HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATE18l I o255
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave -
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
MMRTRUCTION SOIL- TREATMENT
PERMIT #: L C- I8 1- 02s5 JOB ADDRESS:
BUILDER/CONTRACTOR: D4u10 l d
PEST CONTROL CONTRACTOR: C QAS4/
PEST CONTROL LICENSE #: 801+e
U
SCANNED
BY
St Lucie County
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean tel in accordance with the standards of the National Pest Control Association.
Square feet if area treated: J U Z Chemicals used: Lt4 14,1-
Percentage of solution:._ d
Date of Treatment:
Total gallons used: 9,�9
Time of Treatment: 2 pD1 1
Footing Slab
14 Treatment A1't Treatment
Re -Treat Re Treat
Driveways —Pools
1�'t Treatment V Treatment
Re -Treat Re -Treat
Other Perim er for Final Inspection
1 Treatment
Re -Treat /�
Si tur Exterminator
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy, for the person the permit is issued to and another copy for the building permit files The Treatment
CerbAcate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of
protective treatment if the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CC,,a permanent Sticker to be placed on
the electrical (panel box cover, Listing all the treatments and dates of applications.
Revised 7/24/2014