HomeMy WebLinkAboutFIELD - LABORATORY REPORTUES
ect
UNIVERSAL Dat Typed: "o Jan ary02, 201935
ENGINEERING SCIENCES
Consultants
eophy icalrc rvices-Mat ruin Tedng• EnvironmentI Silences �I LE COPY
i Geophysical Services •Materials Testing • Thresh old inspe4ion
Building Code Administration, Compliance Inspection 8, plan Review
820 Brevaid Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978 ,.
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340 `Q
West Palm Beach, FL 33401 C'gNfvF-
O
Project: Oakland Lake Subdivision Lot 2 St�I/C.ieY
5210 Oakland Lake Circle, Fort Pierce, St Lucie County, FL a
As requested, Universal Engineering Sciences, Inc. (UES) representaves) performed construction materials testi County tiand/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No. I Data I Type of Report
104854;1 1 12/2812018 In -Place Density Test Report wlActivity Record
We hopethis information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
Sincerely,
Universal Engineering Sciences, Inc.
,S�,tlltlflft: r, fr Certificate of Authorization No. 00000549
E..yri �Fiy Richard E.
C•
••��cENSF•=4G�;
Hoaglin P.E.
iVO.48796 •� ^ 2019.01.03
15:15:38
'• :STATE OF ' Jr�-05'00'
O'�. •:�ORA7A . ���
JAN 2 2 2019 til14U1>> Richard E. Hoaglin, P.E.
Per mjttin FLORIDA
g L)e Professional Engineer No. 48796
St. Lucie Partrnent
County, FL This item has been eledranicallysignedandsealedby
Richard E. Hoaglin, P.E. using a Digital Signature. Printed
copies ofthis document are not consiolered signed and
seatedand the signature must be verified on any electronic
copies.
ICC Email:cbugg@jnvrinc.com; eiibdht@nvdno.com: Imhoff, Bryan [BIMHOFF@nvrinc.com); jomcalll@mvinc.com; rcfingar@rrvdnQWm; stgNseal MAIL to
ryan homes at 1777 Wiilows Square, Vero Beach, FL 32966
1' ..T
1g//-6S
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering s Environmental Sciences
Geophysical Services o Materials Testing , Threshold Inspection
Building Code Administration, Compliance Inspecdon & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F:
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
UES Project No: 0310.1700251.0036
UES DOCS No:
UES Report No: 104854-1 ARC 122818
On -Site Time (hrs): 1.00
Lab Time (hrs): 0.00
Travel Time (hrs): 0.60
Total Time (hrs): 1.50
Project, Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Date of�Activity: Friday, 28 December, 2018
Technician: Cliff Cherrnay
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Gectechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing •Threshold Inspection
Building Code Administration, Compliance inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
In -Place Density Test Repo
UES Project No: 0310.1700251.0035
UES DOCS No:
UES Report No: 104854-1 DT 122818
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Area Telsted: House pad
Type ofiTest: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 12/28/2018
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Chermay
Requirements: 96% of Proctor maximum dry density. These tests apply to the fill and/or surflcial soil conditions
only and do not address the condition of the underlying soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
NIT test
0-1 it
12.00
21180
109.7
11.6
98
A
2
N/E test
0-1 ft
1200
21180
110.2
12.1
98
A
3
WE test
0-1 ft
12.00
21180
110.5
12.5
99
A
4
SM test
0-1 ft
12.00
21180
1 110.0
1 11.7
98
A
(1) Ref. Datum: 0 = Top of Final Grade
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
21180
112.0
11.0
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Reoompaction required
E. Recompacted, Retested, Meets Requirements
This fed! was penbrmed without deviation from ASTM procedures.
this report shall not be reproduced, except in full, without MewMen approval of UnIvetsal Engineering sciences.
U N I nILIAL
ENGINEE L�..i SCIENCES
Consultants In: Geotechnial Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
Avenue, Rockledge, FL 32955 -P: 321.638.0808 -F: 321.638.(
Construction Materials Testing
L ES Project No.: 0310.1700251.0035
e d: January 02, 2019
FI0 eB 2��3 Ply
8
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (LIES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No. Date I Type of Report
104854-1 12/28/2018 1 In -Place Density Test Report w/Activity Record
vve nape inls Inrormatlon Is sutriclent tor your Immediate needs. It you have any questions, please do not hesitate to contact
the undersigned.
Sincerely, ,'
Universal Engineer"inb,Sciences, Inc.
C rtifcate cif Authorization No. 00000549
Richard E. Hoaglin, P.E.
FLORIDA
_ Professional Engineer No. 48796
This item has been electronically signed and sealed by
Richard E. Hoaglin, P.E. using a Digital Signature. Printed
copies of this document are not considered signed and
sealed and the signature must be verified on any electronic
copies.
[CC Email: cbugg@nvdnc.com; elibrihi@nvrinc.com; Imhoff, Bryan [BIMHOFF@mmnc.com]; jomcalli@nvrinc.com; rofingar@nvdnc.com; sign/seal MAIL to
ryan homes ;at 1777 Willows Square, Vero Beach, FL 32966
UNIV'-'N- 1 :w I L
UES ^--'ie o: 0310.1700251.0035
LIES
UES rcepo o. 104854-1 ARC 122818
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing • Threshold Inspection
Building Code Administration, Compliance Inspection& Plan Review
On -Site Time (hrs):1.00
Lab Time (hrs): 0.00
Travel Time (hrs): 0.50
Total Time (hrs): 1.50
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Date of Activity: Friday, 28 December, 2018
Technician: Cliff Cherrnay
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork;testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 95% of the maximum dry density per ASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
u N tv-"0. MAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • Materials Testing- ThresholdInspection
Building Code Mministration, Compliance Inspection & Plan Review
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
l� I Ict No:
l� I 5 No:
UES Report No:
In -Place Density Test Report
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Area Tested: House pad
0310.1700251.0035
104854-1 DT 122818
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 12/28/2018
Lab: ASTM D1557 Modified Proctor
Technician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underivinq soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(inch)
Proctor
(2)
Field Dry
Density
(PCF)
Field
Moisture
%
%
Compaction
Comments
(3)
1
N/Witest
0-1 ft
12.00
21180
109.7
11.6
98
A
2
ME test
0-1 ft
12.00
21180
110.2
12.1
98
A
3
S/E hest
0-1 ft
12.00
21180
110.5
12.5
99
A
4
S/W ; test
0-1 ft
12.00
21180
110.0
11.7
98
A
(1) Ref.' Datum: 0 = Top of Final Grade
(2)
Maximum
Optimum
Proctor
Dry
Moisture
#
Density
Content
21180
112.0
11.0
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
This test was performed without deviation from ASTM procedures.
i
This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences.
UES
310.1700200
UNIVERSAL Date Typed: No.: January 02, 201935
ENGINEERING SCIENCES
Consultants Inc Geotechnical Engineering • Environmental Sciences
! Geophysical Services• Materials Testing • Threshold Inspection
Bulldog CodeAdmin"istration, Compliance Inspection & Plan Review
820 B?evard Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978
Construction Materials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (UES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or Inspection observations are reported on the attached
sheets. The contents of this package are summarized below;
Scope of Work
Work Ober No. Data Type of Report
104854-1 12/28/2018 In -Place Density Test Report w/Activity Record
We hope this information is sufficient for your Immediate needs. If you have any questions, please do not hesitate to contact
the uridersioned.
G�•' �,ticE,vsF •qc
No
48796 ;
STATE OF ; i
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of Authorization No. 00000549
Richard E.
Hoaglin, P.E.
2019.01.03
15:15:38
-05'00'
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
This item has been electronicaSysigned and sealed by
Wchard E. Hoaglin, AE using a Digital Signature. Printed
copies of able document are not considered signed and
sealed and the signature must be verified on any electronic
copies.
ICC Enlag: cbugg@nvrino.eom; eribrihi@rrvrinu.wm; Imhoff, Bryan IBIMHOFF@nvrinawm]; lomcalli@nwinamm; roflngar@nvrinc.wm; signiseal MAIL to
ryan hdmes at 1777 Willows Square, Vero Beach, FL 32966
RECEIVE®
JAN 0 9 2019
Permitting Department
5t. Lucie County, FL
f �,—.T /S//—b. 3
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering - Environmental Sciences
Geophysical Services , Materials Testing s Threshold Inspection
Building Code Administration, Compliance Inspection &Plan Review
UES Project No: 0310.1700251.0035
UES DOCS No:
UES Report No: 104854-1 ARC 122818
On -Site Time (his): 1.00
Lab Time (hrs): 0.00
Travel Time (hrs): 0.50
Total Time (hrs): 1.60
820 Brevard Avenue. Rockledne. FL 32966 - P: 321.638.0808 - R 321.638.0978
Activity Record
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Date of Activity: Friday, 28 December, 2018
Cliff
As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of
earthwork testing for the House pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4 density teSt(s) for House
pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the
project compaction requirements of 950/6 of the mabmum dry density perASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
1'� j /8h :P5to3
82D
UNIVERSAL
ENGINEERING SCIENCES
Consultants In: Geotechnical Engineering • Environmental Sciences
Geophysical Services • MaterialsTesting • Threshold Inspection
Building Code Administration, Compliance Inspection & Plan Review
Avenue, Rockledge, FL 32955 - P: 321.638.0808 - F: 321.638.0978
UES Project No: 0310.1700251.0035
UES DOCS No:
UES Report No: 104854-1 DT 122818
In -Place Density Test Report
Clienit: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 2
5210 Oakland Lake Circle, Fort Pierce, St. Lucie County, FL
Areal Tested: House pad
Type
of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 12/2812018
Lab: ASTM D1557 Modified Proctor
TechInician: Cliff Cherrnay
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlvinq soils below the tested depths.
Test
No.
Location of Test
Range
Depth
(Inch)
Proctor
(2)
Field Dry
Density
(PCFy
Field
Moisture
%
%
Compaction
Comments
(3)
1
N/W test
0-1 ft
12.00
21180
109.7
11.6
98
A
2
N/E test
0-1 it
12.00
21180
110.2
12.1
98
A
3
S/E test
0-1 it
12.OD
211BO
110.5
12.5
99
A
4
SNV test
0-1 ft
12.00
1 21180
1 110.0
1 11.7
98
A
(1)
I Ref. Datum: 0 = Top of Final Grade
(2)
Proctor
#
Maximum
Dry
Density
Optimum
Moisture
Content
21180
112.0
11.0
without deviation from ASTM procedures.
(3) Comments Key
A. Compaction meets min. requirements
B. Compaction does not meet min. requirements
C. Moisture does not meet requirements
D. Recompaction required
E. Recompacted, Retested, Meets Requirements
reproduced, except to full, without the wdtten approval of Universal Engineering Sciences.