HomeMy WebLinkAboutFIELD - LAB REPORTip `V
820
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing'- Threshold Inspection
Building Code Administration, Compliance Inspection & Plan'Review
Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978
UES Project No.: 0310.1700251.0033
Date Typed: January 07, 2019
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes SCANNED
1450 Centrepark Blvd Suite 340 �Y
West Palm Beach, FL 33401
St Lucie County
Project: Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit No 0380 Fort Pierce, St. Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (UES) representative(s) performed construction materials testing and/or
field Inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets.) The'contents of this package are summarized below:
Scope of Work
Work Order No. Date Type of Report
1 104851-1 1 12/28/2018 1 In -Place Density Test Report w/Activity Record
We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
Sincerely,
Universal Eng9►lering Sciences, Inc.
Certificate of_Al lttt l iza;ion 0.00000549
RECEIVED ", "y,., . /•
MAR 18 2019
ST. Lucie County, Perm_ itt_ing
I
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
I
I
ICC Email: cbugg@nvrinc.com; elibrihi@nvrine.com; Imhoff, Bryan iBIMHOFF@nvrinc.com]; jomcalli@nvrinc.com; rofingar@nvrinc.com; sign/seal MAIL to
ryan homes at 1777 Willows Square, Vero Beach, FL 32966
i
UFO &roject No: 0310.1700251.0033
UN 1.. E R S A L UES ROCS No: UES Report No: 104851_ 1 ARC 122818
ENGINEERING SCIENCES On -Site Time (hrs): 1.00
Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00
Geophysical Services • Materials Testing Threshold Inspection Travel Time (hrs): 0.50
Building. Code Administration, Compliance Inspection.&PlariReview Total Time (hrs): 1.60
820 BIrevard Avenue, Rockledge, FL 32965 - P: 321.638.0808 - F: 321.638.0978
Client:
Project:
1
Date of Activity:
Technician:
Activity Record
Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit No 1810=0380, Fort Pierce, St. Lucie County, FL
Friday, 28 December, 2018
Cliff C
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
i
0310.1700251.0033
UNIVERSAL
UUES ES DOCS Noo:
ENGINEERING SCIENCES UES Report No: 104851-1 DT122818
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold, Inspection,
Building Code Administration, Compliance Inspection & Plan Review
820 Bre�vard Avenue, Rockledge, FL 32965 - P: 321.638.0808 - F: 321.638.0978
In -Place Density Test Report
Client:
Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project:
Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit No 1810-0380, Fort Pierce, St. Lucie County, FL
Area Tested:
House pad
Type of Test:
Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 1.2/28/2018
Lab: ASTM D1557 Modified Proctor
Technician:
Cliff Cherrnay
Requiirements:
95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlvino soils below the tested rieoths
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density `
(PCF)
Field
Moisture
% '
%
Compaction
Comments
(3)
1
N/W test
0-1 ft
12.00
21180
109.1
12.4
97
A
2
N/E test
0-1 ft
12.00
21180
108.5
11.8
97
A
3
S/E test
0-1 ft
12.00
21180
110.0
11.6
98
A
4
S/W test
0-1 ft
12.00
21180
111.2
11.8
99
A
(1) Ref. Datum: 0 = Top of Final Grade
(2)
'Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
I 21180
112.0
11.0
This test was performed without deviation from ASTM procedures.
(3) Comments Key
A. Compaction meets min. requirements.
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
UNIVERSAL
i ENGINEERING SCIENCES
Consultants In: Geqtechnical Engineering • Environmental Sciences
i Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
UES Project No.: 0310.1700251.0033
D f pJWJ4a8, 2&" Ar =T L.L. �� W*.i F y
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit Now 'FO- 380 {Port Pierce, St. Lucie County, FL
i
As requested, Universal Engineering Sciences, Inc. (UES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of.this package are summarized below:
Scope of Work
Work Order No.
I Date
I Type of Report
1048514
1 1212&2018
In -Place Density Test Report wlActivdy Record
We Hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of Authorization No. 00000549
N6 Richard E.
G; ••�,�cE�vsF -,�� , Hoaglin, P.E.
.: Z� 2019.01.07
r
• Rio r
48798 11:28:45
�sraT_ o�
'-05'00'
� •,
' f'��Il r l i) V�11.i.
Richard E. Hoaglin, P.E.
FLORIDA
., Professional Engineer No. 48796
This item has been electronically signed and sealed by
Richard E. Hoaglin, RE using a Digital Signature. Printed
copies of this document are not considered signed and
sealed and the signature must be verified on any electronic
copies.
ICC E�ail: cbugg@nvrinc.com; ellbrihi@nvrino.com; Imhoff, BryDmcalli@nvrinc.com; rofingar@nvrinc.com; sign/seal MAIL to
ryan homes at 1777 Wilows Square, Vero Beach, FL 32965
RECEIVEI)
2019partmentnty, FL
UES Project No: 0310.1700251.0033
UES UNIVERSAL UES Report No: 104851-1 ARC 122818
ENGINEERING SCIENCES On -Site Time (hrs):1.00
Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00
Geophysical Services • Materials Testing • Threshold Inspection Travel Time (hrs): 0.50
Building Code Administration, Compliance Inspection&Plan Review Total Time (hrs): 1.50
Brevard Avenue, Rockledge, FL 32966 - P: 321.638.0808 - F: 321.638.0978
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit No 1810-0380, Fort Pierce, St. Lucie County, FL
Date of Activity: Friday, 28 December, 2018
Technician: Cliff Che
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested -and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1557.
The' Contractor was notified of the test results or a copy was left for their records.
i
I
820
Client:
I
i
Project:
i
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
Area Tested:
Type of Test:
i
Technician:
Requirements:
In -Place Density Test Report
UES Project No: 0310.1700251.0033
UES DOCS No:
UES Report No: 104851-1 DT 122818
Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Oakland Lake Subdivision Lot 64
5309 Oakland Lake Circle Permit No 1810-0380, Fort Pierce, St. Lucie County, FL
House pad
Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 12/28/2018
Lab: ASTM D1557 Modified Proctor
Cliff Cherrnay
95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
nnly nnri rin not ndriress the condition of the underivina soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
NMI test
0-1 ft
12.00
21180
109.1
12.4
97
A
2
N/E test
0-1 ft
12.00
21180
108.5
11.8
97
A
3
S/E test
0-1 ft
12.00
21180
110.0
11.6
98
A
i
4
SM/ test
0-1 ft
12.00
21180
111:2
11.8
99
A
(1) � Ref. Datum: 0 = Top of Final Grade
I
I
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
21180
112.0
11.0
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced, except In full, without the written approval of Universal Engineering Sciences.