Loading...
HomeMy WebLinkAboutPRODUCT APPROVAL - SKYLIGHTFlorida Building Code Online lfJfdda'1M�A l . ec15 dome 1 Log in I user negiscranon 1 noc iopics i Submit Surcharge i Stats &Facts Publications I Contact Us BCIS Site Map ! Links I Search Florida Product Approval r :"�`r USER: Public User RECEIVE© Product Approval Menu > Product or Application Search > Application List > Application Detail M. JAN 2 8 G019 FL # FL20881-R3 Application Type Revision W. hum poafit-vf P@Pf iginq � Code Version 2017 --•-- Application Status Approved *Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. I , Comments �71�/�11VVIVGA� SCANNED Archived St Lucie County Product Manufacturer Sun-Tek Mfg Address/Phone/Email 10303 General Dr Orlando, FL 32824 (407)859-2117 jfeudner@sun-tek.com Authorized Signature James Feudner engineering@sun-tek.com -. Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Sky Lights Subcategory Skylight Compliance Method Certification Mark or Listing Certification Agency Validated By Referenced Standard and Year (of Standard) 13. 0 I Equivalence of Product Standards Certified By National Accreditation & Management Institute National Accreditation & Management Institute Standard Year TAS201 1994 TAS202 1994 TAS203 1994 I I Product Approval Method Method 1 Option A I Date Submitted 12/14/2017 Date Validated 12/18/2017 Date Pending FBC Approval https://www.floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtbxPgODTr%2bX3SmdxkQzlgYPJMdkaHZk4RlKzQchYcKKA%3d%3d 1/2 1/25/2019 Florida Building Code OnliF,,,, Date Approved 12/22/2017 } S&Hlimary of Products FL # Model, Number or Name Description 20881.1 ICMGII ICMGII (Impact) Aluminum Skylight i Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: Yes Design Pressure: +60/-60 Other: Certification Agency Certificate FL20881 R3 C CAC ICMGII TAS cert.pdf Quality Assurance Contract Expiration Date 03/31/2020 Installation Instructions FL20881 R3 II ICMGII installation inst - Approved 6.21.16 JW.pdf Verified By: James D Wells Jr. P.E. P.E. No. 53616 y ndependent Third Party: Yes Evaluation Reports FL20881 R3 AE 2017FBC ICMGII report.pdf Created by Independent Third Party: Yes 20881.2 IFGC IFGC 4949 Flush Mounted Wood Skylight Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: Yes Design Pressure: +60/-60 Other: Certification Agency Certificate FL20881 R3 C CAC IFGC TAS cert.pdf Quality Assurance Contract Expiration Date 03/31/2020 Installation Instructions FL20881 R3 II 1283 IF - IFGC Install Inst - Final - Approved 7.26.16 JW.pdf Verified By: James D. Wells Jr. P.E. No. 53616 Created by Independent Third Party: Yes Evaluation Reports FL20881 R3 AE 2017FBC IFGC report.pdf Created by Independent Third Party: Yes Back Nett¢ Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer. Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one.,The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here . Product Approval Accepts: e0heck Credit Card Safe I https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgtbxPgODTr%2bX3SmdxkQzlgYPJMdkaHZk4R1KzQchYcKKA%3d%3d 2/2 NOTICE ( "`,PRODUCT CERTIFIC '-TION CERTIFICATION NO: NI013292 DATE: 07/06/2016 CERTIFICATION PROGRAM: Structural COMPANY: Sun-Tek CODE: 225-1 To verify that the "Notice of Product Certification" is valid, please visit www.NAMICertification.com to assure that the product is active and currently listed. This certification represents product conformity to the applicable specification and that certification criteria has been satisfied. A NAMI approved certification label must be applied to the product to claim certification status. Please review and advise NAMI if any corrections are required to this document. II COMPANY NAME AND ADDRESS I PRODUCT DESCRIPTION Sun-Tek Manufacturing, Inc. 10303 General Drive Orlando, FL 32824 Series "ICMG II (Impact)" Aluminum Skylight Configuration: O Glazing: IG-3/16" Tempered Glass/l/8" Annealed Glass/0.090" Kuraray Butacite PVB Interlayer/l/8" Annealed Glass Frame: W-1283mm(50.5") H-1283mm(50.5") DLO: W-1162mm(45.75") H-1162mm(45.75") SPECIFICATION PRODUCT RATING TAS 201/202/203-94 Design Pressure: 2873 Pa (60 psf) Water Penetration Resistance Test Pressure: 431 Pa (9.00 psf) Large Missile Impact Rated Product Tested By: (Report No: lxpiration Date: National Certified Testing Laboratories NCTL-210-4017-02A March 31, 2020 �dmmistrator s Signature: NATIONAL ACCREDITATION AND MANAGEMENT INSTITUTE, INC. 4794 George Washington Memorial Highway Hayes, VA 23072 Tel: (804) 684-5124 Fax: (804) 684-5122 This item has been electronically signed and sealed by James D. Wells, Jr., P.E. on 6/21/2016 using a Digital Signature. -Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. James D Wells Jr 1a1y11�11j,,,�� I attest to the \°°"°0'' accuracy and :a o. 3616 �? integrity of m"I-O this document 11111111\\\\\ 2016.06.21 14:25:51 -04'00' Engineer of Record: James D. Wells, Jr., P.E. CLEANING YOUR SKYLIGHT: STS 1000 Caulk -Use only between decking and underside of skylight flange on Use a mild soap and water or glass cleaners only. Fresh paint splashes, glazing Glass Series. Not necessary on CMG2 compound, etc. may be removed by rubbing lightly with a soft cloth or cotton ball soaked in mineral spirits. ACCESSORIES: Step Flash Kit- Pre -formed, precut flashing eliminates need for flashing on self -built Skylight Shades - a variety of sizes are available and are easily installed. Contact your curb. Use with Curb Mount models. Note: Step flash kit designed for use with curbs building materials dealer or Sun Tek Manufacturing for details. constructed of 2 x 6's only. LIGHT TUNNEL INSTALLATION INSTRUCTIONS For homes with an attic, it is necessary to build a tunnel between skylights and ceiling. The tunnel walls may be straight, or flared for extra light and architectural appeal. It's very easy to increase the tunnel size along the length of the ceiling joists. As long as no roof -supporting members are cut, no special framing is needed. While it is possible to flare the tunnel in all directions, if support members are cut, special framing will be required for structural support. In this case you must consult a qualified building professional to. insure proper and safe results. 1 After roof and ceiling openings have been framed, measure distance (at each corner of roof opening) between rafter/truss and ceiling joist. 2 Using these four measurements, cut 2 x 4 lumber for vertical support members (two per corner). 3 In each corner, nail vertical support members into place at right angles to each other. 4 Measure, cut, and nail tunnel walls into place. Suggestions for lining tunnel: - use drywall, tape corners, and paint white using regular or texture paint. (Texture paint alone will hide and fill untaped joints, but in time, cracks may appear in corners.) i - use prefinished paneling with molding in corners. - line the tunnel with cedar, pine, or a wood to coordinate with your decor. - for special effects, try painting the tunnel a striking accent color, or use mirrors or wallpaper on tunnel walls. 5 Caulk the slight gap between the tunnel walls and skylight base. 6 Finish off tunnel at ceiling with molding, or blend edges into ceiling with texture paint. 7 Be sure to wrap the exterior of the tunnel with insulation for energy savings. SIZE INFORMATION Size Code Roof Opening Finished Opening ('h"Drywall Dimension CurbOutsic Dimension 1414 11Yz"x 11Yz" 10Y2"x IOY2" 14Yz"x 147E 1422 111'/i x 19'/z" 101/2"x 18'/z" 141/2"x 22Y: 1430 111%'x 27'/i 16Wx 26'A" 14%"x 30Y 1446 11'/z'x431/2" 101/2"x421/2" 14," M ITT'. -, '-M 172S 14Wx221/2' 13%'x211W 1733 141/z"x 301/2" 131/2"x 291/2" 171h"x 33'/: 1749 14Y27 x 461/? 13%"x 4SW 1 T/s"x 49Y: 2222 191/z" x 191/2" 181h' x 181/2" 221/2"x 221/. 191/2'x 27Y' 18Y2"x 26%7 221/i x 301/: 191/z"x 431/2" 181/z" x 421/z" 221/2"x 461/. 22Yx22Y2' 21Yx2VV 251/ix25Y: N 221/z"x 301/2" 21'/z"x 291/2" 251h"x 331/ 22Wx46%' 21 VVx 45VZ 2SYx49V 271h" z 27'/i 261/2"x 26Y2' 30'/z"x 301/ 3046 27Yz'x 43Yz' 261/2'x 42YZ 301/2'x 46Y: 3333 301/2"x 301h" 291h"x 291/2' 331/2"x 331E 3349 30Yz'x 46Y2' 291h"x 451/2' 33'h"x 49Y: 4646 431/2"x 431/2" 421/2" x 421/2" 461/2" x 461E 4949 46Yz'x 46%' 45Y4"x 45%" 49'h"x 49Y FAILURE TO FOI V Check local building codes for glass felt should already by installed. 1 To properly position skylight betty from the underside of the deckin ceiling joists from inside the hou ceiling opening. Then follow steps a) measure distance between t b) to center skylight, measure o side of center point and mar c) using the side marks as a gui, nails through roof. 2 Remove shingles 6 - 8" out from rc 5 Build curb: a) Construct curb with 2 x 4's, 2 x 6's, etc. (depending on height desired or building code requirements). Curb should be minimum 4" high. Be sure inside measurement of curb is the same as roof opening measurement. b) Secure curb to roof. See fastener schedule and drawing. 6 Shingle roof up to bottom of curb. 7 Flash curb (sizes 2525, 2549, 3333, 3349, 4949 can be used with Surf Tek's preformed, pre-cut Step Flash Kit with one-piece head and sill). Use galvanized sheet metal, aluminum, or copper. Metal should extend a minimum of 4" over shingles (on bottom side), then up sides of curb. Flashing should be flush with curb top. 8 Shingle up sides and across the top. 9 Position the skylight over the curb with the"THIS EDGE DOWN" label at the lowest side of the curb. Center the skylight over the curb, making sure the foam gasket is in contact with the top of the curb. As the fasteners, (see fastener schedule), are being attached to the curb, push down on the frame just above the fastener to insure a good seal. Use the #12 x 2" screws, provided. Continue attaching the remaining fasteners in the same manner. All fastener installation holes provided must be used. NAWM to #10 DECK SCREW X 231'-