Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPERMIT BUILDEF PEST CC PEST CC We, the un subterrane Square feel Percentage Date of Tre Note: There site to be ph fee charged. FBC104.2, shall be pn providing a Certificate treated, chi protective 1 be complet St Lucie ( the electi Revised (gjt — b {e'^ Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 S'L+ qN CERTIFICATE OF TERMITE TREATMEN U%e'� NFL CONSTRUCTION SOIL TREATMENT caupty i LICENSE #: JB175775 signed, hereby certify that we have pretreated the above described Construction for termites in accordance with the standards of the National Pest Control Association. if area treated:Q� solution: •05% Chemicals used: DOMINION 2L Total gallons used: Time of Treatment: _ %0 C3 C) ` Slab Treatment 1st Treatment .e-Treat Re -Treat I. Pools Treatment _Re-T�g �l O " 1" Treatment Re -Treat 1s` Treatment Re -Treat 'erimetey for FBI Inspection Exterminator S� ct be a completed form for each req I treatment or re -treatment and this form must be on the job up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection Certificate of Protective Treatment For prevention of termites. A weather resistantjobs/te posting board Yed to receive duplicate Treatment Certificates as each required protective treatment is completed, spy for the person the permit is issued to and another copy for the building permit files. The Treatment r/l provide the product used, Identity of the applicator, time and date of the treatment, site location, area ical used, percent concentration and number of gallons used, to establish a verifiable record of 7tment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall prior to final building approval. unty requires for the final inspection for CO, a Permanent Sticker to be placed on al panel box cover, listing all the treatments and dates of applications.