MARINE CONSTRUCTION CHECKLIST
F
L[G3RZ�D
UNTYO R I Y1Tj
Marine construction includes, but is not limited to, new construction, repair, or expansion of seawalls, bulkheads,
revetments, riprap, docks, piers, wharfs, groins, and other marine structures including pile driving and dredging.
When you submit your building permit application for any type of marine construction, you should use the
following checklist to determine if your application submittal is complete. Only complete applications can be
accepted for processing. .SCANNED
BY
T
p
.p Goo
Building Permit
1
You must submit a completed building permit
Application
application, including all required information and
enclosed forms. The application must be signed and
notarized.
Notice of Commencement
1
A recorded Notice of Commencement for all
construction with a value exceeding $2,500 has to be
submitted at time of building permit application.
Construction Plans
2
All proposed construction must be accurately shown
(For commercial docks, 3
on the plans including but not limited to electrical
sets of plans and a CD for
wiring and plumbing. Plans must be signed and sealed
the Fire Dept will be
by a Florida registered engineer. Please contact our
Building Division at 772-462-1553 for more specific
required
construction information.
Army Corps of Engineers
2
When you submit the building permit application you
Permit or Exemption
must either have a permit or a permit exemption in
writing from the Army Corps of Engineers. For further
information please contact the Army Corps of
Engineers at 561-472-3528.
Florida Department of
2
When you submit the building permit application, you
Regulation (FDEP) Permit
must either have,a permit or a permit exemption in
or Exemption
writing from the FDEP. For further information, please
contact the FDEP at 772-398-2806 in Port St. Lucie,
or 561-681-6600 in West Palm Beach.
Subcontractor Summary
1 each
Electric and/or Plumbing (if applicable)
and Subcontractor
Agreement
RECEIVED
NOV 2 9 1'018
ST. Lucie county, Perottifig.
O
CO NT
Recorded Warranty Deed
1
If the property has been purchased within the last six
months, the property appraiser records may not be to
date. In this case we must see a recorded warranty
deed in your name to verify ownership of the property.
South Florida Water
2
If the proposed construction is along the C-23, C-24,
Management District
or C-25 Canals, you must present a permit or an
Permit or Exemption
exemption in writing from the South Florida Water
Management District (SFWMD). For further
information please contact SFWMD at 561-468-3989.
Owner Builder Affidavit
I
When the application is applied for under the
owner/builder provisions of Chapter 489.103(7), F.S.
the applicant for this building permit must personally
appear to sign the appropriate affidavit.
Vegetation Removal Permit
1
Applies to all residential properties and commercial or
industrial properties. When required, one completely
filled out vegetation removal application must be
submitted with the building permit application. Any
questions please contact Environmental Resource
Department at 772-462-2526.
NOTES
Additional information beyond the above check list may be required in order to ensure a complete review
of your building permit application.
All impact fees will have to be paid at the time of permit issuance.
You are required to call for all inspections as indicated on your building permit and for a final inspection.
If you have any questions, you are encouraged to ask our staff in Code Compliance. Please call 772-462-
1553 for further information.
SLCPDSD Revised 4/1212010