HomeMy WebLinkAboutBUILDING SITE PLANS01
ti3l=�D ,
NOV 2 7 2018
IfT. Wela County, Permitting 12
SLOPE
2"
O.H. .
Finish Columns with COVERED
Va" thick cut coral PORCH
meshed stucco bands
5/8" thick x 8"w cut
coral Finished stucco bands
F.
Gulf Coast Supply end MFG 5v Crimp Metal roofing FL #11451.12
26 ga. 5v trim metal roofing attached to plywood deck using #9 x 1.5"
wood scrawa with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4 side laps and 0 and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced V o.c. at all laps and two staggered rows 12" o.c. in field. Attach
�to trusses using attachment deter on this sheet
LEFT ELEVATION
EGRES
® 5/8" thick light textured
stucco on typical concrete.
block construction
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #11451.12
' 24 go. 5v crimp metal roofing attached to plywood deck using #9 x 1.5."
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min,,, 4' side laps and L" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank, nails
spaced L" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
12
LOPE 4
SCALE: 1/4' 1'-0"
• Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #IIL51.12
26 ga. '5v crimp metal roofing attached to plywood deck uamg #9 x 1,5"
wood screws with aelF aeahng washer at 12" o.c. max spacing over ASTM D
!type 2) 30 Ib felt underlayment metalled with min. 4 side laps end 6" end
laps fastened with corrosion resistant tin cape and with 1.25" ring shank nails
spaced 6" o.c. at all laps and two staggered rows 12" o.c. m field. Attach
deck to trusses using attachment detail on this sheet
112
SLOPE 4 •-
5/8" thick light textured
stucco on typical concrete
block 'construction
RIGHT ELEVATION
SCALE: 1/4" = I'—O"
2" x 4" top plate
v _
2" '
CRESS
.H.
COVERED
PORCH
: 2
C
5/8" thick light textured
5/8" thick x 8"w cut stucco on typical concrete
coral finished stucco bands block construction
REAR ELEVATION
SCALE: 1/4" = 1'-0'
PIN, Qe
FILE COPY
ST. LUCIE COUNTY BU D G IVIS N
REVIEWED FOR COMP I
REVIEWED By
DATE
PLANS AND PER �EPT ON JOB
SITE OR NO INS CTION(S) WILL BE MADE
'83000319V011ddV 11V H11M AldW00
01 Fl3080 NI AHVSS303N 38 AVW
1VH1 S110103dSNl 0131d AS 038inoam
SNO11038803 ANV 01103rens 38v
N80M 03SOdO8d TIV ONV SNVId 3S3H1
8'—I" SEARING
2" ALL MANUFACTURES LABLES SHOWING
O.H. U FACTORS AND SHGC COMPLIANCE
WITHfBC ENERGY CODE MUST
REMAIN ON ALL DOORS AND WINDOWS
UNTIL INSPECTIONS ARE APPROVED
n'—n° o Finiakarl Flnnn / s
CONCEALED FASTENERS OR ATTACHMENTS
ARE THE RESPONSIBILITY OF THE
CONTRACTOR OF RECORD.
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #11451.12
24 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self aeahng washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4 side laps and 6" end
laps fastened with corrosion resistant tin cape and with 1,25' ring shank nails
spaced V o.c. at all laps and two staggered rows 12" o,c. Infield. Attach
deck to.trusses using attachment detail on this sheet
l/8" Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 lb felt using 8d nails. Substrate
to be 19/32" COX Pi wood nailed at 6" o.c.
in field and edges with IOd ring shank galvanized
nails into truss webbing,
_ 12
SLOPE 1.4
2„ 2„
0_ H,Finished Floor
EGRESS
O
5/8" thick x 8% cut
coral finished stucco bands FRONT
I/2" drywall ceiling on truss bottom cord
1/2" drywall on
2" x 4" studs at 14" o.c.
base —board
2 x 4" P-T. bottom plate
{tiw'.'-``.:1.':{;'�':"tf:,r ^:;'.;, -.f,5. "�5.°f}. fT.r:�'S?�;�✓:Ci"l:^x(':,.
_: ..:..:.'..-3rvz'::r.'.4;::.•:.:,.:.'.�::.':i'.., .:.ri'...;: F�+C.'t : 5.+.' lF::•
4" concrete slab with fibermesh
OR
VxV #10/10 WWM on 6 and Visqueen over
clean compacted termite treated fill
Interior 1Non-Bear(r1q Partition
nts
Braden III
Braden AIA, Pro
WW nne
Building Corp.
Architects
- Planners
411
S.E. Coconut Avenue
THE
ROYAL E
Tel
: (112) 281-8258
Fax
E—mail:
: (112) 281-8283
bradenalaecomcast.net
Spanish Lakes
Sp,
Stuart, FL
34994 #AACOO0032
Lucie
Count Florida
R
u�111
f � II�
SCALE: 1/4" = 1'-0"
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
PERMITTING INFORMATION (FORM 100)
161
Florida Budding Code Residential: Lth Edition and ASCE 1-10 for Wind Loading
Budding Design is: Enclosed Risk Category- II Wind Velocity: IL5 mph ultimate
Mean Roof Height: IIII'—O " Roof Pitch: 4.12
Internal Pressure oG orricient: ±0.18
Subjectabdity to damage from: Weathering:' Negligible Termites: Verg Heavu
WY9
Width of Roof End Zone: '— " Wind Speed: I45 mph ultimate
Wind Exposure Classification.- C
1.21' x O.L a O.l2L
Adjustment factor for Exposure Height: ASD design
Load Combination: ASCE 1-10 Section 2.4 DL+LL; DL+O.LWL; O.LDL+O.LWL
NI
Components t Cladding Wind Pressure (NET) Roof Zone: I. +20.4/-32.4 pat
2.
SY
Roof Zone: +20.6/-51.0 pat
Roof Zone: 3.+20.4/-84.0psf
tl0j
Components t Cladding Wall End Zone Width:'-_ ""
Components t Cladding Wind Pressure (NET)al�lDone: 4.+35.8/-38.1 pat
0® Roof Zone I
Wall Zone: 5. +35,8/„ 41.8 psf
Walla Zone 4
Components t Cladding Wind Pressure (NET) on Garage Door:+32.0/-40.3psf
Shear Walls Considered for Structure? yes
Continuous Load Path Provided?
= Roof Zone 2
yg�g�
Walla Zone 5
Are Components an Cladding DetaT Provided? Yea
END ZONE
Minimum Soil Bearing Pressure:2 BOO psi. Presumptive: X Big Test: psi
SEE PRODUCT APPROVAL FOR IMPACT PROTECTION FOR OPENINGS
= Corner Zones
Roof Zone 3
ROOF LIVE LOAD: 31 pat ROOF DEAD LOAD: 10 pat
FLOOR LIVE LOAD: __1.5_ pat FLOOR DEAD LOAD: 10 sf
JOB AD \
DRESS: � Q_l,� C\::-, s�
MODEL: Date Drawn Revisions - Sheet Comm #
GARAGE 3-28-18 5-23-18 Smoke detector revision
RIGHT Drawn by:
C.G.U.
Checked bg:
D.R.B. OF 5
FLOOR FLAN � RA POST AREA CALCULATIONS
CRASH OS DETAIL 2r-o° 14'-0
TYPICAL NOTES: SCALE 1/4" = 1'-0" Living A/C = 1120 sq., ft.
N.T.S. 10'-6" 10'-O" �,-O" T -O"
1. Contractor to verify ALL notes and dimensions prior to 36" high by 4" diameter Back Porch Total = 210 sq. ft. Opt. PATIO/SLAB
steel crash post. Floor p • 3'-IOYs" �3'-IOYs"
proceeding with Work. Flange with 4 - 3/8" Garage = 328 s ft.
O 2. Contractor to STRICTLY enforce ALL OSHA Requirements. expansion bolts Into g =, q.
3. ALL Lumber to be used as Beam, Rafters, etc... to have slab (3/8"t 50 ksl steel plate) ° ° °
Total Under Roof= 2215 sq. ft. ° ° ° °
a minimum 1,400 P.S.I. fiber stress. `" Total Cubic Ft = 13,%0 ° ° �� EGRESS
4. No dissimilar metals to touch. 2%' 2h" °
S. ALL Concrete used for slabs shall be min. 2,500 PSI concrete. !6" :2"
ALL Concrete used for vertical filled cells, cont. tie beams etc.. to ° 2" VTR 12' x 12" Concrete column
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. rout mix M�2�
II block filled with concrete and p
' g •3/e° JIL O (2) #1 bars vert. tied into
Drywall at ceilings shall be leveled and attached to bottom chord I lintels aboveOf trusses with SOPew5 er FBC R-102.3.5. Attach buck to block wall with i �' g PORCHis1/4 dia. Elco comic screws with min. MASTER
7. ALL wood in contact with concrete shall be pressure treated. ° 1 114" penetration at 12" ox. max
p and 4" max from each corner thru I WIRE LATH t STUCCOp 8. ALL wall dimensions are nominal and not finished Wall or stud dimensions. " Exterior face 2" x V PT Buck 21' VTR CEILING :1BEDROOM iv
9. ALL plumbing fixtures to be low flow, or wall'11i
10. Contractor to Provide Drain at water heater in accordance �' I iif e'-o° A.F.F. O
Flat Ceding - as w
with the current edition of the Florida PlumbingCode. I z" 1 ° ° O ° ° ° ° rn
u Master I Lev. I T a
11. Contractor to Provide a 2 -8 wide door at one bathroom for u8 wood screws thru jamb Intgbudk I °
at each hinge and 15" o.c. max an 2•
handicap accessibility requirements. 2� % Detail at Door prior to door attachment Lay. I I
a" h" ' •I• I 2^ VTR � ...
12. Lowest finished floor to be set by Governing Building Department `` NTS I JIL
surveyor to Set in field. INSTALL VULKEM BLOCK SEALANT s• j I "'
13. Separation between residence and garage shall be per FBC R302.L ON ALL JAMB, HEADER, AND 2. s I © I O
SILL BLOCK PRIOR TO BUCK Shur. I
14. Door between garage and residence Shall be I-3/4 t 20 min, rated door INSTALLATION Kit. sink I e'-O to 9' e" A.F.F. T
Vanity to be N
Vaulted Ceding I�
Water Heater Install windows thru buck into, Kitchen �^ I I 34%' high
block with 3/16" tap -con with I I °
1 1/2" penetration at V o.c. max.
from each corner and 20. o.c. max I ,
15. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FBC R302.9.1 ;t°Bend°r taijamb& and 0' o.c. max. I I ®
IL. Wall and ceiling finishes shall have a smoke -developed Index of not greater than 450 per FBC R302.9.2 Exterior face
11. All exposed attic Insulation materials installed on attic floors shall have a critical radiant of wall Buck to be I' x 4' PT 3, 20' e°
flux not less than 0.12 watt per square centimeter. Exposed foam plastic Insulation V Ie W.C. ° I Rod t Shelf
materials exposed on the underside of the roof deck or on the attic walls shall comply7 GREAT
with F.B.C. R316 - see permit info box of code edition Bath
shay. I
18. Gyypsum board material shll conform to ASTM C36, C-19, C475, C514, C630, C931 I"x4" P.T. Buck nailed to 3" `� ROOM
C960, C1002, C1041,C1111, C11-18, C1218, C1395, or C1396 and shall be installed lack with case hardened nails oo I "' H.B.
according t0 the following: (FBC R102.3.5) Detail at lUlndoWs prior to window attachment To Septin
ic
° 1 I 0 g 9 Masonry Beam (�/
Drywall
Thickness
Location
Orientation
Framing
Member
Max. s acin
of fastenera
Nall sizing options for
drywall into
Spacing
installation of
Maximum
Nails
Screws
wood framing members
2" x min. thickness
Ceiling
Perpendicular
241,
1"
12"
13ga 1 3/8" long with 19/L4" head
0.098" diameter x 1 1/4" long
�21I
annular -ringed or 5d cooler nail
0.080" dia. x 1 5/8" long with
Walls
Either
it"
e„
IL"
Direction
IS/L4" head
OR
Gypsum board nail 0.08L" din.
x 15/8" with 9/32" head.
Ceiling
Perpendicular
241,
1"
12"
13ga 1 5/8" long with 19/L4" head
0.098" diameter x 1 3/8" long
annular -ringed or Ld cooler nail -
Walls Walls
Either
IL"
8°
I6°
0.092" dia. xR 1 1/8" long with
Direction
1/4" head
OR
Gypsum board nail 0.0915" dia.
x 11/8" with 19/64" head.
N T s P L U FI t:51 U R I S E R 2" x V knee -wall .c
x Buc nm a to w
block with case hardened nails below counter top N I L O S irr
prior to door attachmen 1
NTS I W
Install SGO thru buck Into
block with 3/I4" tap -con with 8" OL L - - - LINEN
penetration at L" o.c. max, ° I a �F oil t Shelf Co
from each corner and 20." o.c. max , BINeT W
* thereafter at head per product approval 1 �ac`� / \D_� w
DINING' 1 _ _
is,1)14d�ing
Uae 3/16" tap -con with ROOM°6'-O" F1 1/2" penetration at L" o.c. max: 0" to T-8" A.F.F. t4l" HIGH WALLivfrom eachcorner and 20" o.c. max Vaulted Cedingthereafter at sill per product approval8'-0" A.F.F.I" x L" P.T. Buck nailed to p ° ( Flat Ceilingblock with case hardened nails 1 :r 1-1/2 OVE HANG
ead prior to door attachment p J� I IIItCHEN ° It
Upper cabinets toed doorextend over ReF. I
door NON-YBNTO 5 °
THIRD
19. ALL ceramic the surfaces installed shall conform to ASTM A108.1 thru A1O8.6, n Masonry Wall ;,..,. BEDROOM10 [�
A108.1, A118.1, A118.3, A136.1 and A131.1 ,: 11/2-7
n
20. Cement, fiber -cement or glass mat g psum backers in accordance with ASTM i 8"-0"' A.F.F:'
'r`':;.:::..,. w Flat Ceiling
C1288, C1325, OR C1118 and installed I.A.W. manufacturers recommendations shall Bottom Track Typical Flooring: gc - r
be used as backer for the wall the in tub areas and wall panels in shower areas. 5111 Install SGD thru buck Into 4 ° w _ J IW.H Attie Access 4R-n Befits m tine
21. Insulation including facings such as retarders or vapor permeable members installed } block with 3/IL tap -con with O -0. 4 30" 4' 3'-4° I w W with light 1 -
g p S 11 d i n g Door D e 1, a j( I I/2° penetration at 6" o.c. max. y I - - - -
within floor-ceilingassemblies, roof -ceiling assemblies, wall, crawl spaces and attics from each,corner and 20." o.c. max I p/ Provide auto
shall have a flame spread index not to exceed 25 with an accom an In smoke thereafter Bt Jambs per product approval I I 4"e steel Ballard closer
p p y g PP Jamb.. - � See detail an this sheet
developed index not to exceed 450 when tested in accordance with ASTM E 84. At Masonry Wall NTS J JQ; m
InSUlatlOn shall comply with F.B.C.
R316.
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL 411651.12
26 ga. Sy crimp metal roofing attached to plywood
deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb Felt underlagment installed with min.
4' side laps and L" and
laps fastened with corrosion resistant tin caps and
with 1.25" ring shank nails.
spaced 6" o.c. at all laps and two staggered rows
12" o.c. in field. Attach
deck to trussea using attachment detail on this sheet
Simpson HETA 20 or equal
hurricane anchor each true* 12
1 1
with (10) IOd x I I/2" Haile
PRE-ENGINEERED; TRUSSES
( 24' o.c.) supporting Max. 4
18101bs.
F
at 24"o.c. TYPICAL
uplift
(shop drawings bg manufacturer)
Aluminum Drip -�
R-30 blown fiberglass
Edge f Fascia
in bottom chord of trusses'
1/2" drdwall with smooth hmsh
2" x L" Sub -Fascia
Two rows of beam block filed with concrete
and (1) #5 bar cunt. in each row. Substitute
Kagcan full o vent vmgl sorf t installed
usin 1/8' dia shank x 16" long
precast lintel': filled with concrete and (1) #S
bar cont. for bottom row over openings
galv.
roo♦aing nails with 3/8' dia. head per
product approval - see chart sheet $11111
1/2" drywall over 1" x furring
R4.1
strips at IL" o.c. with fi-foil
insulation on typical
8" Block walls
5/8" thick light textured
=
All drywall to
be Installed per FBC R102.3.1
stucco on typical concrete
and shall meet all pertaining ASTM codes.
"M"
block construction
bo
Mortar to be Type onTgg proportioned per FBC RL01.1
and Mortar Jonts shall compry with FBC R401.2.1.
Provide Dur-O-Rock at all wet areas (ex. showers, tubs etc---
#5 bar vert. w/
30" overlap
Fill cell with concrete and
at each filled cell
fU "#5 bar vert. !typical).
Max. spacing shall not exceed
Wood
48" unless otherwise noted
Base
see foundation plan notes for
Spacing at opening*'
4" concrete slab with ribermesh OR
VxV 410/10 WWM on 4 mil Visqueen over
clean compacted termite treated Fill
Grade
J lop " 1
ble Linen Double ® ISO Amp
Ha in Hanging P nel
22"
'^ H.B. �.r np Y
GARAGE
nitJDVaA:FF. { ©p Flat Ceiling
ngingouble
Ha °
+
..
® ® r-----------------� O
Block wall n07 I v
MT ° ° I garage to be I -
m° I struck block
M EGRE S$Y �I I Q
v
ull
I I o-
uVu
m gm
•r � mNf all
I
IL
s.. ° ° 1901°
SECOND it
m
BEDROOM
O
a 8'-0" A.F.F. °
Flat Ceiling in
EGRESS ° N
f, O
T-8" 2'-8" 3'-6" 9'-o"
_ I -III � I I I I I •4 1 '•+'•" I I -I I L�- I I --I I I�
Braden Braden ►41A P,4 MODEL: Date Drawn : Revisions : Sheet Comm #
Wynne Building Corp. 3- 8-8 5-23-18 Smoke detector revision
Architects - Planners GARAGE
14" x 14"` G.oncrete `footing 411 S.E. Coconut Avenue �L�( �/ I Drawn by: -IIII ,.. .with (2) #5 bars cont. and #5 THE R O I A L E
transverse bars at 48" o.c. Tel : (112) 281-8258 _ Rl�si-iT C.C.U.Z " 12-�OI
TYPICAL SECTION Fax :(112)281,-8283 y: B
E-mail: bradenaia'scomcast.net Spanish Lakes' Checked b
Scale 1/2" = I'-O" Stuart FL 34996 #AAC000032 St" Lucie County Florida D.R.B. OF 5
Window Schedule
Mark
Size
Rough O en.
Window Descrl Lion
PRESSURE ZONE
I.
4'-Sie'x V-3%8'
S4%8'x L3%;'
Single Hung
ZONE 4
2.
C-2%s"x V-3%a"
15' x L3%;'
Single Hung
ZONE 4
2'-2" x 3'-2y2"
21,hVx 38%"
Single Hung
ZONE 4
4.
3'-1" x 5'-3%'
38" x L3'/4"
Single Hung
ZONE 4
S.
4'-5Ya"x 4'-2 %s"
54'/s"x 54 ya"
Single Hung
ZONE 4
ALL Windows to be aluminum windows w/ tint
and mullions per elevations.
ALL windows to withstand pressures in permit info box 'on sheet I
ALL windows in bathrooms to be tempered
All rough opening dimensions to be verified by contractor
with manufacturer a specs prior to construction
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
9'-O' X 1'-O"
108" x 84"
Overhe?ad Gmege Door
,ZONE 4
B
3'-O" X V-8"
41"%" x 83%"
Fiberglass Panel',°- Inswing
2QNE'14
C
c-off X c-8"
14' x 81 i2" d' , ;
Sliding Glass Door
ZONE 4
D
X-O" X V-8"
Solid Core - Wood - L-Panel -Bi-Fold Finished•24' x 81'2"
E
X-L" X C-8"
Solid Core - Wood - L-Panel.
F
5'-O' X L'-8"
Solid Core - Wood - L-Panel - Bi-Fold
G
2'-8" x L' -a" x 1 %"
Solid Core Wood, Steel, or Masonite Door
H
2'-8" X V-8"
Solid Core - Wood - L-Panel
J
2'-0 X V-8"
Solid Core - Wood - L-Panel - BrFold
ALL Exterior doors to withstand pressures stated in permit info
box on sheet 41
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX, ON SHEET #1
All rough opening dimensions to be verified by contractor
with manufacturers specs prior to construction
i
Z)
11IKU�
I U7z,/�L-
INIC
I =Z).
I.
ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL
8.
SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM
FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
PROPER ENGINEERING DATA FOR DESIGN.
2•
ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS
`)•
DESIGN LOADS ARE AS FOLLOWS:
ROOF (DL+LL) = 41 PSF
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS
WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #1
EXPOSURE ="C"
3.
POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION.
10.
ALL REINFORCING STEEL SHALL BE GRADE 40, MEETING ASTM A-16, t
4
GROUND FLOOR SLAB TO BE A MiNIMUM 4" THICK W/ 6X6 I0/10
A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 301 STEEL.
WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
11.
ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
(MINIMUM DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
BE
MIX MAY BSUBSTITUTED FOR WELDED WIRE MESH.
E
FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
5
LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
BEFORE FILL IS BROUGHT IN. FILL MATERIAL SHALL CONSIST OF
CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL
12.
MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE
FOOTING: 3"
STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND
BEAMS: 1-1/2"
COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY
PROCTOR VALUE.
13.
LAP ALL REINFORCING STEEL "A MINIMUM OF 48 BAR DIAMETERS.
6
GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
14.
USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1400 PSI
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE
ATTENTION OF THE ARCHITECT.
IS-
ALL STANDARD LUMBER SHALL "BE SYP WITH A MINIMUM Fb OF 1000
PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE.
7
GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER
'
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR
16.
ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING.
FOUNDA710N
FLAN
I. Any changes to plans must be submitted to the architect
for approval before proceeding with construction.
2. Contractor shall be responsible for verification of all
notation and dimensions before starting construction.
3. Soil conditions assumed to be 2500 psf. Should any other conditions be
encountered, the architect shall be notified in writing for revision
'f. Verify all recess thickness at showers, tile, etc....
S. Contractor to provide filled cell with concrete and I U5 bar vert. at 48"
o.c. max. Provide (1) filled cell on each side of openings up to 5'-11" wide.
Provide (2) filled cells on each side Of openings from 6'—O" to 9'-11"
SCALE: 1/4" = I'-O"
FOOTING
SCHEDULE
Mark
size
Description
I
14"W
x 14"D
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS
12"W
X 12"D
MONOLITHIC FOOTING
WITH
(2) #5 BARS CONTINUOUS
F
30"
x 300.x It"D
COLUMN FOOTING WITH (4)
#5 BARS EACH WAY
8°W
x 8"D
THICKEN SLAB EDGE
WITH
I #5 BAR CONTINUOUS
With
x 14"10
Curb at Garage
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS - CURB a O'-O"
and Provide (3) filled cells on each side of openings from 10'-0" and up
Contractor to see plans for any other condition used. Foundation walls
shall have filled cells at 24" o.c. unless otherwise noted (see section)
6. Contractor to provide for Form Board Survey — Form Board Survey
to be provided to Truss Company -prior to truss construction
1. Contractor to provide for soil test prior to construction and provide
a copy of soil test to architect for review prior to construction
8. ALL Reinforcing steel shall be grade LO, meeting ASTM A-16 and
A-35 Specifications. ALL Anchors to be A-301 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
#5 bar vert. w/ Thicken edge to 8"x8"
30" overlap11_�Er: TYPICAL with concrete and 4" concrete slab with fibermesh OR
at each Pilled cell ECTIONS one #5 bar continuous G"xV 410/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
4" concrete slab with fibermesh OR GRADE
VXV #10/10 WWM on 10 mill Visqueen over " :»- :; ;.;;;!:...: !-;;:::•<;'.
clean compacted termite treated fill m -
Grade J
14"w x 14"d concrete monolithic
rooting with (2) #5 bars cunt.
14"
TYPICAL FOOTING DETAIL •
SCALE 1/2" = 1'-0" a
4" concrete slab with fibermesh OR
d,"xd" #10/10 WWM on 10 mill Visqueen over
clean compacted termite treated fill
#S bar Cont. #
Step per
- foundation an ,
2v
10" (2) #5 bars cont. bottom steal
12"
2 DETAIL' AT GARAGE STEPDOWN
SCALE 1/2" = 1'-0"
12" x IT concrete column
block filled with concrete
and (2) u7 bars vert. tied
into lintels above
Top of tooter
14' below finished floor
q�lllillllll
C 30"
COLUMN FOOTING DETAI
SCALE
«4J PORE
15 bai• vert. w/
30" overlap
t each filled cell
8
LAB EDGE DETAIL
9C`ALP 1/2" =
\SEE TYPICAL
ECTIONS
Adjust curb height
based on gar. floor 4" concrete slab with Fibermesh OR
slope. VxV #10/10 WWM on 10 mil Visqueen over
5 bar in Curb clean compacted termite treated fill
0'-0" a F.F. JVN
Grade
Z7�
_wah
Ji—i III i i— 14% x 14"d concrete monolithic
footing with (2) 95 bars Cont.
14"
nFS GARAGE CURB DETAIL
ITI I
=1111—
{
Twith
30"x30"xl6" concrete
2" x 6"
PT wood secured
column footing with (4)
3/8"dia.
x 6" anchor bolt
at 18" o.c.
#5 bars each Way-
overhead door track secured to wood
jamb per manufacturer's product approval
Garage
Door Jamb
Detail
GARAGE
DOOR TO WITHSTAND PRESSURES STATED NTS
PERMIT
INFO SOX ON
SHEET #I. SEE PRODUCT
/2^ = i'-O"
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
Termite Protection for New
Construction.
Soil treatment used for subterranean termite prevention
inside the foundation perimeter shall be done after all
excavation, backfilling and compaction is complete.
If soil area is disturbed after Initial chemical soil treatment
area shall be re -treated with a chemical soil treatment
including spaces boxed or framed.
Treatment must be in accordance with the rules and laws
established by the Florida Department of Agriculture and
consumer services.
Protective sleeves around metallic piping penetrating
concrete slab on grade floors shall not be of cellulose
containing materials and shall receive application of
termicide in annular space between sleeve and pipe.
Filled Cell Masonry Column With One
#5 From Footing To Tie Beam
Conc. Fill To Be 3000 PSI
See Floor Plan For Location
O ..
Single Filled Cell Column
NTS
Filled Cell Masonry Column With One
#5 From Footing To Beam Each.
Conc. Fill To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NTS
Braden It Braden AIA, PA
Architects - Planners
411 S.E. Coconut Avenue
W,B Tel (lit) 281-8258
Fax : ('7 12) 281-8283
E-mail: bradenaie®comcast.net
Stuart_ FL 34994 #AAC000032
0
0
J
H.B.
p7 -V
431,
J
12" x 12" Concrete column Opt. PATIO/SLA
block filled with concrete and p
(2) #1 bars vart. tied into I a
lintels above
° I —1 — o 0 0 o i i i y y y o 0
© Filled cell under I FI FI
girder above I
QD
Rear Porch Slab to I 4"
I be poured separately I
O From House Slab. 1 1
J �
Thicken footing to I w
I ° r 24% x 14"d x 24"L
under filled cell MUM
i R
° ° ° ° ° N ° _ ° under girder bearing. NLL
°14-V
I
r FI Rear Patio/Slab to be Flush with bottom of
sliding door recess.-aSlope I"C�Iconcrete slab with fiermesI H.B.
Cx6" 410/10 WWM on 6 mill Vlsqueen over
1 clean compacted' termite treated fill °
1 FI I
1
°1 I°
f-
i
I
0 1 I
°1 I°
1 FI I
I FI I
i I
°1
D°
�o� - - --
II ---------
° I 1 1 �J I °
A/#IC o
i W �� I I
\-4"0 Steel Ballard
See detail on this sheet
I i I
i II I
4" concrete slab with fibermesh OR
I VxO 410/10 WWM on 4 and Visqueen over
I I clean compacted termite treated F)OII
°
IF1 1 1 b Ii
1 8 C4 I o
° L11
\
m 'Recess forge GaraDoor----J
I FI I
I I
I I
°I I°
I
3'-1.
9'-0.J-
WLirre
THE
Buildin Corp.ODEL:
g or p.
ROYALS
'GARAGER
Date Drawn :
3-28-18
Drawn by:
C.C.J.
Checked by:
D.R.B.
Revisions
5-23-18 Smoke detector revision
Spanish Lakes
St. Lucie County Florida
Sheet
3.
OF 5
Comm #
12—B101
RCOF SHEETING
ATTACHMENT DETAIL
I. Minimum Nail Size = 8d ring shank (min. 2.5" long)
2. Minimum Screw Size = 48 x 2"
3. Minimum Sheathing Thickness 19/32" COX Plywood
4. Use nails or screws based on pressure for roof stated
in permit info box on these plans for zone 3
Ke
Area
Ede
Field
Fastener
P Max.
ssure
Zone I
6"
L"
8d ring shank
45 psf
Zone 2
4"
4"
8d ring shank
74 psf
Zone 3
4"
of
8d ring shank
84 psf
** Zone 3a
6"
(o"
48 wood screw
,112.5 psf
** Use nods
or screws based on pies§ure
for
roof stated
in permit
info box on these plans
for
zone
3
Concrete
/Lintel
Verify with Plan
Provide #5 bars with min. 48 bar. Provide #5 bar set inpre-castROOF FLAN Sc7 le : 1/2" = 1'-O"
diameters overlap into beam. Tie lintel into beam where length of
filled Dell steal into continuous the opening calls for it. i u
beam block steel. — Overhangs at 1 —o unless otherwise noted on this sheet
Roof pitch at 4:12 unless otherwise noted on .this sheet
Provide Cast -Crete
SUS-OB/OT precast
lintel set in mortar
Mina 8" Bearing
r 1
I IN
Provide PT Buck
i..,;i
attached per jamb
details into filled cal
I�: •)
4" Pre -cast
I;� it
qq
rt'1
SillN.
1.=, �J
Truss shop drawings to be provided by manufacturer
Any changes to this plan shall be submitted to the
architect for approval in writing prior to starting construction.
— ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MANUFACTURER
— Architect to review Truss Shop Drawings Prior
t0 construction for layout and uplift verification
Poured Filled call — Contractor to provide for Form Board Survey and to provide
Form Board Survey to Truss Company prior to truss construco
CY
Provide #5 bars with min. 48 bar H
diameters overlap in filled cell Tie
Bled cell steel into continuous W
Tooter steel
` Concrete Footing
.
T. schedule
Fora footer
e i
x
DETAIL AT
WINDOW OPENING
IN
CBS WALL
Scale: 1/2" = I'-O"
O
�'
.� .�
a.
SINGLE PLY REAR GIRDER TRUSSLu
a
Nail 2" x 4' blocking to vert. leg of
u
O 0
truss with IOd x 1.5 nails at 4' o.c.
/_�
a
E C
_OD
sr
Install Simpson MGT into wall usin
&
fn to'T-
u
\
Z
5/8" dia. threaded rod set min.
N
I2°x 12" into wet beam and (22) IOd nails into truss
Column Block
41 "
48 Bar Die.
Reber Reber TRUSS BLOCKING DETAIL
Min, Overlap AT GIRDER STRAPPING
,•'' i.
AT CENTER BEARING POINT
Column to Lintel Attachment
NTS
1/8" thick light textured stucco installed per
ASTM C 924 over ASTM D type 2 paper backed
wire lath nailed to substrate through one layer of
ASTM D Type 2 felt paper using Bid nails. Substrate�`"�
to be 19/32" CDX Plywood nailed at L" o-c, in field
and edges with IOd ring shank nails into studs. \
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #IIL51.12
24 go. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4' side laps and L" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
:paced L" o.c. at all laps and two staggered rows 12" o.c, in field. Attach
deck to trusses using attachment detail on this sheet
Additional Precast Lintel #5 bLintel Bar Clear "A" "B"
ars
MR-11-11f",
CLEAR ength Length Span Bars Bars
2'-10" 2'-8" I'-L" 2,#3 none
3'-4" 3'-4" 2'-2" 2,43 none
8P8-OBAT OFe-IB/1T eFe-I13/2T
Additional 4'-O" 3'-10" 2'-8" 2,#3 none
#5 bars r•._,
ILEA ; e a 4'-L" 4'-4" 3'-2" 2 U3 none
no Raw of "H"
^;'•.i:: Block Above •`;; 5 -4„ 5 2" 4'- 0 2,43 none
2,44 none
1, :�Y •r•... Precast Lintal
' '; r L'-L" L'-4" 5'-4"
Additional 2,44 none
i !
U5 bars
none
BPIL-IB/IT BPI6-I13/2T e'-4" �'-10" T-O" 2 u5 none
NOTES:
i. min. coverage or steel-i.5"
2. min. bearing required ! as. and-e" ALL reinforcing steel is grade 60.
3. standard for reinf. ateel=ASTM A416
TYPICAL LINTEL SECTION
( PRECAST CONCRETE )
LINTEL SCHEDULE
Mark
Window
or D
Unit
Width
Lintel
Size
Cast -Crete
Specification
Rows of
"H' Block
Above
x
Bottom
steel
size
Top
Steal
Size
Max.
Gravity
Load
(PLF)
Max.
Uplift
Load
(PLF)
Max
Lateral
Load
(PLF)
L22
2'-2"
V-L"
8F8-OL/IT
I
U5
3049
I619
1024
L31
T-0
3' -e
Y-O"
8P8-OBAT
1
#5
2541
1363
10
L45
4'-6"
5'-I0"
OFO-OBAT
1
85
1105
409
334
L50
5'-0'
L'-L'
BF8-OBAT
1
#5
1238
1 835
121
LAO
L'-8"
T-L"
8F8-OBAT
1
#5
1011
1 121
534
L80
1111
9'-4'
81"1
1
#5
1 2
#5
152
1 Bell
512
L90
9'-O"
L
10'-"
BF8-IB/2T
I
#5
2
#5
L43
530
401
LIIOB
T-On
10'-4"
61=I6-I15/2T
ONE
1
#5
2
U5
1533
1183
401
WOO
10'-0"
ll'-4'
811118-I8/2T
1
#5
2
#6
582
494
452
LIOOB
10'-O"
ll'-4'
8Fi4-IB/2T
ONE
I
#5
2
#B
1346
1028
452
LI20
12'-0'
13'-4'
BF8-I13/2T
1
#5
2
#5
411
428
324
L120B
12'-0'
IV-4"
BFI6-15/2T
ONE
1
#5
2
#5
1015
110
324
LI40
14'-0"
IS'-4"
OFI6-I5/2T
ONE
I
#5
2
#5
P150
409
259
LILO
IL'-O"
11'-4"
8P8-IB/2T
1
#5
2
#6
300
192
194
LI40B
IL'-O"
I IT-4'
BFIL-I13/2'r
I ONE
1
#5
2
#5
950
500
194
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
- LINTELS OVER 14'-0" LONG ARE TO BE PRESTRESSED.
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails—
( 24" o.c.) supporting Max.
18101ba. uplift
Aluminum Drip
Edge t Fascia
12"
2" x L' Sub-Fascl
Kaycan full o vent vinyl soffit installed
using 1/8" die shank x 1.5" long galv.
roofing nails with 3/8' dia. head per
product approval - ova chart sheet #1
12' x 12' concrete column
block filled with concrete
and (2) #1 bars vert, Clod
into lintels above
thicken edge to 8"xO"
with concrete and
one #5 bar continuous
BEYOND
Top of Tooter
IL' below finished floor
12
4
Aluminum Drip
Edge t Fascia
Flash and Counter
f lash
Nail ledger to
gable and truss
with (2) IOd ils
at each web
O
04
Q
W
Brace Gable end
with 2" x 4" SYP #2
Oft back nailed to bottom
Of top chords using (2) IOd
nails at each trtke
PRE-ENGINEERED WOOD TRL
® 24"o.c. TYPICAL
( shop drawings by manufacturer )
\R-30 blown fiberglass
in bottom chord of trusses
drywall with smooth finish
Two rows of beam block filled with concrete
and (1) #5 bar cant. in each row. Substitute
precast lintel filled with concrete and (1) #5
bar cant. for bottom row over openings
I/2" drywall over I" x furringg
strips rail
o.c. with R4.1 fr-foil
insulation on typical 8" Block walls
All drywall to be installed per FBC R702.3.1
i and :hall meet all pertaining ASTM codes.
�a Mortar to be Type "M" on
Ty proportioned er FBC RLOI.I
and Mortar"}Dints shell comply with FBC LOl.2.l.
Provide Our-O-Rock at all wet areas (ex. showers, tubs etc---)
Fill cell with concrete and
(I) #5 bar vert. (typical).
Max. spacing shall not exceed
Wood 48" unless otherwise noted
Base see foundation plan notes for
spacing at openings
4" concrete slab with fibermesh OR
6"xL" #10/10 WWM on L mil isqueen over
4\ a Slope per foundation plan `r clean compacted termite treated fill
hi -rib lath
vertical wood
i to provide
,ration into
3/4' penetration
members
5/8" thick light textured
stucco on typical concrete
block construction
Varies - see plan
#5 bar vert. w/
30" overlap
at each filled cell
Rear Patio/Slab to
be flush with bottom of
sliding door recess.
Step per foundation plan
-i 1 1 1 IIIII I I II I I I-�-� .• .-I 111-I I I I-1 I
1111 =` .:,:. <' I I 1 11 I 111 1111111=1
III. 111111j111 1iii_� i�_I��i 3 T4)ical Section at Front Forch
ll Scale 1/2" = I'—O"
Strap
truss to
wall using Simpson
MGT with
5/8" die.
threaded
rod with min 12"
embedment
into
beam either
wet set or in
epoxy with
(22)
IOd nails
into truss. Add
blocking to
truss
leg per detail on
this sheet
II II II II III n II
L90B
L45
L90B
LLO
Bill
Simpson HETA 20
hurricane anchor at each truss
( 2-4" o-c.) suppporting Max.
TA 20 1810 `lba. uplift
Mon_
Ail FEWBOWAAA
ME A
SWAM
L46
B1
l�
N
�1
Wgo
ig
41
B1 L31
L45 #ail f.
Gulf Coast Supply and MFG 5v Crimp Metal roofin FL #11451.12 I:C
26 go. 5v crimp metal roofing attached to plywood eck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D SLOPE 14
laps fastened with corrosion resistant in caps and th 1.25" ring shank nails
:paced L o.c. at all laps and two staggered rows I " o.c. in field, Attach BI
deck to trusses using attachment detail on this she
s� x 99" I
r LU
W Attic Access
. nIrl,
1.31 B1 1 qOq7� �
4 I SLOPE
I
HI \
Z I
\I I
I \ O I
I \ sip I
I \ I
I I
I \ I
milli I ininini
�I Ie�l�llii I III
►71-I-I-��l[k7®I-I®
L31
m�
Uf
� X
r
Og
H�o n
a
a -
=a N N
u..�
u
0� o�
E_ Q _ QD
t!) u N
0
I
in
PANEL
"A"
Pales
BR
Load
Wire
Description
tire#
arc#
Description
Wire
Load
BR
Pales
2
40
1.0 Its
#8
A/C comp
1
2
AMU
#10
3.5 ke
30
2
3
4
2
30
4.5 kw
#10
40 gal. water HTR
5
6
Ran a
#6
12.0 like
50
2
l
g
1
20
Lis kw
#12
Pump
9
1 10
Dryer
#10
5.0 Its
30
2
II
12
1
20
1.5 kw
#12
13
14
Dishwasher
#12
1.2 kw
20
1
1
20
1.6 Its
$12
Microwave
Is
11,
Refrigerator
#12
1.2 kw
20
1
1
20
1.5 Ike
#12
Kitchen S.A.C.
Il
18
Recapts
#12
-
20
1
1
20
1.5 Its
#12
Kitchen 5.A.C.
19
20
Recepts
#12
-
20
1
1
20
1.2 kw
$12
Clothes Washer
21
22
Recepts
#12
-
20
1
1
20
0.81 Its
#12
Garage Door Opener
23
24
Recepts
$12
-
20
1
1
20
1.4 ku
$12
25
26
Recepts-
312
20
1
I
120
1.92 ko
#12
21
28
Receipts-
$12
-
20
1
1
IS
#14
General Lighting
29
3o
Recepts-
#12
-
20
1
I
Is
-
#14
General Lighting
31
32
Recepts
$12
20
1
1
I6
-'
414
General Lighting
33
34
Exterior GFCI
812
20
1
1
15
-
#14
General Lighting
35
36
Bathroom GPI
#12
--'
20
1
1
20
#12
Smoke Detectors
31
36
General Lighting
314
15
I
1
20
#12
Bathroom GPI
39
40
General Lighting
81-4
15
1
-
8 are
41
42
spare -
PANEL "A" LOAD CALCULATION SHEET
Load Description
Qt .
Watts
Total(Watts)
General Lighting ,(3 watts sq ft)
Small. Appliance. ,�ircult(s> . . . . . . . . . . . . ... .................
.Range,,,,,.,., ...........................................
Refrigerator ............... ....... .....
.Microwave.....................................................
.Dish , Washer.... ............................... ................
Clothes Was er
Clothea..Dryer........................
. .Water. Heater ...... .. ............................
Water, Pump ...................................................
1135
3
5,205
2
1,500
3,000
1
12,000
12,000
1
1200
1,200
1
1,500
1,500
1
1,200
1200
1
1,200
1,200
1
5,000
5,000
1
4,500
4,500
1
1,800
1,800
I
810
810
Total Watts
31,415
First 10000 Watts e100%
1
10,000
10-10-0-0-
Remainder 21,415 e40%
1
O
10,961.
Electric Heat or A/C 10,000 965%
1
10,000
10,000
Calculated Load
Watts
30,961.
Voltage
240
Calculated Wattage Divided bg Voltage = Total Amps 129.03
Panel Size Required = 150 Amps
Electrical S mbol Legend
S
Single Pole Switch
®
Recessed Can Light
Sa
Double Pole Switch
®
Eyeball Recessed
Pe
Push Button Switch
Exhaust Fan
Duplex Outlet
¢
Ceiling Mounted Light
Special Receptacle
o-
Wall Mounted Light
Waterproof, ground fault interrupts
Light with Pull Chain (attic)
®
Floor Duplex Outlet
©
Computer Connection Jack
r-cml
Carbon Monoxide Detector
4t?
Flood Light
Q
Thermostat
®
Electrical Panel
®
Central Vac
8
Electrical Meter
®
Smoke Detector
�
Carling Pan
®
Television Jack
❑Z
Telephone Jack
AC 0150
A/C Disconnect
®
I x 4 Florescent Light
®
2 x 4 Florescent Light
®
Speaker Hook -Up
V
Intercom
Vent thru
Opt. PATIO/SLAB
Opt. PATIO/SLAB
1 CFM i
OxlOxl ✓
PORCH MASTER
STER WP GFCI BEDROOM
M
B DROOM �I V Y
RORC�I
139 CFM
IOXIOxl
143 CFM I I63 CFM
IOXIOxl I IOxioxl
Center) Registers
on �Carhrig Pan
12xIB/A
.. rs
R EAT I 12xIB2/0A
O M I 8 CFM
ex4x4
DINING
ROOM
THIRD
BEDROOM
84 CFM
IOxLxL
= JUNCTION BOX TO SUPPORT A FAN A/C disc.
O = THERMOSTAT LOCATION !E
B/A = Balanced Air ISO
#2/0 Alurmnum read AMP
Electric Notes; l'h•Condmt MCB 215 CFM 1
PANEL 2x4X1
1. Use copper wire only, no aluminum.
2. Provide and wire all required smoke detectors. TE
3. Contractor to verifg location of electrical SECOND
service and provider.
4. ALL paddle fans shall be on a rheostat. AMu BEDROOM
b 2" P•VC (PPL
5.
ALL ath and kitchen receptacles to be GFI protected.
6.
ALL exterior outlets to be WP/GFI protected.
"I.
Recessed cans to be installed per NFPA requirements.
8.
AFCI receptacles are regwired in all rooms except
Kitchen, Bathrooms, and Garage.
2• ri id service FPLars'in slab
9.
A/C Return Air Balance Must comply w/ FBC RM1602
10.
A RefrigBrant lines that are run thru slabs must be
sleeved ed 1n PVC
T R I C LRISER
11.
ALL A/C Equipment shall complg with energy calculation
12.
All work shall be performed bg a licensed electrical
- - Contractor shall use AL-CU Landing lugs. NTS
13.
contractor, the completed system shall be fully operative.
- Contractor shall torque lugs I.A.W.
Contractor shall pay for all fees, permits, testing, and
manufacturers recommendations which
re inspections including blower testing whorequired.
shall be verified prior to construction
14.
All work shall be coordinated with other trades to avoid
interference with the progress of construction.
19. The electrical s stem shall be coin late) and effective)
g p g y
15.
All required insurance shall be provided for protection
grounded as required bg the latest edition of the N.E.C.
against the public liabilitg and property damage for the
20. All material shall be new and shall bear underwriters'
duration of the work.
labels where applicable.
16.
Contractor shall guarantee all materials and workmanship
free of defects for a period of not less than two gears from
21. All equipment and panel sizes shall be verified before
the date of acceptance or certificate of occupancy, or one
ordering. The contractor shall provide circuit routings to
gear from closing sale of house.
suit the job conditions.
Correction of defects shall be completed without additional
charge and shall include replacements or repair of any
22. Furnish and install all fixtures as called for on the plans
other phase of installation that may have been damaged.
or as selected bg others.
11.
It is not the intent of these plans to show every minor detail
of construction. The contractor shall furnish and install
23. All raceways and pipes placed in or through ang concrete
all items for a complete electrical system and provide all
slab shall be spaced a minimum of three diameters of the
the requirements necessary for the equipment to be placed in
largest conduit or pipe from any other service.
proper working order.
18.
All work shall be done in accordance with the N.E.C. and
24. All exposed wire below 9'-I" shall be installed in metal EMT
shall complg with all local codes and ordinances, and shall
conduit.
meet all standard requirements of the local electric utility
25_ Drger Vents to be installed per FBC RM1502
and telephone compan4.
r I
O
12 ITCHEN
144 CFM
\ 12xLx1
12xl2x8
B/A
r
sims
M
OM11I
Attir Access
with light
See detail on this sheet
ol
Vent thru
soffit
SEE MANUAL
"J" and Energg
150 Am Calculation
Panelp for Unit info
gx4,�.4 GARAGE
4� CFM
i-----------------,
Exhaust Duct
Thru Soffit
I
I I
I
I
I
I
I
Wire For
Front Post
Light
M CH /4NIC/4L L4Y0UT
O= THERMOSTAT LOCATION SCALE; 1/4" I'- O n
I
I /
V /
/
C.rtR�AT -----_
ROOM M Q I SU
ISmoke / Csrbon
I. Monde Detector (P
Combo
m
LO13ET
T:",
Il I
Il
3-
r �
� O •
T;i D _I .•1
111
I �
k
- �-♦♦ H_
!I! l!,..m i
i ``j`_-
Attic Ace*
41th light
\�4*0 Steel Ballard
See detail on this elieret
Pull chain
pc ight in
1w
'1 •- • - •Amp
RI► imswaa� [: • • • S
attic I
anel
E► ♦ r
(o) _
• �: �� `
roll
Opener
U�+1'111
Y
ti
r
wP cl
Center Post Light on
This corner
Braden It Braden AIA, FA
Architects - Planners
Winne Building Corp.
411 S.E. Coconut Avenue
THE ROYAL E
Tel ; (112) 281-8258
_
Spanish Lakes
St, Lucie County Florida
Fax : (112) 281-8283
E-mail: bradenaiascomcast.net
Stuart. FL S 499L #AACOOOOS2
N ? m Post Light with
v E Photo cell
v_o ✓
u_� vvr••llfYll
" Exhaust Duct
-,T-hru Soffit
0" Exhaust
Duct Thru
Wall
WP GFCI
Install disc.
N under disc.
Q not shown for
clarity
ELECTRICAL PL,4N
SCALE: I/4" = I'-O"
FBC 2309.1 Attic Ventino Calculations
Total Attic Sppace = 2481 sq. ft.
Venting ratio 1/150 = rLSS sq. ft. required
Provide A Continuous Vented Soffit
MODEL: Date Drawn : Revisions
3-28-18 5-23-I8 Smoke detector revision
GARAGE Drawn bg:
RIGHT C. U.
Checked bg:
D.R.B.
Sheet Comm #
E - I 12-101
B
OF 5
A=LIFE SAFETY WARNING
This symbol identifies life Safety Warnings that should be read
given special attention ,y all persons installing trusses.
ALL TRUSSES ARE Tq BE SET
AT 2.-0: ON CENTER
EXCEPT AS NOTED
M
DONT LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
MULTIPLE PLY TRUSSES MUST BE
ASTENED TOGETHER PER ENGINEERINI
BEFORE SETTING. REFER TO
ENGINEERING DRAWING TO DETERMINE
® IF (MULTIPLE PLY.
30" Span or less
0 degrees
A
30' to 60' Span
Sprea er Bar
or less
�—
Jag F_Approx 2/3 to
Line 1/2 of span
F— j /2
Tag Line span opprox.
I
REFER TO BCSI
Truss must be set this way if crane used.
This is on example, truss may not match.
Insist crane operator sets truss this way.
REFER TO BCSI
Truss must be set this way if crane used.
Tess is an example, your truss may not math.
insist crone operator sets truss this ivoy.
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
are installed.
AIR 1-1ANDI_EF� NOT-F=
UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR.
Carrying Girder
For Truss to Truss
Connections see
hanger/connector Nails must be as
shown. Guide tabs o
schedule in engineering Dome angle nails.
package.
Carried Truss
QMiNER JM]l8
r sEvaeo.
sEE enwwao
o J
Er,�R2rra"a.
A�
—• o
24-o.C.TNRu I I
CORNERA4CK3 -t•�
O2r• �t
NLY
;NER DETAIL
3S NOT SHOWN FOR CLARITY
SEAT PLATES BY CHAMBERS
4DICATES LOAD BEARING
EQUIRED BY TRUSSES
UPPLIED BY BUILDER
T A HEIGHT OF V-1"
BOVE FINISHED FLOOR
PLUMB CUT END
2 x 4 Top Chord
BEARING HEIGHT 8'-1"
PICAL END DETAIL
I
k'.
A ARRANGE: WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF 18' - 24' IN LENGTH
A Do not stand on trusses until they are braced per BCSI & properly nailed to straps & hangers
oc,
14' 21'
2,_11.
2-11 1w
N
tl
b7
Ca
Ci
to
a7
m
m
o)
m
m
m
a1
rD
V
N
�I�
rltr7
(V
`N,
J2
iv
J2
J4
Co
J4
rA
J6
J6
GRID
A6
I
A4
I
A3
I I
A2
I
I I
Al
Al
I
Al04
I
",
I
v
Al
13'-72"
121 I IN .
Al
I
I
I
Al
I
I
(V
Al
Co
,
Al
I
I �
Al
A
A
S
A
W N O
A
Uj
aQ�
A
I" Lim
ca w Uj ii
�WU
Q Z
A
W U
w_
A
Z3Z
OIL
ZD
M
A
T SETBACK BOSTON HIP TRUSS
BH7
GRB rn
N
'
B
J3 �)h to ',y�j
J1 B
-r �9 toI7 7 > tol •'n'i
B
I
GRA
I I
rn
o JC o
JC to
------------------------ - ----�
-
CV
I I ,
CV
15' 10" 514" 2' 2" 9'-6" T-2"
' - 35'
GARAGE LEFT
kli l
21' 14'
2-4-1-
Its
to
call
m
m
to
m
m
m
s
�I
N
J2
N
J2
I
J4
J4
r
J6
JB
\d
tB
��
GRC ;
•
iz
All
I I
A3
I
I I
I
A2
I
I
Al
I
Al
I
I
Al
IN
13'-72
Al
121 ! -
I
I
I
Al
I
I
Al
I
Al
N
I
�
Al
Al
A
A
D
S
##
O
A
WNo
U3j
A
QQa
Lu —'(L
A
W U
az
wUv)
A
� 13 <
w-
Z3,
A
Z_
CIA
A
T SETBACK BOSTON HIP TRUSS
BH7
i - GRB
B J3
I
J9
B
M
7
B I 1
GRA !
I i
I
y
o JC to JIG,--
t— ------ ---- --_-. __---------_.—
!
I I ,
'
I I
)� ✓� — — — — — — — — + — — — — — — — — — — — — — — — — — — — — — — — — -4 — _
I I
-
4
" 5'-4"
35' Y
v
TilRilsFAR'�Nt1ieAAGF�: a uJN�sRimseee we be Metalled b:a¢tlwt of the Props* where hINETURNEp
.
'. we be m�h scieo Wew -
rRdchbUenolsetrOmoikykr raxortlet� wdh Crbl truss Plocenrard diagram loYouL
2 Ar dnremalons h tlds for dde ° Oes/W fmbakatlon of the Gtnese.
& thYai wrillen Liebe 165
vented by IM realeslp ed,
days' of delivery the rsrdarspr,ed agwro" ^bas Truss wkhY, ten (10j .
such wrRlet rlollce M hamrlalrod Chanlbsre Tngi firer h bbu��olwwed..M 1M event .
bm u�idaslp ' or to olhectrwsuraol' nt C°.hem6era�optlSn,- dap In vmkh
a =r b to reCNpt or'9cS! 1•t)r •urnnurr wel ny rF! 8 wrca
deWay. chrsnbea Truss Iw to •rosperal6ab to make ee Job else SuRable for
pdtlon file
Job sills tar deavwY CAernbers 7nw win bearesponsible�ria Wier for �a Job she of •
job �ro InntN dspys'" ems: A Grarrreert •rllYe Ilesdra .
QIll Is responsible to Chambers Trust;to
Prepared °r buyer is mt Prepared for deC,rep, or ku"".
a. Pike u atowrr kl Paragraph 7 below a mW 4e to sks arrdltlpw,
INt.leybuL A S60 Per flour Fels for rsvhlons su6Ject to gaups It arty chmges are made ki -
. T TNo & a PURCt•U1SE ORDwA to 01r bes�'1•nrgss o9 Do by Gbambe0nt Tnge, '
agreement a reasoriada prke. lnvdoe wlk M made on rbrvery and pelt da9edrm tams of r1106 or If ot 'iui deny. of Irwdes may. be made rat sdredubd date'bf d*.wy If buyer Cannot soce derwry d fehrkafed tresses. Tire taWenlgned sprees to Pay Chambera.TNa reesonabb attortrelh fee for WAOrdbna In owlm Or paynu,rd not Ilmlsly MAIJIL 1-12 %per month earpe
ataips ws be added ford sumo root peldw9Mtrr firms•
- a txTpnaWre or Wd!errywhma on acts sheet Qaadkdrs upraerrrent W ant lama rersln
91 n Tnas edemdlrp oredk 9or eYs m'sLe, ee rerdsral L .
Paynerd eduvr due of any and d
TurloorldillorVy entity reoelvtrp material and ells urrdealgrod�"aWesa to Pay such
rsawen _ e Mi?maYa false, 16610 & h Poymen a matarW be made br tla
crY0.prmen t nrarr d m �Kp" claxterning �a aarrl. the 4bme hanbfred hereunder- -
b• Saks UMWCotrny, Flc Ora Parg" agree eat the 40* venal for army such.Wpm Will
91. Wslpn rosparaldW» ors per'Natlonpl Sterdard And �AnamrendedCiuMetYes the RseoaWdrtles FwCwsm,dw.rmw,. er.,.,ay,.____ -
DATm
Sl(3NE0
FOR � 11RLE .
s
Multlple Ply busses must be fastened together per engineering
before they are set; fallum to do so can r ebult in roof collgiii".
Temporary and petmanellt bracing arm rerryilred and can save Ufa
and property and Is the r ' ponsltil of the trues ereetor.
Study the contanb of the Infe:mitlon packet Included on delivery
before setting trusses.
.7fllsim l6pivientirfulyadiiiiiiagix
Trusses trust be sat plumb and square
. •JfLDo notaet bunks or afack of piVm �d, roofing material or any ..
-i --Irma-L�LJ • _ __ _
uU'NUT SET 77?USSES USING THIS LAY®UT
• USE LAYOUT DELIVERED WITH TRUSSES TO SET TRUSSES
CHAMBERS TRUS'S INC _
3105 Oleander Avenue
Fort'Plerde; Florida 3488,2"6423
800-551-5934i! -
Fort Pierce 7724662012 Fax 77246&8711
Vero Eleach T72469-2012 Stuert '772-2863502 '
Ylts•ArchltocPs or Arahito
"""P drawinf,
big ehoak"approve! Is Nor, tative•s
The contract., floahafl r
for c of sea contractor.
oa or eonehu 'tion rr�emuremmnin tnsibs andse
reviewro! truss cove a general ro Architect's
1
ass strapping, and f shape'
structure from ravitY an loading on
their d up!ift load._
'cetive Ieent;ons- an
APProbed
Cdle:_ .
Braley
92.0/93.2 MITEK 4.2
�'racYcn A„•. ,--�_
DESIGN CRITERIA
County
SAINT• LUCIE
Building Department
ST LUCIE COUNTY
Wind Design Criteria
ASCE 7-2010
o
del
Wind Design Method
MWFRS/C-C hybrid Wind ASCE 7-10
Roofing Material
Metal Roof
c '
Loading in PSF
Roof R.D.L.
w
�I
Top Chord Live
20
E
w r
Top Chord Dead
7 4.2
d `
$A
Bottom Chord Live
10 Non -Concurrent -
-,)I
Bottom Chord Dead
10 3
R
TOTAL Load
37 7.2
la
Duration Factor
1.25
cc
Wind Speed
165mph
Top Chord C.B.
Sheeting by builder.
Bottom Chord C.B.
Sheeting by builder.
Highest Mean Height
12'-0"
Building Type
ENCLOSED
Building Category
II:Non Restrictive
Exposure Category
C
Barrier Island
No
Conforms to FBC 2017
of
zW
N
to
Q
GARAGE RIGHT
27 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Chambers Truss Inc. Drawing Name: M11324
Scale: 1 /4 = 1'
83 total trusses, 27 different trusses.
M14: SAE ACAD: SAE Reviewed By:
Date:07/19/12 Revised:03/21/18
FOR
WYNNE BUILDING CORP.
DESCRIPTION:
70' CARLTON, ELEV. D
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE
M11324
d Cord% Jhia
-75&30