HomeMy WebLinkAboutDRC Report1
PLANNING & DEVELOPMENT
SERVICES DEPARTMENT
Planning Division
DEVELOPMENT REVIEW COMMITTEE
(DRC)
Rezone & Major Adjustment to a Major Site Plan
Report
Southern Truss Companies
Property Owner/Applicant: Wheels Leasing, LLC
Agent for Applicant: Brad J. Currie, AICP
County Project Coordinator: Tahir Curry, Associate Planner
Assistant Director: Benjamin Balcer, AICP
Assistant Planning Manager: Kori Benton, AICP
County Project Number: RZ-4202126016 & SPMj-5202126036
Application Type(s): Rezone & Major Adjustment to a Major Site Plan
Site Address: 2590 Kings Highway, Fort Pierce, FL 34951
Parcel Identification Number(s): 1336-231-0001-000-2 & 1336-240-0000-000-3
Date Application Submitted: April 22, 2021 (Rezone), May 11, 2021 (Site Plan)
Staff Review Comment Due Date: May 10, 2021 (Rezone), May 24, 2021 (Site Plan)
DRC Meeting Date: May 27, 2021
DRC Report Date: TBD
Recommendation of the
Development Review Committee
Pursuant to Sections 11.02.04 11.02.07, 11.02.09, and other applicable sections of the St. Lucie County Land
Development Code (LDC), the Development Review Committee (DRC) has reviewed the subject applications and
have determined the proposed development plans do not comply with the Standards for Review outlined in the
LDC. The DRC has determined that in order for this application to be certified and move forward to the next step
in the development review process, the certification issues herein shall be resolved, and the applicant shall address
any comments or recommendations.
It is recommended that inquiries regarding contents of the report be coordinated by contacting the governmental
agency identified in the heading above each section of comments. The DRC will certify your application only upon
resolution of all certification issues, acceptance of the recommended conditions of approval and compliance with
all the LDC requirements.
The comments in this letter are based upon the application materials received and date stamped by the Planning and
Development Services Department on Thursday, April 22, 2021 (Rezone), and on Tuesday, May 11, 2021 (Site
Plan). Your application was reviewed by the DRC on Thursday, May 27, 2021.
A. Project Description
Engineering, Design, & Constriction., Inc. submitted a Rezone and a Major Adjustment to a Major Site Plan
application on behalf of Wheels Leasing, LLC. The proposed Rezone seeks to rezone a 29.24 (+/-) acre property
(Parcel ID: 1336-240-0000-000-3) located west side of Taylor Dairy Road, approximately 1,400 feet south of the
intersection of St. Lucie Boulevard and Taylor Dairy Road from the AG-1 (Agricultural – 1) to the IL (Industrial,
Light) Zoning District. The Major Adjustment to the Major Site Plan proposes to construct a 33,600-sq. ft.
manufacturing building, permit an existing 32 X 40 (1,280 sq. ft.) covered storage building, with associated
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
2
vehicular use area, landscaping, and on-site stormwater retention. The 29.24 (+/-) acre vacant parcel will a adjoined
with the existing Southern Truss Companies facilities located at 2590 Kings Highway, Fort Pierce, FL 34951.
The site is zoned IL (Industrial Light) (Parcel ID: 1336-231-0001-000-2) and AG-1 (Agricultural – 1) (Parcel ID:
1336-240-0000-000-3), with an TVC (Township, Villages and Countryside) Future Land Use designation. The site
is located within the Urban Service Boundary (USB).
B. Location and Site Information
Location: 2590 Kings Highway, Fort Pierce, FL 34951
Parcel Number(s): 1336-231-0001-000-2 & 1336-240-0000-000-3
Parcel Size: 40.86 acres – Total acreage of both combined parcels.
Future Land Use: TVC (Towns Villages and Countryside)
Zoning: IL (Industrial, Light) & AG-1 (Agricultural – 1)
Existing Use: 63,780-sf manufacturing building, 5,000-sf office, covered storage buildings, and
associated storage areas.
Proposed Use: Rezone from the AG-1 (Agricultural – 1) to the IL (Industrial, Light) Zoning District on a
29.24 (+/-) acre parcel, construct a 33,600-sq. ft. manufacturing building, permit an
existing 32 X 40 (1,280 sq. ft.) covered storage building, with associated vehicular use
area, landscaping, and on-site stormwater retention.
Utility: Water and wastewater services is not available to the site. Electric services is available on
Florida Power & Light (FP&L).
Fire/EMS Protection: Station # 4 – Airport is located approximately 3.5 miles northeast of the subject property.
Site Approval History:
01/13/2004 The Board of County Commissioners approved Resolution No. 04-004, granting a Major Site
Plan for a 63,750-sf manufacturing building and a 5,000-sf office building known as Atlantic
Truss.
07/28/2020 The Planning & Development Services Director approved PDS Order 2020-042, granting lot
split approval for the vacant 34.51-acre property (Parcel ID: 1336-240-0000-000-3) to the
east of Southern Truss’ current facility. The split intended to add 5.268-acres to their initial
expansion site to the north on St. Lucie Boulevard (Parcel ID: 1336-211-0000-000-3).
08/04/2020 The Board of County Commissioners approved Resolution No. 2020-156, granting an
Amendment to the Official Zoning Atlas from AG-1 (Agricultural – 1) to IL (Industrial,
Light) for the 5.268-acre portion of Parcel 1336-240-0000-000-3. This land was part of
Southern Truss’ Major Site Plan approved for 6509 St. Lucie Blvd via Resolution No. 2020-
213.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
3
2018 Aerial – To be replaced with GIS Map
Adjacent Land Uses:
The specific findings and review conclusions of each review agency related to this request are identified in Sections
D through N of this report.
Sec. Department Reviewer Phone Email
D Planning & Development
Tahir Curry
462-2515 CurryT@stlucieco.org
Planning Manager Linda Pendarvis 462-1562 PendarvisL@stlcuieco.org
Location Zoning District Future Land Use Existing Land Use
Subject Property TVC (Towns, Villages,
and Countryside)
IL (Industrial, Light)
AG-1 (Agricultural – 1)
Southern Truss Manufacturing
and Office Bldg.
Adjacent
Parcels
North TVC (Towns, Villages,
and Countryside)
IL (Industrial, Light) Southern Truss Undeveloped
Land
North TVC (Towns, Villages,
and Countryside)
AG-1 (Agricultural – 1) Undeveloped Agricultural Land
South TVC (Towns, Villages,
and Countryside)
AG-1 (Agricultural – 1) Undeveloped Agricultural Land
East Right-of-Way Right-of-Way Fort Pierce Farms Water
Control
West Right-of-Way Right-of-Way St. Lucie County
C. Review Assessment
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
4
E Business Navigator Thondra Lanese 462-2548 Laneset@stlucieco.org
F County Surveying Reviewer John Wilbon,
PLS 462-2587 WilbonJ@stlucieco.org
G Environmental Resources Aimee Cooper 462-2587 CooperA@stlucieco.org
H Public Works Grant Chambers 462-2741 ChambersG@stlucieco.org
I Property Acquisitions Vikki Mitchell 462-1711 MitchellV@stlucieco.org
J Ft. Pierce Utilities Authority DJ Savrda 466-1600
Ext. 3402 Savrda@FPUA.com
K St. Lucie County Fire District Lt. Wayne Boyer 621-3322 WBoyer@slcfd.org
L Building/Permitting Doug Harvey 462-2186 HarveyD@stlucieco.org
M St. Lucie County School District Marty Sanders 216-5755 Marvin.sanders@stlucieschools.org
N Water Management District Katherine
Caricchio, P.E.,
561-515
3909 Katherine.Caricchio@aecom.com
D. Determination of Compliance with Land Development Code and Comprehensive Plan Requirements –
Planning & Development Services Department
1. A Unity of Title has not been recorded to comply with PDS Order 2020-042 (Lot Split) and Resolution No.
2020-213 - Major Site Plan approval for Southern Truss at 6509 St. Lucie Blvd. The approved site plan
identified the 5.268-acre portion of Parcel 1336-240-0000-000-3 as a wet retention area to support Southern
Truss proposed manufacturing plant. The survey and site plan identifies the 5.268-acre, but the Property
Appraiser website does not identify the parcel. If a Unity of Title has been recorded, please submit the
documentation to the Planning Department.
The Lot Split approved by PDS Order 2020-042 has unresolved conditions of approval outlined below:
• Within 30 days of Lot Split approval, the applicant and/or property owners shall record two (2) warranty
deeds in the St. Lucie County Public Records, reflecting the legal descriptions in accordance with the
survey submitted by Culpepper & Terpening, Inc., referenced hereinabove.
• Within 30 days of Lot Split approval, the applicant and/or property owner(s) shall record a Unity of
Title, or similar legal instrument, combining the property described as ‘less & except parcel’ with Parcel
ID 1336-211-0000-000-3.
This Lot Split shall be vacated, if the Southern Truss Major Site Plan (Resolution No. 2020-
213) is abandoned but, prior to including Parcel 1336-240-0000-000-3 within a new Site Plan.
2. A Unity of Title is required for the 29.24-acre (Parcel ID: 1336-240-0000-000-3) and the 11.61-acre (Parcel
ID: 1336-240-0000-000-3) parcels for the proposed site modifications. Please remove the parcel line
between the subject parcels.
3. The labeling on the site plan appears to be overlapped or obscured. Please consider one (1) inch equals fifty
(50) feet scale to clearly depict the labeling on the site plan in accordance with the LDC Section
11.02.09.A.3.
4. Please remove conceptual plan and replace with Major Adjustment to a Major Site Plan.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
5
5. Please label all buildings dimensions and include on the building data table. The site plan does not include
the dimension of the covered storage building north of the existing 1,280 sq. ft. covered storage building.
6. Please recount the ground coverage of the total amount of all buildings. The calculation of 102,380 sq. ft.
appears to be incorrect.
7. The legend table on the site appears to have some deficiencies with the labeling of existing dirt (not
identified on the site plan), the proposed gravel area not included on the legend table, and the handicap
parking symbol not shown on the site plan.
8. Please include the drive aisle width for the proposed vehicular use area on the site plan.
9. Please include the distance between the proposed building from the existing manufacturing building and
stormwater retention pond.
10. The Major Site Plan granted through Resolution No. 04-004 indicates a 63,750 sq. ft. manufacturing
building. The proposed site plan adjustment shows a 63,780 sq. ft. manufacturing building. Please include
the appropriate building square footage.
Approved Atlantic Truss Company Major Site Plan
11. Loading Spaces: Please identify and provide striping for the loading space to serve the new manufacturing
building in accordance with the LDC Section 7.06.02. A.3.a.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
6
A loading zone is required for building C in accordance with the LDC Section 7.06.02. A.3.a. Off-street
loading space shall be provided and maintained for all commercial and industrial developments. Off-
street loading spaces shall be an area at grade level at least twelve (12) × fifty-five (55) feet long.
Size of Building Number of Spaces
0 to 24,999 square feet 1 (one space for each
building, if considered
separate buildings)
25,000 to 59,999 square feet 2 (two spaces, if
considering the
buildings as “one” for
such requirement)
60,000 to 119,999 square feet 3
120,000 to 199,999 square feet 4
200,000 to 299,999 square feet 5
For each additional ninety thousand (90,000) square feet over
three hundred thousand (300,000) square feet or major fraction
thereof, one (1) space.
12. The existing parking area located in front of the office building is not stripped. Please restripe the existing
parking area and identify the six (6) handicap parking spaces on the site plan in accordance with the LDC
Section 7.06.02.
13. The site plan does not identify the existing or proposed well and septic connection. Please depict whether
the project will utilize existing water and sewer facilities and if so a letter from the service provider stating
capacity will be available for the project in accordance with the LDC Section 11.02.09.A.1.i.
Please provide a response to all comments.
E. Determination of Compliance with Business Navigator – Planning & Development Services Department
St. Lucie County has a Business Navigator to provide businesses with assistance in navigating the internal and
external regulatory processes, and to act as a liaison between County staff, outside agencies, and other business
entities to provide high-quality customer service experience. If you need further assistance with regulatory
processes, please contact our Business Navigator, Thondra Lanese with the Planning & Development Services
Department at (772) 462-2548 or Laneset@stlucieco.org.
F. Determination of Compliance with County Survey Requirements – Engineering Division, Public Works
Department
Rezone Comments
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
7
All comments are based on the current Standards of Practice, established by the Board of Professional Surveyors
and Mappers, Chapter 5J-17.050 thru 5J-17.053 , Florida Administrative Code, pursuant to current Section 472.027,
Florida Statutes.
SURVEY:
1) Please add P.O.C. and P.O.B. to face of survey for Less and Except parcel.
2) Please correct Note 6 in the Surveyors Notes.
3) Bearings should be Grid Bearings.
4) Please add Reference Bearing to face of survey, not shown.
5) Please check Bearings and Distances on Less and Except parcel against description, some are not a match,
and some are not shown on Survey.
6) Drawing scale does not match the graphic scale shown, please check.
7) Please check closure, inverse between N.W. and N.E. corners yields Bearing difference from Survey.
8) Please check text descriptions for some linework, they seem to be confusing.
Please provide a response to all comments.
G. Determination of Compliance with Environmental Requirements – Environmental Resources
Department
Rezone Comments
Background
The Environmental Resources Department (ERD) is in receipt of the April 26, 2021 date-stamped submittal from
Planning and Development Services. The applicant is requesting approval to rezone 29.24 acres of a 34.51-acre
parcel from Agricultural-1 (AG-1) to Industrial, Light (IL), leaving 5.27 acres as AG-1. The applicant is proposing
an expansion of their existing manufacturing facility to the west of the subject parcel, also zoned IL, which is
required for the subject parcel to allow for this expansion. The 34.51-acre parcel is east of the existing Southern
Truss facility located at 2590 Kings Highway, west of Taylor Dairy Road, and north of the Fort Pierce Farms Water
Control District Canal in unincorporated St. Lucie County, Florida.
Findings
The rezone from AG-1 to IL is not anticipated to result in any adverse environmental impacts, as no construction
activities are proposed at this time. When site development activities are proposed, ERD will conduct further review
through the site plan review process. The site is characterized by abandoned agricultural lands with remnant
furrows/agricultural ditches and a possible wetland (according to the National Wetland Inventory), described as an
oak hammock on the submitted survey. When site development activities are proposed, a wetland jurisdictional
determination from South Florida Water Management District, as well as an Environmental Impact Report (EIR)
consistent with Land Development Code (LDC) 11.02.09.A.5 describing onsite habitats and listed species will be
required. Additionally, if any impacts are proposed to the wetland and/or its associated buffer, a Wetland Waiver
Application will be required.
Recommendation
ERD has no objections to the approval of this rezone application.
Please contact Aimee Cooper at 772-462-6440 for any questions regarding this application.
Major Adjustment to a Major a Site Plan Comments
Background
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
8
The Environmental Resources Department (ERD) is in receipt of the May 11, 2021 date-stamped submittal from
Planning and Development Services. The applicant is proposing an addition of a 33,600 SF manufacturing building
to an existing manufacturing site with accompanying drainage and infrastructure, and landscaping. There is an
existing 63,780 SF manufacturing building, a 5,000 SF office area and a 1,280 SF covered storage area onsite. The
40.86-acre site is located at 2590 Kings Highway, in unincorporated St. Lucie County, Florida.
Findings
The following comments are required to be addressed prior to approval:
1) Provide an updated tree survey identifying all existing native trees only, and provide if they will be
preserved, impacted, and/or relocated. Please include species and DBH for all native trees to be impacted
or preserved as mitigation or landscape credit. Provide a tree mitigation plan of how mitigation is being met,
keeping in mind tree mitigation is above and beyond landscaping requirements. Include the location(s) of
relocated trees/palms;
2) Identify all existing native trees which will remain and be counted towards landscape credit on all pages of
the landscape plan. Keep in mind these native trees being counted towards landscape credit may not be
counted towards tree mitigation and vise versa;
3) Update the scale on L-1 of the landscape plan to 1”
= 100’, and not 1” = 50’, as this scale is incorrect;
4) Ensure the trees proposed along the southern
perimeter shall not be planted where they could, at
mature height, conflict with overhead power lines
per LDC 7.09.03.E.2.l (see Figure 7-30)
5) The required minimum specifications for installed
hedge material used to screen adjacent properties
from interior vehicular use areas shall be 48” in
height per LDC 7.09.04.C. ERD Staff
acknowledges the note provided on the landscape
plan proposing the 24” hedge shall be allowed to
reach and be maintained to 48” per LDC
7.09.04.O; however, for administrative relief from
provisions of LDC 7.09.00 to be considered by the
Environmental Resources Director, a written
request for the specific relief shall be provided;
6) Provide the description for the proposed retention pond to be wet on all plans with the following
requirements:
a) Per LDC 6.02.03.F, provide a buffer zone of native upland (i.e., transitional) vegetation for the deepwater
habitats, including any proposed lakes/ponds, which may consist of preserved or planted vegetation
including canopy, understory, and ground cover of native species only. As a minimum, ten (10) SF of such
buffer shall be provided for each linear foot of deepwater habitat perimeter that lies adjacent to uplands;
and
b) Per Comprehensive Plan Policy 6.1.2.5 provide a vegetated and functional littoral zone to be established as
part of the surface water management system of upland water bodies occurring on development sites;
7) Provide documentation from the South Florida Water Management District (SFWMD) confirming the
presence/absence of onsite wetlands, as well as impacts to any other surface waters;
8) Within the provided Environmental Assessment (i.e., Environmental Impact Report [EIR]), address the
following items:
a) Address the inconsistencies with the size of the site, 30.66 acres in the EIR, 40.86 acres on the site plan and
other documents submitted
b) On page 6 of 6, remove mitigation requirements applicable to residential parcels, as this is non-residential
parcel zoned industrial light.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
9
Recommendation
Though not required by code, the Environmental Resources Department recommends incorporating low impact
development features, such as: landscaping dry detention areas with native vegetation; creating curb-cuts to direct
stormwater into landscape islands; utilizing rain barrels/cisterns to collect water for irrigation; preserving/planting
native vegetation in lieu of sod. For more information regarding low impact development, please visit
http://www.lid-stormwater.net/lid_techniques.htm.
Conditions of Approval
Subject to the resolution of the findings above, the following is a partial list of conditions of approval:
1) Prior to issuance of a Vegetation Removal Permit/Exemption, listed species surveys including but not limited
to the state-protected gopher tortoise and federally-protected northern crested caracara, may be required per
state and/or federal survey protocol. Should any listed species be found as a result of these updated surveys,
appropriate permits from state and federal agencies shall be required.
2) Prior to issuance of a Certificate of Occupancy, all Category I listed invasive species shall be eradicated from
the site.
Please contact Aimee Cooper at 772-462-6440 if you have any questions.
Please provide a response to all comments.
H. Determination of Compliance with Engineering & Water Quality Requirements – Public Works
Department
Rezone Comments
Deficiency Review:
1. Public Works has no comments regarding the rezone. Additional comments will be provided after review
of a site plan submittal.
2. For discussion regarding these comments, please contact myself at 772-462-2741 or
chambersg@stlucieco.org.
Major Adjustment to a Major a Site Plan Comments
Please provide a response to all comments.
I. Determination of Compliance with Property Acquisitions Requirements – Property Acquisition Division,
Legal Department
In reviewing Southern Truss – Major Adjustment to Major Site Plan, we have the following comment:
The parcel has the following frontage:
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
10
• Kings Highway a State owned and maintained right-of-way. Please contact the Department of
Transportation regarding future right-of-way needs.
• The East side of the property abuts Fort Pierce Farms Water Control District Canal No. 3.
• Taylor Dairy Road, a 50’ County owned and maintained unpaved right-of-way, abuts Canal No. 3 on the
East side of the property.
• The South side of the property abuts Fort Pierce Farms Water Control District Canal No. 1.
J. Determination of Compliance with Utilities Requirements – Fort Pierce Utilities Authority
Please find FPUA comments regarding this submission.
W/WW Eng: FPUA’s water and sewer services are not available to serve this location.
Electric & Gas Eng: Approved.
Electric - The property is not in the FPUA electric service area. Located in FPL service area.
Gas service is available from Kings Hwy. Please provide a copy of the gas riser diagram with the anticipated load
(if developer is interested in natural gas service). For more information and incentive available, please contact Ana
Johnson.
Please provide a response to all comments.
K. Determination of Compliance with Fire Requirements – St. Lucie County Fire District
1. No comments received at this time.
Please provide a response to all comments.
L. Determination of Compliance with Florida Building Code Requirements – Building/Permitting
Department
Plans Review has no comments at this time. When the project construction documents are closer to completion the
customer can contact St. Lucie Building Department and schedule a pre-construction meeting for a preliminary
review for the proposed structures before permit submittal.
M. Determination of Compliance with St. Lucie County School District – St. Lucie County School District
1. No comments received at this time.
N. Determination of Compliance with Water Management District – NSLRWCD