HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE09-17-'19 14:46 FROM- 7728787658 T-931 P0005/0006 F-546
S
Pa Aire s
FL 3AiW
6S Fax' 772462-6443
R4equ for SO -Dag Terlipo miry Pdwer Release
Dale: �'l�� 1it Nr7rriber� �� C
\ ---_
ProjedAddress; _Lo
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SY
AND EQUIPMENT IN PREPARATION FOR A.FINAL INSPECTION. IN CONSIDERATION OF APPROVAL oZNNED
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: BY
1. , This temporary powerreiease is uesEed for e ` f LUCie county
occupancy of an th ab(Ne Slued pp only, and there wi8 be no
Y type, Allier than that permitted by Construction during this time period.
Z. As w mess by our signatures, we hereby agree to abide by all terms and conditions of this agreement, Including Building Division Pblicy, which Is incorporated herein by referenm
3. Ali conditions; and requirements listed in the attached document entitled ^Requirements for 3D Day
Power, for resting" have been fUlfiiled and the Premise is ready for compliance inspection,
q kll requests for an elktension beyond 30 days must be:made in writing to the Building OfQaal slating
the Mason €or the request. Power may be removed Ymm the site and%r a SCop Work Order issued if
the RnaL InsPecaOn has not been approved within 30 days, A fee of $100.00 will be required to lift
the StoP Work Order,
WE HEREBY RELEASE AND AGREE TO MOLD. HARMLESS, SL LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LEAB1LiTIES AND .CLAIMS OF ANY TYPE OF NATUi� WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE W13ICH N1AY BE INCURRED DUE TO THE
D=NNECTION OF ELECTRICAL POWER IN THE EVENT' OF VIOLATinV t' p7N17c r_omcft�m