contractor will point out these
concealed conditions to owner, and these concealed conditions will be treated as additional work under
t 'is Agreement. Contractor and Owner may execute a change order for this additional work. Contractor
is, released, held harmless, and indemnified by owner from all pre-existing mold,, fungus, mildew, and
organic patho en problems and is not responsible for costs or damages associated with correcting,
containing, testing, or remediating the same.
i
i
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted, you are authorized to do the
work as specified. Payments will be made as outlined above.
I
ACCEPTED:
Signature
DATE
Signature ASSURED CONTRACTING LLC.
I
I