HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESt Lucie County Inspections h, 2 0 2007
2300 Virgi>'a avenue
Ft Pierce FL 349p Public Works
St. Lucie County, FL
(772)462-2172
SCANNED
BY
CERTIFICATE OF TERMITE TREATMENT St Lucie County
CONSTRUCTION SOIL TREATMENT
:PERMIT# c77��3—oK(7 JOB
'PEST CONTROL CONTRACTOR qaV'
I PEST CONTROL LICENSE # I � 4 l �J_
S�u I Cam{
We, the undersigned, hereby certify that we have pretreated the above -described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated:._Chemicals used: &Ibv-Z
Percentage of solution: r 25.fo
Date of treatment: 6 ` / 9 - 0?
❑ Footing
❑ 1st Treatment
❑ Re -treat
Slappb��
ll_I-Ist Treatment
❑ Re -treat
❑ Driveway
❑ 1st Treatment
❑ Re -treat
❑ Pools
❑ IstTreatment
❑ Re -treat
❑ Other
❑ 1 st Treatment
❑ Re -treat
Total gallons used:
Time of Treatment:
k'BC104.2.6 Certificate of Protective Treatment forprevention offermites.
A weather resistant jobsitd posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed providing a copy for rite person the permit is issued to and
another copyforthe building permitfles. neTreatmentCert. icateshalt
provide the product used, identity of the applicator, time and date ofthe
treatment, site location, area treated, chemical used, percent concentration
and number ofgallons used, to establish a verifiable record ofprotective
treatment. If the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior toftnal building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
❑ Perimeter for Final Inspection
el�4 —
ignature of exterminator
NOTE:
There must be a completed form for each required treatment or re -treatment and this form mast be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will
fail and a re -inspection fee charged.
Revitcd 6/l3/02 dm0