HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPERMIT
BUILDEF
PEST CC
PEST CC
We, the un
subterrane
Square feel
Percentage
Date of Tre
Note: There
site to be ph
fee charged.
FBC104.2,
shall be pn
providing a
Certificate
treated, chi
protective 1
be complet
St Lucie (
the electi
Revised
(gjt — b
{e'^ Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443 S'L+
qN
CERTIFICATE OF TERMITE TREATMEN U%e'� NFL
CONSTRUCTION SOIL TREATMENT caupty i
LICENSE #: JB175775
signed, hereby certify that we have pretreated the above described Construction for
termites in accordance with the standards of the National Pest Control Association.
if area treated:Q�
solution: •05%
Chemicals used: DOMINION 2L
Total gallons used:
Time of Treatment: _ %0 C3 C) `
Slab
Treatment 1st Treatment
.e-Treat Re -Treat
I. Pools
Treatment
_Re-T�g
�l O
" 1" Treatment
Re -Treat
1s` Treatment
Re -Treat
'erimetey for FBI Inspection
Exterminator
S�
ct be a completed form for each req I treatment or re -treatment and this form must be on the job
up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
Certificate of Protective Treatment For prevention of termites. A weather resistantjobs/te posting board
Yed to receive duplicate Treatment Certificates as each required protective treatment is completed,
spy for the person the permit is issued to and another copy for the building permit files. The Treatment
r/l provide the product used, Identity of the applicator, time and date of the treatment, site location, area
ical used, percent concentration and number of gallons used, to establish a verifiable record of
7tment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
prior to final building approval.
unty requires for the final inspection for CO, a Permanent Sticker to be placed on
al panel box cover, listing all the treatments and dates of applications.