HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE19 12:01 FROM-
7728787656
T-890 P0001/0001 F-460
sent
M772-462-15443
keq64kfiar .30-Ofa,yTerAparziry:Pdwer]Refdage
7-
2-3-19
Addrew, Is
WE
Permit ftkaber
M I am
SCANNED
BY
St Lucie County
UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
)ERTy, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAys, FOR THE PURPOSE OF TFSM(; SYMMS
EQUIPMENT IN PREPARAIICN FOR Ar-INALINSPECtMN. IN CONSIDERATION OF APPROVAL OF THE
JEST WE HERE& ACKNOWLEDGE AND AQEE-AS FOLLOWS,
i. 7his tEMPOMY Power release is requested .for the above -ztatnd purpose oft and there willoe no
occupancy of any tAv, other than that permitted by construction during this time Period.
2. As witness by our signatures, We hereby agree to abide by a Terris and coridiflons of this agreement,
including Budding Division Policy, vach is Incori5dc2ied hdivm by reference.
I All c6nditionsarld requirements fisted in the atWthed document entitled "Requirements for 3a Day
Power for Testing- hav4D baen tufted and the Premise Is ready for compliance inspection.
4- All requests for an Cdmmsion beyond 3.0 days must be: made in writing to the Budding Offlcial stating
the reason bribe request Power maybe removtflrom the site andfor a Stop ft&Order issuedif
the F9m1'1nsPecUOn tii not Been aPl)roVtd wdft 30 days, A tee of $100.00 Will be required to lift
the Sthp Work Order.
HEREBY PELEAM,AND AGREE TO HOLD HARMLESs, ya s�r L E COUNTY, AND. THEIR EMPLOYERS FROM
LI4BI171ES AND CLAIMS OF ANY TYPE .OF'NA7URE IA1141CH
MAY ARISE NOW OR ITV THE FUTURE our
THI,$TRANS ED"
TRANSACTION, DUE TO THE
KA,0E!*fIIC
CONNECTION OF ELECTRICAL PbWER Rq THE EVE10;OF VIOLA-TION OF MW AGREEMENT.