HomeMy WebLinkAboutSouthern Truss Final DRC Report1
PLANNING & DEVELOPMENT
SERVICES DEPARTMENT
Planning Division
DEVELOPMENT REVIEW COMMITTEE
(DRC) REPORT
Zoning Atlas Amendment & Major Adjustment to a
Major Site Plan
Southern Truss Companies
Property Owner/Applicant: Wheels Leasing, LLC
Agent for Applicant: Brad J. Currie, AICP
County Project Coordinator: Tahir Curry, Associate Planner
Assistant Director: Benjamin Balcer, AICP
Assistant Planning Manager: Kori Benton, AICP
County Project Number: RZ-4202126016 & SPMj-5202126036
Application Type(s): Zoning Atlas Amendment (Rezone) & Major
Adjustment to a Major Site Plan
Site Address: 2590 Kings Highway, Fort Pierce, FL 34951
Parcel Identification Number(s): 1336-231-0001-000-2 & 1336-240-0000-000-3
Date Application Submitted: April 22, 2021 (Rezone), May 11, 2021 (Site Plan)
DRC Meeting Date: May 27, 2021
DRC Report Date: June 11, 2021
Recommendation of the
Development Review Committee
Pursuant to Sections 11.02.04 11.02.07, 11.02.09, and other applicable sections of the St. Lucie County Land
Development Code (LDC), the Development Review Committee (DRC) has reviewed the subject applications and
have determined the proposed development plans do not comply with the Standards for Review outlined in the
LDC. The DRC has determined that in order for these applications to be certified and move forward to the next step
in the development review process, the certification issues herein shall be resolved, and the applicant shall address
any comments or recommendations.
It is recommended that inquiries regarding contents of the report be coordinated by contacting the governmental
agency identified in the heading above each section of comments. The DRC will certify your application only upon
resolution of all certification issues, acceptance of the recommended conditions of a pproval and compliance with
all the LDC requirements.
The comments in this letter are based upon the application materials received and date stamped by the Planning and
Development Services Department on Thursday, April 22, 2021 (Rezone), and on Tuesday, May 11, 2021 (Site
Plan). Your application was reviewed by the DRC on Thursday, May 27, 2021.
A. Project Description
Engineering, Design, & Constriction., Inc. submitted a Rezone and a Major Adjustment to a Major Site Plan
application on behalf of Wheels Leasing, LLC. The Zoning Atlas Amendment seeks to rezone a 29.24 (+/-) acre
property (Parcel ID: 1336-240-0000-000-3) located on the west side of Taylor Dairy Road, approximately 1,400
feet south of the intersection of St. Lucie Boulevard and Taylor Dairy Road from the AG-1 (Agricultural – 1) to the
IL (Industrial, Light) Zoning District. The Major Adjustment to the Major Site Plan to expand the existing Southern
Truss facility proposes to construct a 33,600-sq. ft. manufacturing building, permit an existing 32’ X 40’ (1,280 sq.
ft.) covered storage building, with associated vehicular use area, landscaping, and on-site stormwater retention. The
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
2
29.24 (+/-) acre vacant parcel will be adjoined with the existing Southern Truss Companies’ facilities located at
2590 Kings Highway, Fort Pierce, FL 34951.
The combined site is zoned IL (Industrial Light) (Parcel ID: 1336-231-0001-000-2) and AG-1 (Agricultural – 1)
(Parcel ID: 1336-240-0000-000-3), with a TVC (Township, Villages and Countryside) Future Land Use
designation. The site is located within the Urban Service Boundary (USB).
B. Location and Site Information
Location: 2590 Kings Highway, Fort Pierce, FL 34951
Parcel Number(s): 1336-231-0001-000-2 & 1336-240-0000-000-3
Parcel Size: 40.86 acres – Total acreage of both combined parcels.
Future Land Use: TVC (Towns Villages and Countryside)
Zoning: IL (Industrial, Light) & AG-1 (Agricultural – 1)
Existing Use: 63,780-sf manufacturing building, 5,000-sf office, covered storage buildings, and
associated storage areas.
Proposal: Rezone from the AG-1 (Agricultural – 1) to the IL (Industrial, Light) Zoning District on a
29.24 (+/-) acre parcel, to allow for the construction of a 33,600-sq. ft. manufacturing
building, permit an existing 32 X 40 (1,280 sq. ft.) covered storage building, with
associated vehicular use area, landscaping, and on-site stormwater retention.
Utility: Water and wastewater services are currently not available to the site. Electric services are
available through Florida Power & Light (FP&L).
Fire/EMS Protection: Station # 4 – Airport is located approximately 3.5 miles northeast of the subject property.
Site Approval History:
01/13/2004 The Board of County Commissioners approved Resolution No. 04-004, granting a Major Site
Plan for a 63,750-sf manufacturing building and a 5,000-sf office building known as Atlantic
Truss.
07/28/2020 The Planning & Development Services Director approved PDS Order 2020-042, granting lot
split approval for the vacant 34.51-acre property (Parcel ID: 1336-240-0000-000-3) to the
east of Southern Truss’ current facility. The split intended to add 5.268-acres to their initial
expansion site to the north on St. Lucie Boulevard (Parcel ID: 1336-211-0000-000-3).
08/04/2020 The Board of County Commissioners approved Resolution No. 2020-156, granting an
Amendment to the Official Zoning Atlas from AG-1 (Agricultural – 1) to IL (Industrial,
Light) for the 5.268-acre portion of Parcel 1336-240-0000-000-3. This land was part of the
Southern Truss’ Major Site Plan approved for 6509 St. Lucie Blvd via Resolution No. 2020-
213.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
3
2018 Aerial
Adjacent Land Uses:
Location Future Land Use Zoning District Existing Land Use
Subject Property TVC (Towns, Villages,
and Countryside)
IL (Industrial, Light)
AG-1 (Agricultural – 1)
Southern Truss Manufacturing
and Office Bldg. &
Undeveloped/Previous
Agricultural Land
Adjacent
Parcels
North
TVC (Towns, Villages,
and Countryside)
IL (Industrial, Light) Southern Truss Undeveloped
Land
AG-1 (Agricultural – 1) Undeveloped Agricultural Land
South TVC (Towns, Villages,
and Countryside)
AG-1 (Agricultural – 1) Undeveloped Agricultural Land
East Right-of-Way Right-of-Way Fort Pierce Farms Water
Control
West
Right-of-Way Right-of-Way St. Lucie County
TVC (Towns, Villages,
and Countryside)
AG-1 (Agricultural – 1) Undeveloped Agricultural Land
Boundary of Rezoning Petition
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
4
The specific findings and review conclusions of each review agency related to this request are identified in Sections
D through N of this report.
D. Determination of Compliance with Land Development Code and Comprehensive Plan Requirements –
Planning & Development Services Department
1. A Unity of Title has not been recorded to comply with PDS Order 2020-042 (Lot Split) and Resolution No.
2020-213 - Major Site Plan approval for Southern Truss at 6509 St. Lucie Blvd. The approved site plan
identified the 5.268-acre portion of Parcel 1336-240-0000-000-3 as a wet retention area to support Southern
Truss proposed manufacturing plant. The survey and site plan identifies the 5.268-acres, but the Property
Appraiser website does not recognize the parcel independently. If a Unity of Title has been recorded, please
submit the documentation to the Planning Department.
The Lot Split approved by PDS Order 2020-042 has unresolved conditions of approval outlined below:
• Within 30 days of Lot Split approval, the applicant and/or property owners shall record two (2) warranty
deeds in the St. Lucie County Public Records, reflecting the legal descriptions in accordance with the survey
submitted by Culpepper & Terpening, Inc., referenced hereinabove.
C. Review Assessment
Sec. Department Reviewer Phone Email
D
Planning &
Development
Tahir Curry
462-2515 CurryT@stlucieco.org
Planning Manager Linda
Pendarvis 462-1562 PendarvisL@stlcuieco.org
E Business Navigator Thondra
Lanese 462-2548 Laneset@stlucieco.org
F County Surveying
Reviewer
John Wilbon,
PLS 462-2587 WilbonJ@stlucieco.org
G Environmental
Resources Aimee Cooper 462-2587 CooperA@stlucieco.org
H Public Works Grant
Chambers 462-2741 ChambersG@stlucieco.org
I Property Acquisitions Vikki Mitchell 462-1711 MitchellV@stlucieco.org
J Ft. Pierce Utilities
Authority DJ Savrda 466-1600
Ext. 3402 Savrda@FPUA.com
K St. Lucie County Fire
District
Lt. Wayne
Boyer 621-3322 WBoyer@slcfd.org
L Building/Permitting Doug Harvey 462-2186 HarveyD@stlucieco.org
M Kimley Horn Alex
Memering 407 815 3572 alex.memering@kimley-
horn.com
N Florida Department of
Transportation
Caryn
Gardner-
Young, AICP
954-777-4652
Caryn.gardner-
young@dot.state.fl.us
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
5
• Within 30 days of Lot Split approval, the applicant and/or property owner(s) shall record a Unity of Title,
or similar legal instrument, combining the property described as ‘less & except parcel’ with Parcel ID 1336-
211-0000-000-3.
➢ This Lot Split shall be vacated, if the Southern Truss Major Site Plan (Resolution No. 2020-213)
is abandoned but, prior to including Parcel 1336-240-0000-000-3 within a new Site Plan.
2. A Unity of Title is required for the 29.24-acre (Parcel ID: 1336-240-0000-000-3) and the 11.61-acre (Parcel
ID: 1336-240-0000-000-3) parcels for the proposed site modifications. Please denote the parcel line to be
removed between the subject parcels.
3. The labeling on the site plan appears to be overlapped or obscured. Please consider one (1) inch equals fifty
(50) feet scale to clearly depict the labeling on the site plan in accordance with the LDC Section 11.02.09.A.3.
4. Please remove conceptual plan and replace with Major Adjustment to a Major Site Plan.
5. Please label all buildings dimensions and include on the building data table. The site plan does not include the
dimension of the covered storage building north of the existing 1,280 sq. ft. covered storage building.
6. Please recalculate the ground coverage of the total amount of all buildings. The 102,380 sq. ft. calculation
appears to be incorrect.
7. The legend table on the site appears to have some deficiencies with the labeling of existing dirt (not identified
on the site plan), the proposed gravel area not included on the legend table, and the handicap parking symbol
not shown on the site plan.
8. Please include the drive aisle width for the proposed vehicular use area on the site plan.
9. Please include the distance between the proposed building from the existing manufacturing building and
stormwater retention pond.
10. The Major Site Plan granted through Resolution No. 04-004 indicates a 63,750 sq. ft. manufacturing building.
The proposed site plan adjustment shows a 63,780 sq. ft. manufacturing building. Please affirm the building
area.
Approved Atlantic Truss Company Major Site Plan - Snapshot
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
6
11. Loading Spaces: Please identify and provide striping for a loading space to serve the new manufacturing
building in accordance with the LDC Section 7.06.02. A.3.a.
A loading zone is required for building C in accordance with the LDC Section 7.06.02. A.3.a. Off-street loading
space shall be provided and maintained for all commercial and industrial developments. Off-street loading
spaces shall be an area at grade level at least twelve (12) × fifty-five (55) feet long.
Size of Building Number of Spaces
0 to 24,999 square feet 1 (one space for each building, if considered
separate buildings)
25,000 to 59,999 square feet 2 (two spaces, if considering the buildings as
“one” for such requirement)
60,000 to 119,999 square feet 3
120,000 to 199,999 square feet 4
200,000 to 299,999 square feet 5
For each additional ninety thousand (90,000) square feet over three hundred thousand
(300,000) square feet or major fraction thereof, one (1) space.
12. The proposed loading zone in front of the 63,780 sq. ft. manufacturing building is 12 X 45. Off-street loading
spaces shall be an area at grade level at least twelve (12) × fifty-five (55) feet long in accordance with the LDC
Section 7.06.02.
13. The existing parking area located in front of the office building is not stripped. Please restripe the existing
parking area and identify the six (6) handicap parking spaces on the site plan in accordance with the LDC
Section 7.06.02 Performance Standards.
14. The site plan does not identify the existing or proposed water or wastewater connection. Please depict whether
the project will utilize existing water and sewer facilities and if so a letter from the service provider stating
capacity will be available for the project in accordance with the LDC Section 11.02.09.A.1.i.
In accordance with Comprehensive Plan Policy 1.1.13.3 - In addition to any other general standard for change
in zoning as may be described in the County's Land Development Code, new Light Industrial property(s)should
have available to it central water services necessary for both domestic and fire protection purposes and:.
15. Fort Pierce Utilities Authority (FPUA) has plans to extend water and sewer services along Kings Highway
contingent upon FDOT’s scheduling for roadway expansion/improvements. Please denote a future connection
to water/wastewater services on the site plan and provide a letter stating Southern Truss will connect to
water/wastewater services when made available through FPUA.
16. The site plan denotes a gravel truck turnaround area. Gravel is not a permitted all-weather surface material
meeting the SLC Public Works Department's requirements. The proposed turnaround access and vehicular use
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
7
shall be constructed with an all-weather surface material for motorized vehicles in accordance with the LDC
Section 7.03.02.B.3.a.
17. There is a safety concern over pedestrian circulation, including its interrelationship with the vehicular/truck
circulation system. The site plan should show a pedestrian route to safely connect to the office and manufacture
buildings safely without interfering with the vehicular/truck circulation system.
18. The Florida Department of Transportation has plans to expand the Kings Highway roadway network, including
sidewalks and a bicycle lane. It is recommended that the site plan depict a bike rack and sidewalk connectivity
from the office building to the right-of-way for the future connectivity.
Advisory Note:
The Unity of Titles shall be addressed prior to the Board of County Commissioners for final action. The warranty
deeds/Unity of Tiles shall address the conditions outlined in PDS Order 2020-042 and combing the 29.24 (+/-) acre
vacant parcel with Southern Truss Companies’ facilities located at 2590 Kings Highway, Fort Pierce, FL 34951.
Please provide a response to all comments.
E. Determination of Compliance with Business Navigator – Planning & Development Services Department
St. Lucie County has a Business Navigator to provide businesses with assistance in navigating the internal and
external regulatory processes, and to act as a liaison between County staff, outside agencies, and other business
entities to provide high-quality customer service experience. If you need further assistance with re gulatory
processes, please contact our Business Navigator, Thondra Lanese with the Planning & Development Services
Department at (772) 462-2548 or Laneset@stlucieco.org.
F. Determination of Compliance with County Survey Requirements – Engineering Division, Public Works
Department
1. Rezone Survey Comments (Revised Survey Resubmitted on June 9, 2021, - Review Complete)
2. Major Site Plan Adjustment Survey Comments Pending Review.
Please provide a response to all comments.
G. Determination of Compliance with Environmental Requirements – Environmental Resources
Department
Rezone Comments
Background
The Environmental Resources Department (ERD) is in receipt of the April 26, 2021 date -stamped submittal from
Planning and Development Services. The applicant is requesting approval to rezone 29.24 acres of a 34.51-acre
parcel from Agricultural-1 (AG-1) to Industrial, Light (IL), leaving 5.27 acres as AG-1. The applicant is proposing
an expansion of their existing manufacturing facility to the west of the subject parcel, also zoned IL, which is
required for the subject parcel to allow for this expansion. The 34.51-acre parcel is east of the existing Southern
Truss facility located at 2590 Kings Highway, west of Taylor Dairy Road, and north of the Fort Pierce Farms Water
Control District Canal in unincorporated St. Lucie County, Florida.
Findings
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
8
The rezone from AG-1 to IL is not anticipated to result in any adverse environmental impacts, as no construction
activities are proposed at this time. When site development activities are proposed, ERD will conduct further review
through the site plan review process. The site is characterized by abandoned agricultural lands with remnant
furrows/agricultural ditches and a possible wetland (according to the National Wetland Inventory), described as an
oak hammock on the submitted survey. When site development activities are proposed, a wetland jurisdictional
determination from South Florida Water Management District, as well as an Environmental Impact Report (EIR)
consistent with Land Development Code (LDC) 11.02.09.A.5 describing onsite habitats and listed species will be
required. Additionally, if any impacts are proposed to the wetland and/or its associated buffer, a Wetland Waiver
Application will be required.
Recommendation
ERD has no objections to the approval of this rezone application.
Please contact Aimee Cooper at 772-462-6440 for any questions regarding this application.
Major Adjustment to a Major a Site Plan Comments
Background
The Environmental Resources Department (ERD) is in receipt of the May 11, 2021 date -stamped submittal from
Planning and Development Services. The applicant is proposing an addition of a 33,600 SF manufacturing building
to an existing manufacturing site with accompanying drainage and infrastructure, and landscaping. There is an
existing 63,780 SF manufacturing building, a 5,000 SF office area and a 1,280 SF covered storage area onsite. The
40.86-acre site is located at 2590 Kings Highway, in unincorporated St. Lucie County, Florida.
Findings
The following comments are required to be addressed prior to approval:
1) Provide an updated tree survey identifying all existing native trees only, and provide if they will be
preserved, impacted, and/or relocated. Please include species and DBH for all native trees to be impacted
or preserved as mitigation or landscape credit. Provide a tree mitigation plan of how mitigation is being met,
keeping in mind tree mitigation is above and beyond landscaping requirements. Include the location(s) of
relocated trees/palms;
2) Identify all existing native trees which will remain and be counted towards landscape credit on all pages of
the landscape plan. Keep in mind these native trees being counted towards landscape credit may not be
counted towards tree mitigation and vise versa;
3) Update the scale on L-1 of the landscape plan to 1”
= 100’, and not 1” = 50’, as this scale is incorrect;
4) Ensure the trees proposed along the southern
perimeter shall not be planted where they could, at
mature height, conflict with overhead power lines
per LDC 7.09.03.E.2.l (see Figure 7-30)
5) The required minimum specifications for installed
hedge material used to screen adjacent properties
from interior vehicular use areas shall be 48” in
height per LDC 7.09.04.C. ERD Staff
acknowledges the note provided on the landscape
plan proposing the 24” hedge shall be allowed to
reach and be maintained to 48” per LDC
7.09.04.O; however, for administrative relief from
provisions of LDC 7.09.00 to be considered by the
Environmental Resources Director, a written
request for the specific relief shall be provided;
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
9
6) Provide the description for the proposed retention pond to be wet on all plans with the following
requirements:
a) Per LDC 6.02.03.F, provide a buffer zone of native upland (i.e., transitional) vegetation for the deepwater
habitats, including any proposed lakes/ponds, which may consist of preserved or planted vegetation
including canopy, understory, and ground cover of native species only. As a minimum, ten (10) SF of such
buffer shall be provided for each linear foot of deepwater habitat perimeter that lies adjacent to uplands;
and
b) Per Comprehensive Plan Policy 6.1.2.5 provide a vegetated and functional littoral zone to be established as
part of the surface water management system of upland water bodies occurring on development sites;
7) Provide documentation from the South Florida Water Management District (SFWMD) confirming the
presence/absence of onsite wetlands, as well as impacts to any other surface waters;
8) Within the provided Environmental Assessment (i.e., Environmental Impact Report [EIR]), address the
following items:
a) Address the inconsistencies with the size of the site, 30.66 acres in the EIR, 40.86 acres on the site plan and
other documents submitted
b) On page 6 of 6, remove mitigation requirements applicable to residential parcels, as this is non-residential
parcel zoned industrial light.
Recommendation
Though not required by code, the Environmental Resources Department recommends incorporating low impact
development features, such as: landscaping dry detention areas with native vegetation; creating curb -cuts to direct
stormwater into landscape islands; utilizing rain barrels/cisterns to collect water for irrigation; preserving/planting
native vegetation in lieu of sod. For more information regarding low impact development, please visit
http://www.lid-stormwater.net/lid_techniques.htm.
Conditions of Approval
Subject to the resolution of the findings above, the following is a partial list of conditions of approval:
1) Prior to issuance of a Vegetation Removal Permit/Exemption, listed species surveys including but not limited
to the state-protected gopher tortoise and federally-protected northern crested caracara, may be required per
state and/or federal survey protocol. Should any listed species be found as a result of these updated surveys,
appropriate permits from state and federal agencies shall be required.
2) Prior to issuance of a Certificate of Occupancy, all Category I listed invasive species shall be eradicated from
the site.
Please contact Aimee Cooper at 772-462-6440 if you have any questions.
Please provide a response to all comments.
H. Determination of Compliance with Engineering & Water Quality Requirements – Public Works
Department
Rezone Comments
Deficiency Review:
1. Public Works has no comments regarding the rezone. Additional comments will be provided after review
of a site plan submittal.
2. For discussion regarding these comments, please contact myself at 772-462-2741 or
chambersg@stlucieco.org.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
10
Major Adjustment to a Major a Site Plan Comments
1. The turnaround area will be required to be paved.
2. Please clarify how the trusses will be unloaded and placed in the storage area.
3. Identify on the Site Plan where the stormwater outfall will be located.
4. Provide a truck circulation plan depicting how the dumpster collection, fire department, and delivery trucks
will safely maneuver onsite.
5. Dimension the drive aisles and radius of returns on all curbed islands.
6. Provide typical sections for the proposed gravel laydown areas.
7. The parking striping shall be a minimum of 6 inches.
8. A Site Development Permit is required prior to performing site improvement activities. Subsequent to DRC
approval, the applicant may submit the required documents to Grant Chambers, P.E. in the Engineering
Division. Documents are to include, a Site Development Permit application, two sets of plans, one copy of
the stormwater report and other appropriate information. The Site Development Permit application can be
found on the County’s website under the Public Works Department link. In accordance with the permit and
Land Development Regulations, the applicant shall retain the EOR for site inspections and final
certification.
9. For discussion regarding these comments, please contact myself at 772-462-2741 or
chambersg@stlucieco.org.
Please provide a response to all comments.
I. Determination of Compliance with Property Acquisitions Requirements – Property Acquisition Division,
Legal Department
In reviewing Southern Truss – Major Adjustment to Major Site Plan, we have the following comment:
The parcel has the following frontage:
• Kings Highway a State owned and maintained right-of-way. Please contact the Department of
Transportation regarding future right-of-way needs.
• The East side of the property abuts Fort Pierce Farms Water Control District Canal No. 3.
• Taylor Dairy Road, a 50’ County owned and maintained unpaved right-of-way, abuts Canal No. 3 on the
East side of the property.
• The South side of the property abuts Fort Pierce Farms Water Control District Canal No. 1.
J. Determination of Compliance with Utilities Requirements – Fort Pierce Utilities Authority
Please find FPUA comments regarding this submission.
Electric & Gas Eng: Approved.
Electric - The property is not in the FPUA electric service area. Located in FPL service area.
Gas service is available from Kings Hwy. Please provide a copy of the gas riser diagram with the anticipated load
(if developer is interested in natural gas service).
The plan ultimately is for FPUA water/wastewater to extend north on Kings Highway. This concept and plan is
entirely contingent upon DOT’s scheduling for roadway expansion/improvements.
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
11
At this time however, water/Wastewater services are not available to the site in question.
Once services are available, the customer/developer is encouraged to submit plans for review with sizes indicated
based upon expected use. Estimates and invoicing will be generated once this takes place as per FPUA requirements.
(see Developers Responsibilities https://fpua.com/wp-content/uploads/2020/10/Developers_Responsibilities.pdf ).
For more information and incentive available, please contact Ana Johnson AT 772.466.1600 Ext. 3012.
Please provide a response to all comments.
K. Determination of Compliance with Fire Requirements – St. Lucie County Fire District
1. Please submit a completed application for Development/Site Plan Review (St. Lucie County Fire District
Development & Site Plan Review Application). This form is available on-line at https://www.slcfd.com
2. Fire District review fees are due at the time of submittal. An abbreviated fee schedule is included on the
application form.
3. Please provide an electronic copy of the Site Plan (pdf format).
4. A separate review and permit is required for Underground Fire Mains connected to standpipes or sprinkler
systems.
5. Fire hydrants (shall be) are provided for buildings other than detached one-and-two-family dwellings IAW
both of the following 1) The maximum distance to a fire hydrant from the closest point in the building shall
not exceed 400 feet. 2) The maximum distance between fire hydrants shall not exceed 500 feet. NFPA
1:18.5.3. Please provide fire flow calculations for hydrants.
6. An approved water supply capable of supplying the required fire flow for fire protection (shall be) is identified
to all premises upon which facilities, buildings, or portions of buildings which are to be constructed or moved
into the jurisdiction. The approved water supply shall be in accordance with NFPA 1:18.4. See “Needed
NFPA Fire Flow Calculator Spreadsheet”.
7. Per the St. Lucie County Fire District Fire Prevention Code Resolution 647-17. At Least 13 feet 6 inches
nominal vertical clearance shall be provided and maintained over the full width of all means of access.
Including, but not limited to trees, canopies, etc.
8. Fire department connections shall be located on the street side of buildings and shall be located and
arranged so that hose lines can be readily attached to the inlets without interference from any nearby
objects, including buildings, fences, landscaping, or other fire department connections. The locations of
connections shall be based upon the access requirement s of the fire department.
9. The distance allowed between the fire department connection and a fire hydrant shall be no more than one
hundred fifty (150) feet as a vehicle travels.
10. FD access roads (shall be) are provided such that any portion of an unsprinklered facility or exterior wall is
located not more than 150’ from FD access roads as measured by an approved route around the exterior of
the building or facility. (450’ for NFPA 13, 13D, 12R sprinklered protected buildings).
11. The Fire District reserves the right for future comments at the site plan & building construction phase.
12. Per NFPA 1114 Chapter 9, Section 1.3. Prior to the final occupancy of any building, the permitted water
supply for fire protection, including fire hydrants and fire suppression systems, shall be installed, tested, and
acceptable to the AHJ (SLCFD).
13. Be advised: Dimensions of largest vehicle are as follows: 38 tons or 77k lbs, 47.5 ft. total length, 21.5 ft.
wheel base, 10.5 ft. total width, 41.5 degree turning radius.
14. Two-Way Radio Enhancement Systems/BDAS shall be installed, inspected and operationally tested in
accordance with the manufacturer’s published requirements, by the local fire department, and comply with
the most current edition of the Florida Fire Prevention Code and its incorporated standards and codes. Pre -
Project Name: Southern Truss Companies
Project File No.: RZ-4202126016 & SPMj-5202126036
12
surveys of radio signal strength shall be submitted to the Fire Marshal in the form of heat signature mapping
or a certification document of radio signal strength provided by a licensed engineer.
15. Minimum Size of Water Mains
a. The minimum size of water mains for supplying water for firefighting purposes shall be six (6 ) inches. b. The
minimum size of water mains supplying hydrants on a dead end main shall be eight (8) inches. c. The maximum
number of hydrants located on a dead end main shall be one (1). d. Grid or Tee systems shall be supplied by a
minimum of an eight (8) inch looped main. Exceptions may be granted based on the capacity of the water
distribution system but in no case shall the main size be less than six (6) inches. e. The minimum size water main(s)
shall be determined by the needed fire flow as established by the Fire Marshal and based on the current Insurance
Service Office (ISO) requirements.
Please provide a response to all comments.
L. Determination of Compliance with Florida Building Code Requirements – Building/Permitting
Department
Plans Review has no comments at this time. When the project construction documents are closer to completion the
customer can contact St. Lucie Building Department and schedule a pre-construction meeting for a preliminary
review for the proposed structures before permit submittal.
M. Determination of Compliance with Traffic Impact Report – Kimley Horn
Kimley-Horn has reviewed the traffic impact analysis (dated April 20, 2021) prepared by Engineering Design &
Construction, Inc. related to the above-mentioned project. Please find our review comments below pertaining to the
development’s impacts and study needs for adjacent transportation facilities.
1. Please provide an anticipated buildout year for the development.
2. Please calculate a historical growth rate based upon study area roadway historical AADT volumes.
3. Please include future background (without project) traffic conditions within the roadway analysis table. The
future background (without project) traffic conditions is calculated by applying the historical growth rate
(Comment #2) based upon the anticipated buildout year to existing peak hour peak directional volumes.
4. Please calculate total peak hour volumes within the roadway analysis table by summing future background
(without project) traffic volumes and project traffic volumes.
5. Please confirm that peak hour project volumes shown within the roadway analysis table reflect directional
project volumes.
6. Kings Highway is currently under construction to widen from a 2-lane facility to a 4-lane facility. Please
include this capacity improvement within the roadway analysis table.
7. Please provide an intersection analysis for the existing full access driveway on Kings Highway.
8. Please provide a turn lane analysis to determine the need of ingress turn lanes at the existing full access
driveway.
9. Please confirm whether northbound traffic volumes along Kings Highway between Angle Road and the
existing project driveway are presented correctly within Exhibit 3.
N. Determination of Compliance with Florida Department of Transportation – FDOT
The only comment I have is that an access permit will be necessary to any State roadways. Please have the applicant
coordinate with FDOT to review the proposed development’s access to Kings Highway prior to site plan
approval. They may contact Dalila Fernandez by email at: D4AccessManagement@dot.state.fl.us or can complete
an online request for an access pre-application meeting by filling out the District 4 Access Management Pre-
Application Request Form. Once scheduled, the Village is encouraged to attend the pre-app meeting via
teleconference.