HomeMy WebLinkAboutPW
PUBLIC WORKS DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE
December 16, 2020
PROJECT: Self Storage Kings Highway
REF: MJSP-11202025892
TO: Bethany Grubbs
FROM: Grant Chambers
Completeness Review:
The information provided is not sufficient to review for Deficiency.
1. Provide an updated Boundary and Topographic Survey.
Deficiency Review:
The following comments are offered based on plans dated November 18, 2020.
1. Turnpike Feeder Road is an FDOT Right-of-Way. Please coordinate with FDOT for
permitting improvements within the Right-of-Way or any required Right-of-Way
dedications. The contact for FDOT Right-of-Way dedication is Nesa Harden at 954-777-
4437, nesa.harden@dot.state.fl.us.
2. Provide documentation of legal access to the private roadway to the south.
3. Dimension the driveway width, radius of return, and setback from side property lines and
adjacent driveways. Section 7.05.06 of the Land Development Code includes minimum
setback requirements for driveways. A driveway variance will be required for the
proposed location of the driveway on Miramar Avenue.
4. Provide a truck circulation plan depicting how the dumpster collection, fire department,
and delivery trucks will safely maneuver onsite.
5. Provide typical pavement sections for all vehicular use areas. Vehicular use or storage
areas are required to be paved with asphalt or concrete.
6. Provide property line cross sections showing that adjacent properties will not be
adversely impacted.
7. Provide details for curbing and sidewalk complying with current FDOT standards.
8. Trees placed within 10 FT of drainage structures or pipe shall include a root barrier
product to protect the drainage system.
9. Gated access shall comply with section 7.10.15 of the Land Development Code. Provide
dimensions demonstrating that Right-of-Way setback and queuing spaces comply with
this code section.
10. A Site Development Permit is required prior to performing site improvement activities.
Subsequent to DRC approval, the applicant may submit the required documents to
Grant Chambers, P.E. in the Engineering Division. Documents include, Site
PUBLIC WORKS DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE
Development Permit application, two sets of plans, one copy of the stormwater report
and other appropriate information. In accordance with the permit and Land Development
Regulations, the applicant shall retain the EOR for site inspections and final certification.
11. For discussion regarding these comments, please contact myself at 772-462-2741 or
chambersg@stlucieco.org.