HomeMy WebLinkAbout2021-02-04 Flow Test Report #2 2020Hydrant Flow Test Report
Name Common Oak Engineering
Adress:7323 Indrio Rd
HYDRANT # & LOCATION West side of Indrio Rd DATE:12/28/2020
TEST BY:Fire Equipment Services Day or Week:Monday TIME OF DAY:0:00 MIN. OF FLOW:1
WATER SUPPLIED BY:Municipal
PURPOSE OF TEST:
DATA
FLOW HYDRANT(S)A1 A2 A3
SIZE OPENING:2.5
COEFFICIENT:0.8
PITOT READING:20
GPM:754 0 0
TOTAL FLOW DURING TEST:754 GPM
STATIC READING:65 PSI RESIDUAL:52 PSI
RESULTS:AT 20 PSI RESIDUAL 1474 GPM AT 0 PSI 1798 GPM
ESTIMATED CONSUMPTION:GAL.
REMARKS:.8 Coefficient is required by FM for smooth, well rounded hydrant outlets