HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE08-26-'19 13:07 FROM-
7728787656 «; T-889 P0001/0001 F-454
12l/--C�f 27)
�c��14� r
Mill 'n
� Nam ° Eb s
d��8� . 13y AUG26100
ie. # y,�
FOX77Z�LF�2�+ JnVermittin9 Department
§�: 6N@l@ fet my
R•egitii tf*t :gU-Vay'Tef4ot 'ry-Pdwer-Retease
Date: 7 -,�-3-0 _
ftledAddrew.
Per/It ftmbw, �\ �_1 1
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELE=CgL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT 70. EXCMDTHIRTY.($U) DAYS, FOR THE PURPOSE Ol= TESTING SYSTEMS
AND EQUIPMENT IN PRERM71CU FOR A FtL1fAL INSPE;CMN. Ey ODNSIDERA7iON OF APPROVAL OF THE
RE Si W€ HERE ' ACfChfO ANIJ AGME ASFOLLOWS:
1. This temporary power release is requested ;For the above staled R Pase Only, and t wm will be no
Occupancy of any tYpe, other than that petnritted by caiistnrcUon during Uvs time period.
2. As witness by our OgnaUzes, yt herdby Wep th abide by oil terms and conditions of this agreemerh,
Induding Building Division POlfcy, which is incorporated herein by M*MnM..
3. All condrbonsAnd requirerffentifisfAd In the attedied document entitled "Retjuiremettsfor 3n Day
Power'for TjmW havebeen fulfilled and the premise is ready for compiiance Inspection.
4. All requests for an odension beypnd 3D days must be made in wri+3itg to the auliding oMdal statiM
the reason for the request Power maybe Mmoveditm the site and/or a Stop Work Order issued if
the Finai'LispecUon has dot been approved *Min 30'days. A fee of $wO.OD win be required to Mt
the Stop Work Order.
WE HERMY RE XASE-AND AGREE TO HOLD HARMLESS; ST. LUCIE -COUNTY, AND THEM EMPLOYEES FROM
ALL LMBIL.ITIES AND.CLAIMS OF ANY T`6PE,.OF NATURE WHjCH MAY ARISE NOW OR IN THE RnM OUT
OFMlS 71�UVSACTIgIV, INCLUDING ANY DAMAG;EWMCIfMAY $E IN( UigRED DUETA THE
DISCONNi�I`ION'OF SZCMCAL PpWEtt IM THE' EVENTOF W0LA7ION OF THM AQUEMBIff,
07-23-' 19 09:39 FROM- 40
7728787656 T-793
Ink ft.
dt 010rikes
is MO..
,K,Uft2.
65- fax772-462-6443
Datw 7 L'3�_19 Pem% Marnber.
",dAdd... _r-S
P0006/0008 F-270
SCANNED
BY
St Lucie county
THE UNDERSIGNED HEREBY REQUEST PaasE of ELE=cAL
PROPERTY, FORA PERIOD NOTTO ExCEED7MM (30),pAy POWER TO THE AEOVE DESCRIBED
AND EQUIPMENT IN PREPARATION FOR A 'S, FOR THE PURPOSE OFTeMG SySTD4S
PE f ELrAL 'NSPE=N. IN CONSID8RATION OF APPROVAL OF THE
. WE5T WE HERWY AdNOWIME ANb AGkEE 'AS FbLLoW&-
I. This temporary power release is requested for the above stated purpose only, and them WM be no
C=pancy of any tYOk Other Man that pmmued tBr wrMrimuon dUring this tirro period.
2. At witness by our V91awes, We heKbY agree to abide by a ba= and conditions of this a mert,
including Building orvisign mliq, whkh is incorporated Mmn by reference gme
3. Al conditionsand requilthentsfted in the attathed doamlen , t entitled nReqt&=&
Power for Tje9ffngwhave*be6 ftMiedaind ffie premise rft lbr 30 Day
is ready for compliance inspection.
.4- All requests for an Wbenon beyond 30 days must be anode in mMny to #ia Building OffidWs=nq
the nMon'fbrfhe reqLret POW& May be TeMOVedftm the site and/or a Stop w
the r jrr al. ork order issuedy
'L5PeWon h�$ not been aPPY�VM �fil]Ifn 30 daW ACoe of$j0o.WVwjjberequired t0,fft,
the Stop Work Order.
WE HERBY RELEASE•AND-AGREE TO HOLD
H'AAMLESS, . ST. LUCIE ODUNT)r, AND THEIR EMPLo
ALL LDk YEES FROM
MLrrMS AND CLAZMS'OF ANY TYPE M4�dai MAY ARISE NOW. OR IN THE RMIRE OUT
OF THIS TPANSACTIOh, INCLU DI N G ANY I Yk4AqE VVf fICli'�iMy BE INCUR - DUE TO' THE
101�lIoN OF EUSCMCAL POWER M THE EW4r6FXa0LA7ION &7HK AaRFpmmrr
IRE E_�
NED
JULJ2 3 2019
U
Permitting Department
County,
L
StTucLie Coun'ty,' FL