Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPLAN01. Flences must comply with City of Port St. Lucie code of ordinance 158.216. Fence must not extend beyond the front outside comer of the
building on either side.
2.Accessory uses or structures/sheds shall be located a minimum of 10'from the rear property lines.
3. The minimum setback from the side property line shall be those set forth in the applicable zoning district. See city code of ordinance
158.217 &Chapter 158 Article V. Mapproduced by the Ciy of Port St Lucie Buiding DepEAment Fence and Shed Diagram Mapper Websdeon: 10/2512018
I RECEIVED '
NOVty 2018
ST, Lucie CounPe
W
i
THESE PLANS AND ALL PROPOSED W QJ ',;', l.i"iN ALED FASTENERS OR ATTACHMENTS
ARE SUBJEd TO ANY CORRECTIONS ARE THE RESPONSIBILITY OF THE
REQUIRED 5� FIELD INSPECTORS TKAT CONTRACTOR OF RECORD
[ AY BE NECESSARY IN ORDER TO
C©MPLYWI` F1, ALL APPLICABLE CODES.
I
I
ST, LUCIE COUN
BUILDING DI ION
REVIE ED
FOR CO PLIA
REVIEWE BY
DATE f I to
PLANS AND PE MIT
MUST BE KEPT O JOB OR
NO INS. E.,TION WI L BE MADE
} 3 �• 1t�� • ti.�
M
W1
�l
IVED
I O V 0 9 2018
ST. Lucie County, Permitting
3�p
PER
BUI
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
- CONSTRUCTION SOIL TREATMENT
IT #: JOB ADDRESS:
)ER/CONTRACTOR:
C,OrNTROL CONTRACTOR:
CONTROL LICENSE #:
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated:
Percentage of solution:
Date of Treatment:
Footing
1st Treatment
Re -Treat -
Driveway
1st Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used:
Total gallons used:
Time of Treatment:
Slab
1st Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
Perimeter for Final Inspection
Signature of Exterminator Date
Note:• There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsite posting board
shalli be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
pro viding a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of
protective treatment If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
thelelectrical panel box cover, listing all the treatments and dates of applications.
7/24/2014
49
N