HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE09-17-'19 14:44 FROM-
7728787656 T-931 P0001/0006 F-546
Services
C�II-O�i
RECEIVED
FL82 SEP 17 2019
65 FaX 77Z-462-64 43 Permitting Department ;
St. Lucie County
Regtaed for SO-D" Tevno"'i r`Pdwer Release
Date %-Q\\. Pei hilt liaixiber. \� \\\ _tc) � V
Pmect Address: :� i E4�
St Lucie County
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL 1`i0WER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD MOTTO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OFFTESTING SYSTEMS
ANq EQUIPMENT IN PREPARATION FOR A: FINALSNSPE121TON. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACMOWLEDGE AND AGREE AS FCUOWS:
I. This temporary power release is requested for the above stated purpose only, and then: wad be no
occupancy of any type, other than that permitted by cohsYWCon during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and Conditions of this agreement,
Including Building Division Policy which is Incorporated herein by reference.
3. All condirdons'and requirements �sted In the attached document entill d "Requirements for 30 Day
Power for Testing" stave been fulfilled and the premise is ready for compliance inspection.
4, All requests for an eXWn§inn beyond 30 days must be'made in writing to the Building Official slating
the masonfor the request. Power maybe removed `flrom the stte and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A fee of $100.60 will be required to int
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD. HARMLE . ST, LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND .CLAIMS OF ANY TYPE OF .NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNEMON OF ELECTRICAL. POWER IN THE EVENT OF VIOLA7TON OF THIS AGREEMENT,