Loading...
HomeMy WebLinkAbout2021-02-04 Flow Test Report #2 2020Hydrant Flow Test Report Name Common Oak Engineering Adress:7323 Indrio Rd HYDRANT # & LOCATION West side of Indrio Rd DATE:12/28/2020 TEST BY:Fire Equipment Services Day or Week:Monday TIME OF DAY:0:00 MIN. OF FLOW:1 WATER SUPPLIED BY:Municipal PURPOSE OF TEST: DATA FLOW HYDRANT(S)A1 A2 A3 SIZE OPENING:2.5 COEFFICIENT:0.8 PITOT READING:20 GPM:754 0 0 TOTAL FLOW DURING TEST:754 GPM STATIC READING:65 PSI RESIDUAL:52 PSI RESULTS:AT 20 PSI RESIDUAL 1474 GPM AT 0 PSI 1798 GPM ESTIMATED CONSUMPTION:GAL. REMARKS:.8 Coefficient is required by FM for smooth, well rounded hydrant outlets 0 667 1474 17980 10 20 30 40 50 60 70 80 90 100 0 500 1000 1500 2000 2500Pressure, psigFlow, gpm