HomeMy WebLinkAboutENERGY EFFICIENCY CODEWhole Building Performance Method for Commercial Buildings Form 40OA-97 ,
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-97 Version 2.2
:PROJECT NAME_DRAWDY BROS CONST
PERMITTING OFFICE:
ADDRESS: _MIDWAY RD
_Fort Pierce
CLIMATE ZONE: 6
'OWNER: _PHIL DRAWDY
PERMIT NO:
AGENT:
JURISDICTION NO: 661100
BUILDING TYPE: _Business (Office)
earm �� g9D3lcloo
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _4171
NUMBER OF ZONES:
1
MAX. TONNAGE OF EQUIPMENT PER SYSTEM:
0
COMPLIANCE CALCULATION:
cqN/'/
METHOD A
DESIGN
CRITERIA91
RESULT
--------;---------
------
-------- l� .eY F®------
C�@
A. WHOLE BUILDING
62.53
100.00
CO
PASSES
4n�
PRESCRIPT.I.VE REQUIREMENTS:
LIGHTING'
EX IOR LIGHTING
50.00
75.00
PASSES
LIGHTING CONTROL REQUIREMENTS
PASSES
HVAC EQ IPMENT
COOLING EQUIPMENT
1. SEER
12.40
10.00
PASSES
HEATING EQUIPMENT
1. Et
10.00
N/A
AIR DiISTRIBUTION SYSTEM INSULATION
REQUIREMENTS
1. (Unconditioned Space
6.00
4.20
PASSES
REHEJ�T SYSTEM TYPES USED
1 0 REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT
1.EF
0.92
0.88
PASSES
2. REF 7
0.92
0.88
PASSES
PIPING INSULATION REQUIREMENTS
----- 1--Circulating
-----------------------1_50-----------0_78-----------PASSES
COMPLIANCE CERTIFICATION:
I herebyI certify that the plans and
specifications covered by this calcu-
lation are -incompliance with the
Florida Energy/-�fficier Code. __
DATE:
I herebyi certify that this building is
in compliance with the Florida Energy
Efficiency Code.
Review of the plans and specifica-
tions covered by this calculation
indicates compliance with the
Florida Energy Efficiency Code.
Before construction is completed,
this building will be inspected
for compliance in accordance with
Section 553.908, Florida Statutes.
BUILDING OFFICIAL:
DATE:
DATE: I
I hereby certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
SYSTEM DESIGNER REGISTRATION/STATE
PLUMBING .
JUIUnl"1NU
'•(*) Signature is required where Florida law requires design to be performed
by registered design professionals. Typed names and registration numbers may
be used Iwhere all relevant information is contained on signed/sealed plans.
----------------------------------------------------------------------------
----------------------------------------------------------------------------
BUILDING ENVELOPE SYSTEMS COMPLIANCE
CHECK
401.=--,--GLAZING--ZONE
1------------------------------------------------v-
Elevation
Type U SC VLT Shading Area(Sgft)
--------
North
---------------- ---- ---- ---- -------------- ----------
Residential 1.23 1.0 ill
North
Residential 1.23 1.0 32
North
Residential 1.23 1.0 24
North
Residential 1.23 1.0 48
South
Residential 1.23 1.0 90
'.West
Residential 1.23 1.0 42
Total Glass Area in Zone 1 = 348
Total Glass Area = 348
402. ------
WALLS --ZONE 1------------------------------------------------
---
Elevation
Type U Insul R Gross(Sgft)
-------
North
--------------------------------- ----- ------- -----------
8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4.2 751
East
811CMU/3/411ISO Btwn 24"oc/5/8"Gyp 0.151 4.2 448
South
8"CMU/3/4"ISO.Btwn 24"oc/5/8"Gyp 0.151 4.2 751
West
8"CMU/3/4"IS0 Btwn 24"oc/5/8"Gyp 0.151 4.2 448
Total Wall Area in Zone 1 = 2398
Total Gross Wall Area = 2398
403.---
--DOORS-=ZONE 1------------------------------------------------
---
Elevation
Type U Area(Sgft)
-------
East
------------------------------------------- ----- ----------
1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 20
Total Door Area in Zone 1 = 20
Total Door Area = 20
404-------
ROOFS --ZONE 1------------------------------------------------
---
Type .
Color U Insul R Area(Sgft)
------
Shngl/1
---------------------------- ------ -----------------------
211WD Deck/WD Truss/6"Ba Light 0.040 19 4153
Total Roof Area in Zone 1 = 4153
Total Roof Area = 4153
405.---
-FLOORS-ZONE 1------------------------------------------------
---
Type 1
Insul R Area(Sgft)
------------------------------------------------
Slab on
-----------------
Grade/Uninsulated 0 4153
Total Floor Area in Zone 1 = 4153
Total Floor Area = 4153
406-------
INFILTRATION --------------------------------------------------
---
CHECK
Inf'ltration
Criteria in 406.1.ABCD have been met.
MECHANICAL SYSTEMS
-----------------------------
CHECK
HVAC
------------------------------------- ----
load sizing has been performed. (407.1.ABCD)
---
407-------
COOLING SYSTEMS-----------------------------------------------
---
Type------------------------
No Efficiency IPLV Tons
1. Split
------------- -------------------
System 4
408.------HEATING
SYSTEMS----------------- ---12_4----3_4------------0_00
---
TyPe
No Efficiency
1. Electric Electric
------------ --------------
Resistance 4 10-----------34_4
409.----I--VENTILATION------------------------------------
---
Ventilation Criteria in 409.1.ABCD have been met.
410.--"1 -AIR DISTRIBUTION SYSTEM----------------------------------- ---
CHECK
------------------------------------------------------------ ---- ---
Duct sizing and design have been performed. (410.1.53CD)
AHUIType Duct Location R-value
----------------------------------------------------------------
1. Air Conditioners Unconditioned Space 6
CHECK
-
--------------------------------------------------------
---------
Testing and balancing will be performed. (410.1.ABCD)
411.---i-PUMPS AND PIPING -ZONE -------------------- - -------------------- ---
Basic prescriptive requirements in 411.1.ABCD have been met.
PLUMBING SYSTEMS
411.---i-PUMPS AND PIPING -ZONE I---------------------------------------
Type
R-value/in Diameter Thickness
1. Circulating
5 1 1.50
412.---ii-WATER
HEATING SYSTEMS -ZONE 1----------------------------------
---
Type
Efficiency StandbyLoss InputRate Gallons
i. Electric(<=12
KW) .92 0 42 40
2.
.92 0 42 40
CHECK
413------ ELECTRICAL POWER DISTRIBUTION---------------------------- ----- ---
Met ring criteria in 413.1.ABCD have been met.
414.--- -MOTORS--------------------------------------------------- ----- ---
Motor efficiencies in 414.1.ABCD have been met.
415------ LIGHTING SYSTEMS -ZONE 1--------------------------------------- ---
Space Type No Control Type 1 No Control Type 2 No Watts Area(Sgft)
--------- ----------------- ----------------- --- ------ ----------
Accounting 1 On/Off 5 8759 4153
Total Watts for Zone 1 = 8759
Total Area for Zone 1 = 4153
Total Watts = 8759
Total Area = 4153
Lighting criteria in 415.1.ABCD have been met.
-------------------------------------------------------- ----- ---
16. Operation/maintenance manual will be provided to owner.(102.1)
----------------------------------------------------------------------------
PROJECT PITLE DRAWDY BROS CONST
BUILDING TYPE Business (Office)
BUILDING LOCATION Fort Pierce
BUILDINGI AREA (ft2) 4171
BUILDING ANNUAL ENERGY USE
DESIGN BUILDING BASELINE BUILDING
(o) 1 (%-)
HEATINGIENERGY
Electric Resistance 5.78
COOLINGiENERGY
HOT WATER ENERGY
Electric DHW System(s) 2.71 2.84
BUILDING MISCELLANEOUS
Light 48.84 48.63
Equipient 10.98 10.98
SYSTEM MISCELLANEOUS
Fans I 31.77
PLANT
TOTAL ENERGY CONSUMPTION :
62.53
******* PASSES ******
I
PROJECT TITLE DRAWDY BROS CONST
BUILDING TYPE Business (Office)
BUILDING LOCATION : Fort Pierce
BUILDING AREA(ft2): 4171
DESIGN :
Lighting Power 50 W
100.00
EXTERIOR LIGHTING CRITERIA:
AREA AREA AREA OR ALLOWANCE
CODE DESCRIPTION LENGTH WATTS
1 Exit (with or without canopy) 3.00 75.00
Exterior Lighting Power Allowance 75.00 W
******** PASSES ********
SYSTEM CONTROL REQUIREMENTS:
SPACE NO. CONTROLS CONTROL POINTS
NQ. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 NO. DESIGN CRITERIA
28 Accounting 4153.3 1 On/Off 5 0 5= 5
I ******** PASSES ********
PROJECTITITLE DRAWDY BROS CONST
*.BUILDING TYPE Business (Office)
BUILDING LOCATION : Fort Pierce
BUILDING AREA(ft2): 4171
HVAC SYSTEM REQUIREMENTS:
CoolinglSystem
Measure
Minim.
Minim.
System
System
Result
Result
Type
#1 #2
#1
#2
Eff.#1
Eff.#2
for #1
for #2
Split Sys.
SEER
10.00
0.00
12.40
3.4.0
PASSES
Heating
System
Measure
Minimum Reg.
Efficiency
Result
Ele. Resis.
Et
10.00
N/A
******** PASSES ********
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS:
Zone # IDuct Location Minimum R-Value Design R-Value Result
1. Unconditioned Space 4.20 6.00 PASSES
I ******** PASSES ********
PROJECTiTITLE DRAWDY BROS CONST
BUILDING TYPE Business (Office)
BUILDING LOCATION : Fort Pierce
BUILDING AREA(ft2): 4171
WATER HEATING SYSTEM REQUIREMENTS
System
Measure
Minimum
Maximum
Design
Design
Result
T1pe
EF / Et
SL
EF / Et
SL
Electric <= 12kW
EF
0.8770
0.0000
0.920
0.000
PASSES
Electric <= 12kW
EF
0.8770
0.0000
0.920
0.000
PASSES
******** PASSES ********
PIPING INSULATION REQUIREMENTS:
Pipe Insulation Thickness(in)
System Type I O.D.(in)l Minimum Reg. Design Result