Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODEW.holejBuilding Performance Method for Commercial Buildings Form 40OA-97 • rxv�c� -ADJRE 'OWNER ,GENT n rrr r n DESIc COND: COMP: METH( A. W. PRES, LIGH '.L HVAC ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION . Florida Department of Community Affairs FLAICOM-97 Version 2.2 NAMI PV -0 1260 PERMITTING OFFICE: Orlando CLIMATE ZONE: 5 PERMIT NO: _ JURISDICTION NO:_582100 NG TYPE: _Business (Office) �er m�i U 1)(2. UCTION CONDITION: New construction COMPLETION: 'Finished Building .TONED FLOOR AREA: _654 NUMBER OF ZONES: 1 ONNAGE OF EQUIPMENT PER SYSTEM: 3 CALCULATION: A DESIGN CRITERIA RESULT ----------- -------------- ------ SE BUILDING 54.36 100.00 PASSES LPTIVE REQUIREMENTS: iffir f3TING CONTROL REQUIREMENTS PASSES :?UIPMENT LING EQUIPMENT . SEER 10.00 9.70 PASSES HEATING EQUIPMENT 11. Et 1.00 N/A AIR,DISTRPBUTION SYSTEM INSULATION REQUIREMENTS' 11--Ventilated 6..00 6.00 PASSES REHEAT SYSTEM TYPES USED I NO REHEAT SYSTEM is USED WATER HEATING EQUIPMENT F ;11. .EF 1 0.93 0.93 PASSES PIPING INSULATION REQUIREMENTS 11. Circulating 1 1.00 1.00 PASSES ---- -----:___,------------------ ----------------------------------------- -COMPLIANCE CERTIFICATION: I hereby cent fy;•that)t.ie plans and Review of the plans and specifica- specafications'covered,'by.this calcu- tions covered by this calculation lation are in co-41 iance with the indicates •compliance with the Florida Er-ergy f sc n¢y Code. Florida -Energy Efficiency Code. PREPARED BY: Before construction is completed, DATE-' this building will be inspected for compliance in Id nc with . I 'her' e' y certify that :his building' is Section-553.908, F S ' s.:in Comp1'iance with the Florida'Energy BUILDI_W_OEF�CIAL: Efficiency Code DAT MAf2 0 8`OWNER/AGAPPROVED BY INPINC. BUILDING ENVELOPE SYSTEMS COMPLIANCE CHECK 401.--�---GLAZING--ZONE 1------- --------------------------------------- U SC VLT Shading Area(Sgft) Elevation Type ---- ---- ---- =----------------------- __ - --------------- 44 East Commercial 1. 0.7 1.0 None 26 West Commercial 1. 0.7 1.0 None 9 West Commercial 1. 0.7 1.0 None 79 Total Glass Area -in Zone 1 Total Glass Area = 79 ------------------------- --- 402.--.---WALLS--ZONE 1----------------------- U Insul R Gross(Sgft) . F.,,devataon Type ----------------------- ----------------------- North FRAME 4" 0.081 0.0 93 South FRAME 4" 0.081 0.0 93 West FRAME 4" 0.081 0.0 448 East FRAME 4" -0.081 0.0 448 Total" Wall- Afea in Zone 1 I083 Total Gross Wall Area = 1083 403•------DOORS--ZONE_ 1------------------------=------------------- --- ---- Elevatzon Type U Area(Sgft) -------------------------------------- ---- ----- ---------- West 1-314 Steel Door -Paper Honeycomb core 0.56 20 East 1.75 FRENCH/FRENCH 1-LITE 1.31 40 Total Door Area in Zone 1 = 60 Total Door Area = 60 404.-----RO0FS--ZONE 1--------- ----------- -------r--------------(-4 -� --- Type Color - U. Insul R Area S ft - -----i-- -------------------^--^------; ----- ^---------------- STD. ROOF Light 0526 19 654 Total Roof Area in Zone 1 = 654 Total Roof Area 654 405.-T ---- FLOORS -ZONE I -----------------^ ----_------------------ - -- Type Insul R Area(Sq€t) -----; -------------------P-------------------= ------------- Floor over Unconditioned S ace/Insulated l'I 654 Total Floor Area, in Zone 1 = 1654 Total 'Floor Area,= 654 406.----,-INFILTRATION-------- ------------ --------- --------------------- --- "- (CHECK Infiltration Criteria in 406.I.ABCD have been met. MECHANICAL SYSTEMS CHECK HFTAC load sizing has been performed. -'(407'.1.ABCD) 407. IL -' -COOLING SYSTEMS --------------- =--?---------------------------- Type No E?fa,oiency IPLV i .1 Tons -'-' -�------------------------- =_-__ - ----- ---------- 1. single Package 1 . _ "1,0:0 -, 1.0 . 3.00 408.7-7---HEATING SYSTEMS--- ---- ----------------= -�-- -- llrype No a,Efficiency BTU/hr __ _ __ 1. Electric Resistance ;„ 1 {5' 1.036000 409------VENTILATION -------- -- --- --,-, - - ---- I' CHECK Ventilation Criteria in 409 3.AHCD have beezj. A {{ J 0' ------------------------------ --- 0 '---!--AIR DISTRIBUTION SYSTEM---------- CHECK - --------------------------------------- --- Duct sizing and design have been performed. (410.I.ABCb) AHU Type Duct Location R-value. --------------------------------- ------- ------- 1. Air Conditioners Ventilated 6 -_ . ------ CHECK ------------------------------------------=-------------- --- Tel and balancing will be performed. (410.1.ABCD) 411.-- tiPUMPS AND PIPING -ZONE ----------------------------------------- -- Basic prescriptive requirements in 411.1.ABCF7 have been met. 1" 1. Ci 412.-- PLUMBING SYSTEMS --PUMPS AND PIPING -ZONE 1 R-value/in Diameter Thickness ------------------- ,ulating - ---------- 3.63' -------- .75 --------- 1,0 --WATER HEATING SYSTEMS -ZONE 1---------------------------------- Efficiency StandbyLoss InputRate Gallons -------------------- ;trdc(<=12 KW), ---------- ---------- .93 .45 ----------•---------- 1.5'.;._ 0 ELECTRICAL SYSTEMS CHECK 413.-- ELECTRICAL POWER DISTRIBUTION------- —------------------ ----- --- Metering criteria in 413.1.ABCD have been met.- 414------ MOTORS ------------------------------=----- --------- -=---- ----- --- Motor efficiencies in 414.1.ABCD have been mgt. I ' ONE space ---LIGHTING SYSTEMSy eI- Iy----------- pe - - o ------ 1 Area(Sgft) --- Space Type No Control .Type 1 No Control Type 2 No Watts Area(Sgft) Readig, T 1 No'.visual task 2 None 0 302 1'19 Reading, T I No visual task 2 None 0 302 -99 Reading, T .1 No visual task .2 None 0 151 206 Toilei and 1 No visual task :,l None 0 60 45 16. Total Watts for Zone 1 = 816 .. Total -Area for Zone 1 = 469 Total Watts = 816 Total Area = 469 CHECK' :ghting criteria in 415.1.ABCD have been met. --------- ----- ------------------ -------- ----- >eration/maintenance manual will be provided to owner.(102.I). , ----------------------------------------------------- J fa rl �.