Engineering has reviewed the paving and drainage as-builts for this project and are accepting them
for completion at this time. A copy of the Engineer's certification is attached for your records.
If I can be of further assistance to you in this matter, please let me know.
CAG:ewc
Attachment as noted''
cc: Donald West, P.E., County Engineer
Culpepper & Terpening
U
NOV 0 3 1999
St. Lucie County Public Works
Consulting Engineers • Land Surveyors
2980 South 25th Street • Ft. Pierce, FL 34981
P.O. Box 13360 • Ft. Pierce, FL 34979-3360
(561) 464.3537 • Fax (561) 464.9497
October 29, 1999 J06641me6
HAND DELIVER TO: Sr t"cBy
ie COU11
Mr. Charlie Cangianelli
Building & Zoning Manager
St. Lucie County
2300 Virginia Avenue
Fort Pierce, Florida 34982
Re: Drawdy Office Complex
Certification of Completion
Dear Mr. Cangianelli:
ty
e0l i 0-
qqo
6127
I hereby certify that with the exception of the proposed curbing that we discussed previously all of
the County required improvements have been completed on the Drawdy Office Complex project
and that I have inspected the construction. Inspection was done incrementally in accordance with
the requirements of "Standard Specifications for Public Works Construction, St. Lucie County,
Florida" and we have reviewed the results and certification of the independent testing laboratory.
These improvements are in substantial conformance with the development plans and the Standard
Specifications as prepared by this office, with the exception of the aforementioned curbing.
Please find enclosed two (2) copies, as well as a mylar reproducible of Sheet 1 & 3 of 3 with the
As -Built information for the paving, grading and drainage portions of the project indicated, as well
as a complete set of density test results as conducted by Fraser Engineering & Testing.
If there are any further questions or comments with regard to these matters, please do not hesitate to
contact this office.
Sincerely,
CULPEPPER & TERPENING, INC.
Dawn R. Hilton, PE
Project Engineer
FL Registration #44931
Enclosures
cc: Mr. Phil Drawdy
CN�V 0 C--0 ���c`N°`Ks
dd.Aar /987a3
FROM Culpepper6Terpening 5614649497 10-12-99 03:1BPM TO �^ 4BZ1140 474 P.2/2
�! CITY OF PORT ST. LUOIE
i UTILITY SYSTEMS DEPARTMENT
9W Sp Ogden Lane
Port St. Luols. FL 34983
(561) 87"400
(681) 873-84*5 Fax
Gary L. Dedham, PE., P.L.S.. Pire4tor
:00ctober 12, 1909
W Courier and FeG Mle 464-9497
.I
awn R. Hilton, P.E.
ulpepper & Terpening, Inc.
.O. Box 13360
Drt Pleroe, FL 34979-3360
°914�c•eYNE®
County
Drawdy Construction / 2945 W. Midway Read
Nis. Hilton:
OCT 1
St, Lucie County Public Works
'7�pe ml-1'
9903a78q
As you are aware, a CommerGal Senr)oe Agreement / Pemllt To Connect for water service
ms executed by Ali. Phil Drawdy of Drawdy Construction on August 17, 1999. Mr. Drawdy
executed an agreement for sewer service an October 6, 1999.
i
;Upon receipt to the two referenced agrealnenta and tale acoompabying applicable fees, the
;City of Port St. Lucie Utility Systems Department (normally agreed to provide water and
wastewatar services to the subject site.
:Should you have any questions or require additional information, please feel free to contact
.our Technical Services Division by calling 073-6400.
;Gary L. Basham, P.E. P.L.S.
1:11.11tility Systems Director
1 �GLEJdmr
1;`e: Donna M. Rhoden, Technical Services Manager
Phil Drawdy, Drawdy Construction (facsimile 0 484-2031)
0 C T 12 1999
St. Lucie County Public Works
9�D387g St. Lurie Truss Corp.
10331 Ldimard Rd., Port St. Lucie, FL 34952
Ph. (561) 335-3207 Fax (561)-335-3209
E-mail sltruss@tcoast.4ez.com ~
Drawdy Brothers Construction June 30, 1999
1216 Bell Avenue
Fort Pierce, FL 34982 S,
C
Re: Roof truss system d'f4 eyNF0
New construion
Midway Rd,ctWhite City officevc�e Coon
tp
To Whom It May Concern:
An inquiry has been made as to how many 1 Od x 1 '/2"nails are required in a Hughes
HTA20 truss anchor to satisfy the uplift requirements for the common trusses on this
project. The HTA20 truss anchor is a 16ga. metal strap anchor embedded into a concrete
beam. This strap is made in three lengths, 16", 20", and 24". The last two numbers in
the product code designate the length of the strap so the strap in question has a length of
20". In all other structural aspects the straps are identical with the longer straps having
more nailing area for larger uplift requirements.
In reviewing the engineering for the 51' span roof trusses, the worst case uplift for a
common truss or common hip truss is less than 1380#. To satisfy this value a minimum
of 10 nails must be used. Less nailing may be used for uplifts of lesser value per the
chart below. All nails are to be 1 Od x 1 '/2".
Uplift Value
Nails Required
985
6
1312
8
1640
10
1968
12
2000
14