Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODEWhole Building Performance Method for Commercial Buildings Form 40OA-97 , ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 :PROJECT NAME_DRAWDY BROS CONST PERMITTING OFFICE: ADDRESS: _MIDWAY RD _Fort Pierce CLIMATE ZONE: 6 'OWNER: _PHIL DRAWDY PERMIT NO: AGENT: JURISDICTION NO: 661100 BUILDING TYPE: _Business (Office) earm �� g9D3lcloo CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _4171 NUMBER OF ZONES: 1 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 0 COMPLIANCE CALCULATION: cqN/'/ METHOD A DESIGN CRITERIA91 RESULT --------;--------- ------ -------- l� .eY F®------ C�@ A. WHOLE BUILDING 62.53 100.00 CO PASSES 4n� PRESCRIPT.I.VE REQUIREMENTS: LIGHTING' EX IOR LIGHTING 50.00 75.00 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQ IPMENT COOLING EQUIPMENT 1. SEER 12.40 10.00 PASSES HEATING EQUIPMENT 1. Et 10.00 N/A AIR DiISTRIBUTION SYSTEM INSULATION REQUIREMENTS 1. (Unconditioned Space 6.00 4.20 PASSES REHEJ�T SYSTEM TYPES USED 1 0 REHEAT SYSTEM is USED WATER HEATING EQUIPMENT 1.EF 0.92 0.88 PASSES 2. REF 7 0.92 0.88 PASSES PIPING INSULATION REQUIREMENTS ----- 1--Circulating -----------------------1_50-----------0_78-----------PASSES COMPLIANCE CERTIFICATION: I herebyI certify that the plans and specifications covered by this calcu- lation are -incompliance with the Florida Energy/-�fficier Code. __ DATE: I herebyi certify that this building is in compliance with the Florida Energy Efficiency Code. Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. Before construction is completed, this building will be inspected for compliance in accordance with Section 553.908, Florida Statutes. BUILDING OFFICIAL: DATE: DATE: I I hereby certify(*) that the system design is in compliance with the Florida Energy Efficiency Code. SYSTEM DESIGNER REGISTRATION/STATE PLUMBING . JUIUnl"1NU '•(*) Signature is required where Florida law requires design to be performed by registered design professionals. Typed names and registration numbers may be used Iwhere all relevant information is contained on signed/sealed plans. ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- BUILDING ENVELOPE SYSTEMS COMPLIANCE CHECK 401.=--,--GLAZING--ZONE 1------------------------------------------------v- Elevation Type U SC VLT Shading Area(Sgft) -------- North ---------------- ---- ---- ---- -------------- ---------- Residential 1.23 1.0 ill North Residential 1.23 1.0 32 North Residential 1.23 1.0 24 North Residential 1.23 1.0 48 South Residential 1.23 1.0 90 '.West Residential 1.23 1.0 42 Total Glass Area in Zone 1 = 348 Total Glass Area = 348 402. ------ WALLS --ZONE 1------------------------------------------------ --- Elevation Type U Insul R Gross(Sgft) ------- North --------------------------------- ----- ------- ----------- 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4.2 751 East 811CMU/3/411ISO Btwn 24"oc/5/8"Gyp 0.151 4.2 448 South 8"CMU/3/4"ISO.Btwn 24"oc/5/8"Gyp 0.151 4.2 751 West 8"CMU/3/4"IS0 Btwn 24"oc/5/8"Gyp 0.151 4.2 448 Total Wall Area in Zone 1 = 2398 Total Gross Wall Area = 2398 403.--- --DOORS-=ZONE 1------------------------------------------------ --- Elevation Type U Area(Sgft) ------- East ------------------------------------------- ----- ---------- 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 20 Total Door Area in Zone 1 = 20 Total Door Area = 20 404------- ROOFS --ZONE 1------------------------------------------------ --- Type . Color U Insul R Area(Sgft) ------ Shngl/1 ---------------------------- ------ ----------------------- 211WD Deck/WD Truss/6"Ba Light 0.040 19 4153 Total Roof Area in Zone 1 = 4153 Total Roof Area = 4153 405.--- -FLOORS-ZONE 1------------------------------------------------ --- Type 1 Insul R Area(Sgft) ------------------------------------------------ Slab on ----------------- Grade/Uninsulated 0 4153 Total Floor Area in Zone 1 = 4153 Total Floor Area = 4153 406------- INFILTRATION -------------------------------------------------- --- CHECK Inf'ltration Criteria in 406.1.ABCD have been met. MECHANICAL SYSTEMS ----------------------------- CHECK HVAC ------------------------------------- ---- load sizing has been performed. (407.1.ABCD) --- 407------- COOLING SYSTEMS----------------------------------------------- --- Type------------------------ No Efficiency IPLV Tons 1. Split ------------- ------------------- System 4 408.------HEATING SYSTEMS----------------- ---12_4----3_4------------0_00 --- TyPe No Efficiency 1. Electric Electric ------------ -------------- Resistance 4 10-----------34_4 409.----I--VENTILATION------------------------------------ --- Ventilation Criteria in 409.1.ABCD have been met. 410.--"1 -AIR DISTRIBUTION SYSTEM----------------------------------- --- CHECK ------------------------------------------------------------ ---- --- Duct sizing and design have been performed. (410.1.53CD) AHUIType Duct Location R-value ---------------------------------------------------------------- 1. Air Conditioners Unconditioned Space 6 CHECK - -------------------------------------------------------- --------- Testing and balancing will be performed. (410.1.ABCD) 411.---i-PUMPS AND PIPING -ZONE -------------------- - -------------------- --- Basic prescriptive requirements in 411.1.ABCD have been met. PLUMBING SYSTEMS 411.---i-PUMPS AND PIPING -ZONE I--------------------------------------- Type R-value/in Diameter Thickness 1. Circulating 5 1 1.50 412.---ii-WATER HEATING SYSTEMS -ZONE 1---------------------------------- --- Type Efficiency StandbyLoss InputRate Gallons i. Electric(<=12 KW) .92 0 42 40 2. .92 0 42 40 CHECK 413------ ELECTRICAL POWER DISTRIBUTION---------------------------- ----- --- Met ring criteria in 413.1.ABCD have been met. 414.--- -MOTORS--------------------------------------------------- ----- --- Motor efficiencies in 414.1.ABCD have been met. 415------ LIGHTING SYSTEMS -ZONE 1--------------------------------------- --- Space Type No Control Type 1 No Control Type 2 No Watts Area(Sgft) --------- ----------------- ----------------- --- ------ ---------- Accounting 1 On/Off 5 8759 4153 Total Watts for Zone 1 = 8759 Total Area for Zone 1 = 4153 Total Watts = 8759 Total Area = 4153 Lighting criteria in 415.1.ABCD have been met. -------------------------------------------------------- ----- --- 16. Operation/maintenance manual will be provided to owner.(102.1) ---------------------------------------------------------------------------- PROJECT PITLE DRAWDY BROS CONST BUILDING TYPE Business (Office) BUILDING LOCATION Fort Pierce BUILDINGI AREA (ft2) 4171 BUILDING ANNUAL ENERGY USE DESIGN BUILDING BASELINE BUILDING (o) 1 (%-) HEATINGIENERGY Electric Resistance 5.78 COOLINGiENERGY HOT WATER ENERGY Electric DHW System(s) 2.71 2.84 BUILDING MISCELLANEOUS Light 48.84 48.63 Equipient 10.98 10.98 SYSTEM MISCELLANEOUS Fans I 31.77 PLANT TOTAL ENERGY CONSUMPTION : 62.53 ******* PASSES ****** I PROJECT TITLE DRAWDY BROS CONST BUILDING TYPE Business (Office) BUILDING LOCATION : Fort Pierce BUILDING AREA(ft2): 4171 DESIGN : Lighting Power 50 W 100.00 EXTERIOR LIGHTING CRITERIA: AREA AREA AREA OR ALLOWANCE CODE DESCRIPTION LENGTH WATTS 1 Exit (with or without canopy) 3.00 75.00 Exterior Lighting Power Allowance 75.00 W ******** PASSES ******** SYSTEM CONTROL REQUIREMENTS: SPACE NO. CONTROLS CONTROL POINTS NQ. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 NO. DESIGN CRITERIA 28 Accounting 4153.3 1 On/Off 5 0 5= 5 I ******** PASSES ******** PROJECTITITLE DRAWDY BROS CONST *.BUILDING TYPE Business (Office) BUILDING LOCATION : Fort Pierce BUILDING AREA(ft2): 4171 HVAC SYSTEM REQUIREMENTS: CoolinglSystem Measure Minim. Minim. System System Result Result Type #1 #2 #1 #2 Eff.#1 Eff.#2 for #1 for #2 Split Sys. SEER 10.00 0.00 12.40 3.4.0 PASSES Heating System Measure Minimum Reg. Efficiency Result Ele. Resis. Et 10.00 N/A ******** PASSES ******** AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS: Zone # IDuct Location Minimum R-Value Design R-Value Result 1. Unconditioned Space 4.20 6.00 PASSES I ******** PASSES ******** PROJECTiTITLE DRAWDY BROS CONST BUILDING TYPE Business (Office) BUILDING LOCATION : Fort Pierce BUILDING AREA(ft2): 4171 WATER HEATING SYSTEM REQUIREMENTS System Measure Minimum Maximum Design Design Result T1pe EF / Et SL EF / Et SL Electric <= 12kW EF 0.8770 0.0000 0.920 0.000 PASSES Electric <= 12kW EF 0.8770 0.0000 0.920 0.000 PASSES ******** PASSES ******** PIPING INSULATION REQUIREMENTS: Pipe Insulation Thickness(in) System Type I O.D.(in)l Minimum Reg. Design Result