Loading...
HomeMy WebLinkAboutEVALUATION REPORT - MODIFIED BITUMENi QOtRJNITYIERD I I EVALUATION REPORT EXTERIOR RESEARCH & DESIGN, LLC. Certificate of Authorization #9503 353 Christian Street Oxford, CT 06478 (203) 262-9245 TRI-BUIL� Materials Group, LLC Evaluation Report A42970.10.12-R2 PO Box 700 SCANNED FL16027-112 Rutherford, NJ 07070 BY Date of Issuance: 10/23/2012 (800) 516-1485 St Lucie County Revision 2: 09/25/2017 SCOPE: This Evaluation Report is issued under Rule 611320-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code. The product described herein has been evaluated for compliant a with the 6th Edition (2017) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems LABELING:1 Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. � CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes,'the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity) ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in advertisinlg literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distrib I tors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 4, plus a 26-page Appendix. Prepared $ — y Robert J.M. Nieminen, P.E. , �L+ : ? ••f `.� The facsimile seal appearing was authorized by Robert Nieminen, Florida Registration No. 59166, Florida DCA ANE1983 '�l�r� \�]4 P.E. on 09/25/2017. This does not serve as an electronically signed document. CERTIFICATION OF INDEPENDENCE: 1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the E product. 5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically lly for that purpose. Entity Examination FM Approvals (TST1867) FM 4470/4474 FM Approvals(TST1867) FM 4470/4474 FM Approvals(TST1867) FM 4470/4474 P,RI (TST5878) Physical Properties PIRI (TST5878) Physical Properties PRI (TST5878) Physical Properties PRI (TST5878) Physical Properties Miami -Dade (CER1592) HVHZ Compliance f I iami-Dade (CER1592) Proposal for Review U,L LLC (QUA9625) Quality Control UL LLC (QUA9625) Quality Control UL LLC (QUA9625) Quality Control 4. PRODUCT DESCRIPTION: I This Evaluation Report covers TRI-BUILT Modified Materials Group, LLC published installation instn following membranes make up the subject systems. UTRiNITY I ERD Reference Date 3023458 07/18/2006 3030668 09/12/2007 3032172 06/12/2009 PUSA-062-02-01 12/04/2007 PUSA-061-02-02 01/28/2008 PUSA-064-02-02 02/27/2008 PUSA-062-02-02 12/04/2008 Various NOAs Various 10-0823 10/12/2010 ML Agreement 02/27/2012 ML Correlation, R27202 08/20/2012 Service Confirmation, R14571 Exp. 10/06/2018 Bitumen Roof Systems installed in accordance with TRI-BUILT ctions and the Limitations / Conditions of Use herein. The Table,l: Roll -Goods for TRI BUILT Modified Bitumen Roof Systems Type Product Specification Reference Grade Type SBS Membranes TriBuilt SA SBS Base ASTM D6163, Table 2 S I TriBuilt SBS Granular ASTM D6164 G I TriBuilt SA SBS Cap ASTM D6164 G I APP Membranes i TriBuilt APP Smooth ASTM D6222 S I TriBuilt APP Granular ASTM D6222 G I TriBuilt SA APP Cap ASTM D6222 G I S. LIMITATIONS: 5.1 This is a building code evaluation. Neither TrinityJERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions. 5.3 Refer to a current Approved Roofing Materials Directory for fire ratings of this product. 5.4 For steel deck installations, foam plastic insulation shall be separated from the building interior in accordance with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.6 apply. 5.5 The roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC I Approval documentation. 5.ti For recover installations, the existing roof shall be examined in accordance with FBC 1511. 537 For mechanically attached insulation or membrane or strip -bonded insulation, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29, Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements. Exterior Rese�rch and Design, I.I.C. Evaluation Report A42970.10.12-112 Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION FL16027-112 �I TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Revision 2: 09/25/2017 Page 3 of 4 TRINITY 1 ERD APPENDIX 1:'ATiACHMENT,REQUIREMENTS FOR WIND UPLIFT RESISTANCE `' Table Deck Application Type Description Page IA-1 Wood New or Reroof (Tear -Off) A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 4 1A-2 Wood New, Reroof (Tear -Off) or Recover A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 5 1B Wood New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 5 1C Wood New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 6 1D Wood New, Reroof (Tear -Off) or Recover D Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover 6 1E-1 Wood New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 7 1E-2 Wood New, Reroof (Tear -Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 8 1F Wood New or Reroof (Tear -Off) F Non -Insulated, Bonded Roof Cover 8 2A Steel or Structural concrete New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 9 2B Steel or Structural concrete New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 2C Steel or Structural concrete New, Reroof (Tear -Off) or Recover D Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover 1' 3A Structural concrete New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 11-14 3B Structural concrete New or Reroof (Tear -Off) F Non -Insulated, Bonded Roof Cover 14 4A LWIC New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 15-16 4B LWIC New or Reroof (Tear -Off) A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 16 4C LWIC New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 17-19 5A CWF New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 20 5B CWF New, Reroof (Tear -Off) or Recover A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 21 5C CWF New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 22 5D CWF New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 22 5E CWF New, Reroof (Tear -Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 22 6A Gypsum New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 23 6B Gypsum New, Reroof (Tear -Off) or Recover A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 24 6C Gypsum New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 24 6D Gypsum New, Reroof (Tear -Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 24 7A Various Recover A-1 Bonded Insulation, Bonded Roof Cover 25-26 7B Various Recover F Non -Insulated, Bonded Base Sheet, Bonded Roof Cover 2F The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Insulation / base sheet fasteners shall be of sufficient length for the following deck engagement: ➢ Wood: Minimum 0.75-inch penetration. ➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck. ➢ Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions. 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the CIA requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover. Exterior Research and Design, LLC. d/b/a Trinity ERD Evaluation Report A42970.10.12-R2 for FL16027-112 Certificate of Authorization #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26 TPJN IN I ERb . 15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications. �: ....:. TABLE 1:-TRI-BUILT ROOF COvi=I Reference Layer Material Application BP -AA Base Ply FBC Approved ASTM D4601, Type II (Base and Ply sheets, Asphalt -Applied) HA at 20-40 Ibs/square Ply FBC Approved ASTM D2178, Type IV or VI SBS-AA (SBS, Asphalt -Applied) Cap Ply TriBuilt SBS Granular HA at 20-40 Ibs/square SBS-TA (SBS, Torch -Applied) Cap Ply TriBuilt SBS Granular Torch -Applied SBS-SA Base Ply TriBuilt SA SBS Base (SBS, Self -Adhering) Self Adhering Cap Ply TriBuilt SA SBS Cap APP-TA Base Ply or Ply TriBuilt APP Smooth (APP, Torch -Applied) Torch -Applied Cap Ply TriBuilt APP Smooth, TriBuilt APP Granular APP-SA Cap Ply TriBuilt SA APP Cap Self -Adhering (APP, Self -Adhering) 16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A applies: VAPOR BA6RIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED INSULATION PER TABLE 3A Option # Primer Vapor Barrier Insulation Adhesive MDP (psf) Type Attach VB-1. ASTM D41 TriBuilt SA SBS Base Self -Adhering Inta-Stik or CR-20, 12-inch o.c. -60.0 VB-2. ASTM D41 TriBuilt SA SBS Cap Self -Adhering Insta-Stik, 12-inch o.c. -75.0 VB-3. ASTM D41 TriBuilt SA SBS Cap Self -Adhering Millennium One Step Foamable Adhesive, 12-inch o.c. -157.5 VB-4. ASTM D41 TriBuilt SA SBS Cap Self -Adhering CR-20, 12-inch o.c. -270.0 VB-5. ASTM D41 TriBuilt SA SBS Base Self -Adhering Millennium One Step Foamable Adhesive, Millennium PG-1 Pump Grade Adhesive, OlyBond 500 or CR-20, 12-inch o.c. -290.0 17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements. 18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads. Exterior Research and Design, LLC. d/b/a Trinity ) ERD Evaluation Report A42970.10.12-112 for FL16027-112 Certificate of Authorization #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26 \I TRINITY ERD TABLE IA-2: 1N00D:DECKS.- LAEW-CONSTRUCTION; REROOF (TEAR-04�'oR RECOVER '-2�, SYSTEU TYPE A-2: MECHANICALLY`ATTACHED ANCHOR -SHEET, BONDED INSULATION, BONDED ROOF COVER System Deck Anchor Sheet Base Insulation Top Insulation Roof Cover (Note 15) MDP No. (Note 1) Type Fasteners Attach Type Attach Type Attach Base Ply Ply Cap Ply (psf) Min. 0.25-inch Dens Deck, Polyglass 12-inch o.c. in 4- (Optional) FBC Dens Deck Prime, SECUROCK Min. 19/32- Elastobase or OMG Flat inch lap and 12- Approved, Gypsum -Fiber Roof Board, W 5 inch plywood Polyglass Bottom Plates inch in two, ASTM C1289, HA Min. 0.75-inch FescoBoard HA BP -AA (Optional) SBS-AA, SBS- -60.0 at max. 24- Elastobase (square) with equalllyly spaced, type II polyiso- (homogeneous) or min. 0.5- BP -AA TA, APP-TA inch spans Poly Roofgrip #12 staggered center cyanurate inch Structodek High Density rows Fiberboard Roof Insulation Min. 19/32-. Polyglass OMG Flat inc o.c. in inch lap and 12- (Optional) FBC (Optional) Elastobase or Approved, Min. 0.25-inch Dens Deck, One or SBS-SA, APP- W-6 inch plywood Polyglass Bottom Plates inch o.c. in two, ASTM C1289, HA Dens Deck Prime, SECUROCK HA SBS-SA more SBS- SA, SBS-TA -60.0 at max. 24- Elastobase (square) with equally spaced, type II polyiso- Gypsum -Fiber Roof Board SA or APP- or APP-TA inch spans Poly Roofgrip #12 staggered center rows cyanurate TA WOAD; DECKS— NEW CONSTRUCTION REROOF`(TMA-OFF) oR RECOVER; SYSTEM -.TYPE B:"MECHANICALLY,ATT-ACHED:BASE INSULATIONj BONDEDTOP INSULATION BONDED ROOF COVER' ' System Base Insulation Layer Top Insulation Layer Roof Cover (Note 15) MDP No. Deck (Note 1) Type Fasteners Attach Type Attach Base Ply Ply Cap Ply (psf) Min. 19/32-inch Min. 1.5-inch Dekfast Hex with Min. 0.75-inch FescoBoard (Optional if (Optional if using W-7 plywood at max. 24-inch ENRGY 3, H-Shield Dekfast #12 or TruFast 1 per z (homogeneous) or min. 0.5-inch HA using AA Ply) AA Base) One or SBS-AA, SBS-TA, -60.0 1.33 ft Structodek High Density Fiberboard more BP -AA or APP-TA spans or Polytherm MP-3 with TruFast DP Roof Insulation BP AA APP-TA Exterior Research and Design, I.I.C. d/b/a Trinity) ERD Evaluation Report A42970.10.12-R2 for FL16027-R2 Certificate of Authorization #9503 eH EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 5 of 26 \4 TRINITY ERD TABLE4E 2:=WOOD DECKS- NEW CONSTRUCTION; REROOF (Tl=aa=OFF)'oR`RecoVER - " SYSTEM TYPE E >NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER — System Base Sheet Roof Cover (Note 15) MDP No. Deck (Note 1) Base Fasteners Attach Base Ply Cap Ply (psf) Min. 19/32-inch Polyglass Elastobase, Polyglass Elastobase OMG Flat Bottom Plates (square) with 12-inch o.c. in 4-inch lap and 12-inch (Optional) One or W-1 plywood at max. Poly, Polyglass G2 Base, J Teed Roofgrip #14, Dekfast Hex with Dekfast #14 o.c. in two, equally spaced, staggered more BP -AA or SBS-AA, SBS- -52.5 24-inch spans e, Firestone Base, Base, Gy or TruFast MP-3 with TruFast HD center rows APP-TA TA, APP TA 28, Base AF LAS # Ply 28, Tamko Glass Base or GAFGLAS #75 Min. 19/32-inch Polyglass Elastobase or Polyglass Dekfast Hex with Dekfast #14 or TruFast MP- 12-inch o.c. in 4-inch lap and 12-inch One or more SBS- SBS-SA, APP- W-2 plywood at max. in two, equally spaced, staggered SA, SBS TA or 52.5 24-inch spans Elastobase Poly with poly top surface 3 with TruFast HD ter rows center cen SA APP-TA Min. 19/32-inch Polyglass Elastobase or Polyglass OMG Flat Bottom Plates (square) with 12-inch o.c. in 4-inch lap and 12-inch (Optional) One or SBS-AA, SBS- W-3 plywood at max, Elastobase Poly Roofgrip #12 o.c. in two, equally spaced, staggered more BP -AA or TA, APP TA -60.0 24-inch spans center rows APP-TA Min. 19/32-inch Polyglass Elastobase or Polyglass OMG Flat Bottom Plates (square) with 12-inch o.c. in 4-inch lap and 12-inch One or more SBS- SBS-SA, APP- W-4 plywood at max. Elastobase Poly with poly top surface Roofgrip #12 o.c. in two, equally spaced, staggered SA SA, SBS-TA or -60.0* 24-inch spans I I I center rows APP-TA TABLE iF: WOOD DECKS- NEW CONSTRUCTION oR REROOF. (TeAR-OFF) SYSTEM:TYPE F: PION -INSULATED; BONDED"ROOF COVER."' " System Roof Cover No MDP Deck prompr Joint Treatment Base Ply Ply Cap Ply N Ps W 5 Min. 15/32-inch plywood (Optional) ASTM D41 None SBS-SA (Optional) SBS-SA or SBS-SA, APP-SA, SBS-TA 90.0 at max. 24-inch spans APP-TA or APP-TA W 6 Min. 15 inc p ywoo (Optional) ASTM D41 ywood joints are covered with 4-inch wide strips of TriBuilt SA TriBuilt SA SBS Base (Optional) SBS-SA or ' 97 5 at max. 24-inch spans SBS Base, rolled into place to create continuous bond. APP-TA I or APR -TA Exterior Research and Design, LLC. d/b/a Trinity) ERD Evaluation Report A42970.10.12-R2 for FL36027-112 Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 8 of 26