Loading...
HomeMy WebLinkAboutPLAN01. Flences must comply with City of Port St. Lucie code of ordinance 158.216. Fence must not extend beyond the front outside comer of the building on either side. 2.Accessory uses or structures/sheds shall be located a minimum of 10'from the rear property lines. 3. The minimum setback from the side property line shall be those set forth in the applicable zoning district. See city code of ordinance 158.217 &Chapter 158 Article V. Mapproduced by the Ciy of Port St Lucie Buiding DepEAment Fence and Shed Diagram Mapper Websdeon: 10/2512018 I RECEIVED ' NOVty 2018 ST, Lucie CounPe W i THESE PLANS AND ALL PROPOSED W QJ ',;', l.i"iN ALED FASTENERS OR ATTACHMENTS ARE SUBJEd TO ANY CORRECTIONS ARE THE RESPONSIBILITY OF THE REQUIRED 5� FIELD INSPECTORS TKAT CONTRACTOR OF RECORD [ AY BE NECESSARY IN ORDER TO C©MPLYWI` F1, ALL APPLICABLE CODES. I I ST, LUCIE COUN BUILDING DI ION REVIE ED FOR CO PLIA REVIEWE BY DATE f I to PLANS AND PE MIT MUST BE KEPT O JOB OR NO INS. E.,TION WI L BE MADE } 3 �• 1t�� • ti.� M W1 �l IVED I O V 0 9 2018 ST. Lucie County, Permitting 3�p PER BUI Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT - CONSTRUCTION SOIL TREATMENT IT #: JOB ADDRESS: )ER/CONTRACTOR: C,OrNTROL CONTRACTOR: CONTROL LICENSE #: We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Percentage of solution: Date of Treatment: Footing 1st Treatment Re -Treat - Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: Total gallons used: Time of Treatment: Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection Signature of Exterminator Date Note:• There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsite posting board shalli be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, pro viding a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on thelelectrical panel box cover, listing all the treatments and dates of applications. 7/24/2014 49 N