HomeMy WebLinkAboutBUILDING PERMITCode Compliance Division
2300 Virginia Avenue
Ft. Pierce, Fl- 34982
ie: (772) 462-2172 Fax: (772) 462-W3
r.stlucieco.org/public—works/permitting.htm
):Ilairs.slcfl.vetrol.com/AIRSweb.php
BUILDING PERMIT
Page 1
Issued: 12/310/2009 Conf #; 723 Permit #: SLC- 0912-0073
Job Location: 2909 25TH ST City: FORT PIERCE
Permit Type: Commercial Renovation
Job Description, INSTALLATION OF INTERIOR DOUBLE DOOR IN HALLWAY AT A NURSING HOME FACILTY (90
MINUTE FIRE DOORS) SCANN�0
Subdiv: 0:Y
Lot: Block: Parcel: 2420-441-0001-000/8 St Lucie County
Setbacks Left: Right: Front: Rear: Zoning:I
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 0.00
Minimum Floor Elevation: Flood Map: 186F Flood Zone: X Elev:
Contractor JACOBS JOHN M JOHN JACOBS CONSTRUCTION INC (772) 519-0798
4701 OLEANDER AVE FT PIERCE, FL 34982
:C Zi'_L.. .::�+=.1 ^_'.�'2Fi.✓'."^ ...,.m':wT::�T�....�":Z,..a^."�sffi��2:.;fib.:';°SL%.F'..:`:Pw.+�.`S..�'w�.:�...."°""T"i='Ya.'d�'.T2"1��X�C�,..".:".... �..^�r�.^.�J
Property Owner WSL LAKE FOREST INVESTORS (512) 787-1430
% WALTON ST CAPITAL LLC CHICAGO, IL 60611
a.:.:,���.�--� t��.z;:��.��:�N��:-�-..--w-.V���•.<:M-.�-�a���:��-.�y,��-<;;���.�--.� ,--_yam
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing and structural work. Further, he/she acknowledges responsibility to comply with
all requirements of Ithe 2007 Florida Building Code and the St Lucie County Land Development Code.
Issuance of this permit may be appealed to the St Lucie County Board of Adjustment by an aggrieved party by filing a notice of appeal with the St
Lucie County Growth Management Director within thirty (30) days of the issuance of this permit in accordance with St Lucie County Land
Development Code, Section 11.11.00., Appeals.
Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months
(permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit in accordance with St Lucie County Land
Development Code ISection 11.05.01 (A)(2).
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the
records of this county, and there may be additional permits required from other governmental entities such as water management districts,
state agencies, or federal agencies. s:553.79(10), F.S.
WARNING TOE OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN
YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT
MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR
NOTICE OF COMMENCEMENT. s:713.135 (1)(a), F.S.
Christopher Lestrange
Building Official
Date