HomeMy WebLinkAboutPRODUCT SET UPWE k
Str � ap
COMM
d=M
nololl
wa&
11ap i4n
SCANNED
. BY
St Lucie County
WNW M CUM= EAM MW OR WMAL Mil P=i& ww n**= *a W1
w foreft" fimtwebmft, All sav
UAD CW rj-IW" TUASM I nw 56n W.Mfaeftud 0 ft SOV 0 Mcwo CO2&MftY w te
tbe 0115 vd3 bmr=ft the edn coafing, All strV mm be mwked emy W to I V
ftrap AMA-Ghment
or
bd f=uxy &twhod wthecoamdogbMebM
: biacketi mug have a =do chp to, PMW
on Amp edga&Fald zthmW =imp smak m
Id,wed fwuse wstrapte anv-bW fkamcm-
Strap Spilice
igabuckkiswt
igffien a fwMrY
t -f he 56K a double
-e is
guteiy 12 DIM&MMS
two CdMP SCSI's C.-Mnly
TIE ENGINEERING
CERTIF RED TO
ANSI AMA ASTM 03953-01
QUAD THICK G420
GALVAUMD PROTECTION
MWe 19adda IS C Requirenwds
'per StfiT Ten
I- " Wt
bim-Mbor kZ041 av=b
1**-9*-FW1Sftvpwtbet
hwad"SMSCOM10
tc� 12 inthIs of stlap are
Availabb w W&V QM0 the
Usk, wanch or
suckeL axm tba wy, wird-
Mg, ft SUV five C * =pIew
Toms minimum Until the
strap is adoquatety
twWOMC& -
i 2 —Tw&
2 Cdop -per ud
-27
�i
m& a
Ou.
.s
is
c
lr
3
(Z.
cm
co
(,e
w. o
an, C ors.,
ng"Oftel � LOW Stablift 09 SVstnm�
Top-quality heavy
gauge steel
throughout system
x*ds requirements fnr all wind zones. Eliminates
To ties and stabilizers, saving ifmd and money.
Versatile: provides combined lateral and
longitudinal support; or only lateral, or
only longitudinal
Flat pad design installs easily, eliminates
digging and driving foundation pad into ground
lop tluitllty, ltBduy yauyt; MUMM piueivas
stability
t1t61izes adjustable tubing for structural
Integrity with less inventory
East► to install and neatly packaged for
warehousing and transpose
i .d . ^^'J0-01etin.7 t t
Versatile: provides
oombined lateral and
longitudinal support,
or only lateral, or only
longitudinal
Flat pad design installs
easilyg eliminates digging
and driving foundation
pad into ground,...,, •.
., nc rs,,&..
Longitudinal System Includes:
I - 20" Galvanized Steel Pad
2 - Beam Clips with Hardware
2 -1.51, Square Bracing Tubes
0120355 39"' Longitudinal System for All Zones
®13 O0®0 aw— L,v1fultudilJut O'vwlnl rug elm manna
0120357 53", longitudinal System for Ali Zones
Lat .l6L®ngltUd"enal System InciudOse
9 - 20" Galvanized Steel Pad
9 - bu'' AdJIst9b1d Lmmi Tube wltft HardiArare
2 - Beam Clips With Hardware
2 - 1.5" Square Bradng Tubes
0120377 390f, LiatemllLongiludinal System for All Zones
0120378 44"" LatemULongitudinal System forAil Zones
2120279 §?"* W?M,11 n 01+1'Ain ni Cyc &m dnr All 9 in=
".Refers to the length of the bracing tube
Lateral System Includes:
1 - 20" Galvanized Steel Pad
f - 60" Adjustable lateral Tube with Hardware
0120370 Lateral System
NotakdCad staff locations
Rgplar.gtl ent Pinx for P21M SYMO ns
' 0°120368 16" Pin
Specuiications Subject io Change without Notice
oul'f,tdft ossh
LONGITUDINAL AND LATERAL BRACINP SYSTEM
HOA1E
FRAME BEAM
2-X�"
OUTSIDE HOME BEAM
+.-YPxYi SELF DRI .
CARRIADE 60LT
.
MMLBC SEAM CUP
Wf 4 Y2 Xl 2
scREws - z-EA 10E
INSTALL AFTER HOME
prHER
wm
6tY FOR 99S" MAX. SPAN
CARRIAGE 80L15
15 �7 AND IA
BOLTS ARE nc'♦r
'
t-,li" dI TUBE
LATERAL TUBE CLIP-\
60" FOR 98.5" MAX. SPAN
I .i LONGITUM
BRA E T
2— 39' FOR 18" TO 24 PIER
2— 44" FOR 25" TO 32 PIER
2— 5" OR 41" TO 49" PIER
Yi x2 Y2" CARRIAGE BOLT
S03 PIER PAD
Imo( NG(TUDINAL BRACE DETAIL
NOTE:
1.A
COI
2.
0 MAX 4S (TYP.)
W%2 Yi MR�'� OT 1/2" HEAVY DUTY WASHER
W/ 1/2"xt-1/2" CARRIAGE BOLT
LATEReI t3RnCE D AIL
NOTES;
12" DRIVE PINS MAY BE USED IN CLASS 2 & 3 SOILS.
16" PINS MUST BE USED IN CLASS 4 SOILS.
MAXIMUM PIER HEIGHT- 48"
MAXIMUM SIDEWALL HEIGHT 9e
MAXIMUM BEAM SPACING 99.5"
WHEN USING LONGITUDINAL BRACES,,2ND PIER IN FROM THE END OF THE HOME
MAY BE USED TO MAKE ROOM FOR BRACE TUBES,
SPECa.10.tSTRUC NW5
LATERAL BRACE DETAIL ALABAMA - MAX PIER HEIGHT 32-
*Hf LABEL HOMES ONLY
LATERAL A MUMABLE FLEEMMO - MAX PIER HEIGHT 32"
LONGITUDINAL R LATERAL BRACING SYSLEM GRACE TUBE HOB£ 8 *BOTH LONGITUDINAL AND LATERAL
Dye ASSEMW DR OU(�ING CUi510E ERACES MUST BE USED ON ALL SYSTEMS
*MULTIWIDE HONES ONLY
*4.3:12 MAXIMUM ROOF PITCH
/2" BOLTS ARE GRADE 5 *90" MAX SIDEWALL HEIGHTS
> OR
LIP DELU% snn
19N000DIPWL PIER LIP UP
ANCHORS . BRACE TUBE
STEEL PIER PAD
Z �R W/ ORM
1 PIHS 50 3
8
a c ors,,1
SEE MAI DWG.
7 :•: —'
�.-- 7112 -- �
FOR 1iEA0 D51A1L i!@' X M ROD
\`•. 1/G• _ ; SSE HEAD DASTAI i
0 El
I f ,0 MNgh tu5th93
PIN
MIYA. STAVIM CAP
SEE DETA9.D`l.•G-
r LCCAMNOF tmm no.I
r FORHEADOELA4 £EE DW1G.
121 Dist: 4 GA.SEtEik7)EIXsE HELM
�� Owl. 9GA. @EL'B.Eo Y9@1d,0201A. t o"CODO•ACRN =V 3.9@!A.02DA.
ECG HEUx 5.08!6.02 DW. 9GA.CONTP.C1ING O:aX 8.9@;e.0."Ow. N t,AB;MgUSEDMANCMA99t'.Cr A4TOASIMA-UMIM MODEL: 4430-EZDH
CSC: 9CA. MSLED EDGF HM 3. US. PAS NO.4927.165
19VA.020@L 9�DEL: 4636 - EZDH 2. NEE d. %WMM 00?jC 70 AWS A5.1@CLASS ER 7093
t?:1.US8)@•tANCffWtKi6Y. -u. U.S. PATf10.4.923,165'
5/@` YAMA41 S PANITO@6ALOWGLOSS.WAERRESSWNLC0M'0.
AsmALsaaAatiE+ID2D :+LOLLETA+roxwsASLaeLa9sER7_
5. PAWITO@5AL0WGL09S,%i=RF9 MWCOADNG.
Irs'4b M!r
'�EMMI hus•sKiRnN
Solid, Pane
.040-11 -4
Center: Ve-. Panel
.040"
Top Fr6nt Trim
.059",
Top gack T im
.05911:
` BottoiV- Trim
.047.
Ventilation:
Center Vent 8.4 sq. in./ft. of panel
Available Colo
White
Grey
Tan
Clay
Sand
ventilation. E
Ctai Vent sq. in./ft. of pan6l 11..I F
Ce1.
nter inyl Skirting 7.'- rM
Av able Colors x1
Mid Panel
ai )35
White Vented Panel )35"
Grey
I Dp Front Trim )50"
Tan
Clay oT Dp Back Trim ..)48"
•Sand Bottom Trim 4na
parlsion: Premium Plus Eagle
Trim, lit C014 .059" it 1050d NOTE: Top Back trim fO(
Front Ball Back Rail .050. .04W Premium Pi us and Eagle
§
Bottom( Channe 1 .047' ,pop" Trim Kite ar the Same
Top Front Trim th 4.725" I 4.360" dimensionsl
Upper deg .59 .550"
I The I 6n man 1 Installers use Premium Plus Trim Kit is with Eagle Panel is because it it HEAVIER;
and, in where blow-out is a problerbi, Premium Pldp offers more rigid projection abalinst blow-out.
90/ZO 39Vd
I
10d3a 3wOH 3II90w
OML90698 9VUO 010MULO
l
S►,TEP A:
ATTACH BACK RAIL
L. Determine a place for mounting. PIace bottom edge of back rail
just below botaam edge of the home. This location must offer solid
support for attaching and wind load pressure for pastels and faits.
12. Keep the back rail straight and level. Snap a chalk be around the
home to guide the top edge of the bank rail.
�3. Correct sctevAng or nailing method for back rail: Start on the back
side o£the home. Posidon screws ox nails in the center of the slot.
Screw/nail to allow for a clearance of Me' from the back rail
surface. Now. avoid tightly screwing or nailing back rail. A 1/16"
clearance allows for normal expansion and contraction with
temperature change. Place a screw or nail in every other slot.
4. Provide a 1/2" gap between each back rail section for normal
! thermal expansion.
To install around comer, refer to Step E.
■ A50 A.
IMAhI EL RIEL DE APOYQ
1. Determine un lugar para el montaje. Coloque at boxde inferior del
Ail de apoyo justo abajo del boxde inferior do la casa. Esta
ubicaci6n debt ofceoer un apoyo fume que petmita clavar Jos rielm
y soportar U presibn por cargas de viento en los paneles.
2. Mant mp derecho el riel de soporte y a nivel. Marque una lines
con el cordel catizado altededor de la casa pars guier el boxde
superior del riel de apoyo.
3. MOD& correcto pars clavar el riel de apoyo: Comience en ]a parte
posterior de la casa. Coloque los elms en el ceneo de I% ranum
pate clavos. Introduzca los clavos y deje una holgura de 1/16' desde
la superficie del del de apoyo. Nota: No clave may ajustadamente
el del de apoyo. Una holgura de 1116" con la cabeza del clavo
permhid el espacio su6cimte pare absorber la expansion y
contmcci6n normales resultantes de Jos cambios do temperaturs.
Coloque los elms en ranums altemas.
4. Dejc un espacio de la' entre calla secd6n de riel de apoyo para
tenet en cuenta la expansion tdrmica normal.
Para instalar el producto alrededor de Jas esquinas, consults e1 Paso I'r.
i EP Be
MOUNT 130170M RAIL
1. Ground preparation. Pjapare the ground so that it is smooth, free
of loose clumps, clods or protruding obstacles. Guard against
uneven settling of newly excavated ground by mounting the.
bottom rail on treated (AT') lumber:
2. Mark the ground location directly below the outside, bottom edge
of the home. Use a level or plumb bob to determine this location
at each Corner.
3. Snap a chalk line or stretch a nylon string between each corner to
guide the bottom rail.
4. Position the bottom fail with the back leg toward the inside of the
chalk line perimeter.
5. Drive ground spikes every 19 inches. Two sets ofholes are provided
irx the bottom tali. They are located inside the channel, and on the
back leg. Ground spikes may be driven in either hole at intervals of
19 inches.
6. Installation on concrete. Use a 3/4' masonry nag. You may also
&I a hole for a 3/1.6" molly screw and plastic sleeve. (Nail and
screw materials are available at most hardware stores.)
To instaU around corner, refer to Step E.
PASO B:
MQNTAX DEL IUEL INFERIOR
1. Preparaci6a del piso de tiers. Prepare el piso de mancra que est6
uniforme, sin cocas sueltas, terrones ni obstaculos que sobxesalgen
del piso. Proteja In instalad6n contra el asentamiento no uniforme
enplsos main excavados, montando el del infex><or en unapleza de
trades tratada (2" x T).
2. Marque la ubicad6n en el piso directamentc abajo del borde
inferior externo de la casa. Use un nivel o una plomada pars
determinar esta ubkad6n en c ado esquina.
3, Marque una liaea con el cordel entixado o coloque una, cuerda de
nilbn entte cads: esquka pare gout el Ad de apoyo.
4. Coloque el del de apoyo con lapata de xespaldo haoia el inte4ordel
pedmet ro maicado pot la Linea de tiza.
5. ltitroduzca los clavos rem en e1 piso a cads, 19 pulgadas. En el
0E0-3 i�0l�0JL�0Ad L8L—.L 6�LE-658-0�8—L
21UT.1JJ0T1uLT1rd-1Jn9-4 WAS QT..-1.01—TR
riel infezxor se proporcionon dos conjuntos de agujeros. PAtos se
e6mentran deotro del canal, en la pata de soporte. Los clavos
gruesos pars el p"iso se pueden c aiw a traves de cttattluiera de los
aguleros a una distancia de 19 pulgadas entre si.
6. lintalacibn ea pisos de concreto. Use urt claw de 3/4" pare
rx►ampostedL Asi mismo se puede taladrar tm agujero pore un
tQ3110 de 3/16" tipo Molly cot► ancla plestica. (Las rnatcriales de,
clavos y los tornillos estin disponibles en la mayoda de las
E reeterias). 1.
Para lnstalar el producto alrededor do Ias esquinas, consulte el gasp E.
MEP Ce
ANIL INSTALLATIONi 1. eginning 24" away from the lowest.corner of the horse, measure
fiom the ground up to 1-1/2" above the bottom edge of the back
rail. (If the temperature is below 407, with frozen ground, measure
tv 3" above the back roA edge)
2, A4casurements on sloping ground should be taken every 16" (width
of panel).
3. Cut the bottom of each panel to angle with the gttiauttd. Each cut
pail section should align 94° to the bottom edge of the home. Use
avratron snips or a power saw (with a fine toothed saw blade turned
backwards) for cutting.
4. Punch lock tabs every 4" along the top and bottom: edge of cut
panel sections (or outside portion; of each panel face for 13"
Vari$est)- A, Malco (SL-8) Snap Lock Punch tool is
r�ommended. Consult your shutting supplier for obtaining this
tool. Tabs are to be positioned oumwm to catch on the hooped
edge of the rails.
S. Interlock panels and insert irtto the bottom rail. Begin with the
first pastel inserted into the bottom. rail. Lock tabs should snap past
the hooped edge of the bottom rail. Insert next panel section into
the interlocks hooks along the vertical edge of the panels. Seat each
Mel securely into the bottom rail. Repeat interlocking panels,
forming about a 12-foot section- Resume panel cut and interlock
method.
To install around corner, refer to Step K
0
CS
2 AF%%F
IWALA06H DE LOS PANELES
1. Comewndo a 2e do la esqu ina inferior rob baja de la casa, mida
desde la superficie del piso h&sta 11/2" arriba del borde inferior del
riel de apoyo. (Si la tempermtum ambiente durance la instalacion, es
inferior a los 40T y el piso esti congelado, mid& hasta 3" arriba,del
borde del M de opoyo).
2. Las medicioaes en pisos con: desnivel deben hacerse a coda 16"
(ancho del panel),
3. Corte Is pwte inferior de coda panel on angnlo s gn el desnivel del
piso. Cad& wx!6n de panel cortado debe estar a escuadm (9(°) con
el borde inferior de la can. Use gems de hojaiateto o una sierra
oUctrica (con una hoja de corte de diente find coiaeada al reves)
pars corms los paneles.
4. Perfore las lengtietas de cierre coda 4" a to largo dal borde superiror
e inferior de las seecioncs de panetes cortados. Se recomienda d use
de una punzonadora de mano Mateo (SL-S) Snap Lock. Punch.
Consulte con au proveedor de cenefas cobau c6mo.obtener esta
herramients. Las leng,etas deben colocane hacia ofuem a fin'de
poder enganchar el borde & picho de los ri o.
_-... ..-r =�._ _ .•5r1.rT TlnT1ITYIT'1 L.f T1AtT.T riL-1•i•fA i�T 1fA Tt71
I
j. Enganche Jos pancics c introdutcalos en el rill inferior,
Comienee con el pAmet panel introducida en el fief
;inferior. Las leng,etas de ciem deben engancham hasty
mis JU del borde con gancho del rief de apoyo, Introdusca
1 la siguiente seccidn de panel en los ganchos de
enclavarnknto a to largo del borde vertical de las paneles.
Asiente cada panel f=emente on el rid in£ealoi Repi4 el
enclavauniento de los panelcs hasty formax Una section Ile
apaogbadmente 12 pies. Reaaude cl forte de los pantos y
el merodo de enc1avac0ient0.
Para instalar el producto on las esquinas, consulte el Paso E.
�P D:
INTERLOCK FRONT RAIL
VRTH BACK RAIL.
i. Starr wrapping one end of the front top rail into the back
top rail, creating the interiock. push the front top rail
upward, its entire length until the front top rail is
cmrrpletely interlocked with the back rail.
2. Overlap V ea6 top to section.
To k4tan around corner, ref" to Step E,
PASO Qi
fttiCOH
IRM DEI. RIEL
EL RIEI, DE APOYO
1.� Comience enganchattdo un extcemo del riot frontal superior
on, el ricl superior de spoyo, paxa formar el nw anismo de
enclaysmient+o. Empuje el rid superior de apoyo hacia
arriba en toda su longitud hasta que el del frontal superior
este complemmente engar► wo an el del de apoyo.
2. Thelape V cada secelk del riel superior:
Para ianstalar el producto on Iss esquivas, eonsulte el pain E.
nn'ra .T mAthia iommaj J oT— T
�P E' A'1'ION
CORNER INSTALL
I. Top back rail — Make a i" vertica, slit from the top. Top
Jnttrlock hook should be cottrpletdY cut &=gh. Notch
45` on botWM curved leg.
2. Bottom ail — Not& the back portion wit' snips, as
illustrated. Rend around a comer mid attach to the ground.
3. panels — Cut panel to proper height. DeterrbTine point of
corner bend; bend over a table cdge, fors 4 a uniform
angle.
4. Top fnmrrail—Bosch at both the top and bottom books of
the front rail, as illustrated, blend around the corner and fit
into the interlock with the top back rail Refer to Step D.
FOUR PIt&N=HED 'SDP ERGOT
RAILS ARE INCLUDED IN TRIM PAK.b
PASO
IN911ALA * DEL PR0DUCF0
EN LAS ESQUINAS
I. del superior de apoyo — Hop un forte vertical de V deadl:
la parts superior. F,1 gaucho superior de enclavamiento debe
cottam completamente, Haga una muesm a 47 on la pact
cwvada inferior.
2. W iderior — Corte lit poxeidn postrxiox tijetas de
Iwjalatem segue se muesrxa en In betfaci6n. Ddblelo
alrededor de una esquiva y clivelo at pism
3. Paneles— Corte el panel aIa altars Twf ada, Determine el
panto dedobloc doble el panel sobre el horde de una rrV^
Para format urr bgnlo recto.
4. Riel frontal superior — Corte los gauchos superior a iiofarim
del riel frontal, Seen $a gustra en la figuta, Doble la pim
alrededor de la esquina y enguttcheta an of eTte]avamlento
con d riel superior de apoyo.
Consuite el Paso D.
EN EL CUNJUNTO TRIM PAK SE
INCLUYEN CUATRO RIFLES
SUPERIORES FRONTALES, YA
CO M OOL
awrid/0tILIP-TIV-W0H3 £S :60 5L t-tO-Zf�