Loading...
HomeMy WebLinkAboutTERMITE TREATMENT CERTIFICATEPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT#: jell -Oy66 JOB ADDRESS: Ow'� BUILDER/CONTRACTOR: �4 ( rwry-� PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: SCANNED Chemicals used: DOMINION 2L BY Percentage of solution: .05% Date of Treatment: 7 2,- 3 1 - 17 Footing Is' Treatment Re -Treat Driveway 1s* Treatment Re -Treat _�LOt er ,VkLG� 1 Treatment Re -Treat Total gallons used: / St Lucie County Time of Treatment: Slab 77 1'` Treatment Re -Treat Pools 1st Treatment Re -Treat e Perimeter for F al Inspection Signature of Extermi or Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104; 2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 31V�