Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATESt Lucie County Inspections h, 2 0 2007 2300 Virgi>'a avenue Ft Pierce FL 349p Public Works St. Lucie County, FL (772)462-2172 SCANNED BY CERTIFICATE OF TERMITE TREATMENT St Lucie County CONSTRUCTION SOIL TREATMENT :PERMIT# c77��3—oK(7 JOB 'PEST CONTROL CONTRACTOR qaV' I PEST CONTROL LICENSE # I � 4 l �J_ S�u I Cam{ We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated:._Chemicals used: &Ibv-Z Percentage of solution: r 25.fo Date of treatment: 6 ` / 9 - 0? ❑ Footing ❑ 1st Treatment ❑ Re -treat Slappb�� ll_I-Ist Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ IstTreatment ❑ Re -treat ❑ Other ❑ 1 st Treatment ❑ Re -treat Total gallons used: Time of Treatment: k'BC104.2.6 Certificate of Protective Treatment forprevention offermites. A weather resistant jobsitd posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed providing a copy for rite person the permit is issued to and another copyforthe building permitfles. neTreatmentCert. icateshalt provide the product used, identity of the applicator, time and date ofthe treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior toftnal building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Perimeter for Final Inspection el�4 — ignature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form mast be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revitcd 6/l3/02 dm0