Loading...
HomeMy WebLinkAboutLETTER FROM MANUFACTURERPABRIGATQIRS CANNED St Luc eCounty To Whom It May Concern: As outlined in the Florida Building Code, Extreme Metal Fabricators, LLC will accept the installation of metal roofing panels over one layer of shingles or modified roofing, assuming all requirements of Florida Building Code 5`" Edition (2017) Section 1510 Reroofing, 1510.3 Recovering versus replacement" and/or Florida Buiding Code a Edition (2017) Residential Section 905.10 and Retooling Section 907" have been met. It is important to ensure the existing substrate is not deteriorated, there is no entrapped moisture, meets all code requirements, and to install an approved separator underlayment between the existing roofing and the metal panels, such as those that comply with ASTM D226 Type I or Type 11 or ASTM D 1970, or ASTM D 4869. The roofing contractor of record must verify the aforementioned requirements. Having confirmed code requirements, installation in this manner is approved by Extreme Metal Fabricators, LLC as the manufacturer. Plywood sheathing must be minimum 15/32" CDX plywood or 3/4" wood plank, solid decking, fastened per FBC requirements. The wood substrate must be inspected to ensure that it has not deteriorated and is acceptable as a suitable substrate for additional roofing. Fasteners used should penetrate minimum'/4" through structural decking or a minimum of 1" penetration into a thicker wood substrate, to insure pull-out values remain the same. Consideration should be given to the unevenness of the underlying shingles, which may telegraph through the new metal panels. As in all metal roofing, 'oil canning" is an inherent condition that can occur in the panels. Care should be taken during the installation, to observe the metal panels as they are installed, and adjust installation procedures, if possible, to help to minimize "oil canning". "Oil Canning" is an aesthetic issue not a structural issue, and not a cause for rejection. The energy savings that is normally observed after a new metal roof replaces the previously shingled roof, may be negated due to the underlying shingles holding heat energy much longer than a metal panel installed without shingles beneath it. It is important to comply with all requirements of the Florida Building Code, Fire Rating requirements, and local code requirements. As always, authorities having jurisdiction, (building department) should be consulted, and approve your demolition and reroof installation methods, prior to beginning work. Extreme Metal Fabricators, LLC 9 21605W Poma Drive Palm City, FL 34990 (772) 872-8034 (Phone) (772)872-8035 (Fax) rtEYs'rC?NE :. ' hreeaeoccawn Limitations: FL17O22.1 6V - imp (26GA Steel), 249, Wide Roc _anel - Details - 1. Undedayment to be compliance with current Florida Building Code (FBC)2017 Weed. 2. Minimum slope Uo be compliant with Florida Building Code 2017 61i ad., and per with Manufacturer's installation reference. 3. Products are compliant for State of Florida product approval per Rule 81G203. Compliance Method: 1-D 4. Engineering analysis for °project specific approval by local authorities 6IG2 -3. Co is allowed by other registered engineers. 5. Fire classification is not part of this acceptance. Shear diaphragm values are outside this report 6. Support framing in compliance w/FBC 2017 6'" ed., Chapter 22 for Steel, Chapter 23 for Wood and Chapter 16 for Structural Loading. 7. This report does not imply warranty, installation, recommended product use outside of this report se<mar wL m 81o+d-irz-vm, wraarx-m.R W sva:,r,PAdr" HW===PZ= b mp PkVjWd.« 1? 14 NT nPT100M smwrnks Panel Profile 12" O.C. —i o C. 'Fasten EN-1-10 Min. or #10 x 1-VP Min. per Table "A" Hex V%sher Head Screw veSpaced A the gOeilap RefertoTable WSpacinAtonanel gPanel Length Deck 15132" or greater Plywood, or -VWod plank