HomeMy WebLinkAboutMISC LETTERLydia Galbraith Zoning review comments. So �S _�ersex.- ''e l-llPrec fZ
Peltee l3/S-N3'000/�D/o%7 s�Lur;tLo, �wNei�d+.//r�r✓.6�i�M.GoedNPri�ieN�yr41�
1, is the existingwell -on the property going g to e u
p p y going to be used for single-family
residence?
Yes, the existing well will be used for single-family resideng&'.
q
2� based on the St. Lucie county
land development code chaolklo ,
7.06.02 (A) and ITE parking manual, The property is required to provide
two paved parking spaces of each 10' x 18'.
The parking spaces may be at theXa'�ed driveway. Please indicate the
parking spaces and the type of
Added to two copies A18't
spaces measuring 20' x
3,_based on St. Lucie County
floor elevation is required to
adjacent road or the height E
is higher. ices bove i
The finish floor
surveys . this is ap
on the survey.
clouded in red are two parking
has been c
the pole barn.
r 7.04.01 C, proposed finish
above centerline of the
the septic/drainfield which ever
is 23.3 feet.
to 23.3 feet,
oad clouded in red on two copies of the
y 40 inches higher than Septic drain field.
Lydia, thank you for your comments, hopefully I have addressed each
one properly, if not please let me know, sincerely Dwight.
JAN 31 Z019
ST. Lucie co ty
From: Joseph Fersch FerschJ@stiucieco.org
Subject: Review comment for permit #1812-0023
Date: Dec 12, 2018 at 1:11:46 PM
To: mgoodner491@yahoo.com
Anew policy will be implemented on July lst 2017 with respect to the plan review process in an
effort to improve turnaround time on permits. The following will be required with each resubmittal.
a. A cover letter that includes a response to each comment made by the plans examiner.
b. All changes to a plan shall be "clouded" on the plans.
c. The applicant or agent is responsible for inserting/changing out of new plan pages upon
resubmittal or if the applicant or agent prefers they can resubmit a complete set of new
plans with the changes included.
Dear St. Lucie County Permit Applicant,
Thank you for choosing to build your home and invest in St Lucie County. St Lucie County is
committed to assisting you navigate the Building review process. Please know that County staff is
committed to customer service and part of that service is providing assistance and guidance with our
processes. Please do not hesitate to contact us to further discuss your building project as needed.
Please see the attached plan review comments which have been generated for your permit. As soon
as we receive the modified plans and any additional required documentation back from the design
professional, contractor or owner we will perform the additional reviews as necessary in order to
complete the plan review process. Once the plans have been signed, by all applicable plan reviewers,
we will move the permit forward either to the Fire Department or back to permitting for permit
issuance.
How was your service?
Please contact, Carl Peterson, Building Official at petersonistlucieco.org to share your experience.
Joseph W Fersch
! Joseph WFersch RECEIVED
Plans Fxaminer
St Lucie County JAN 31 2019
Code Compliance Div.
FST.cie a ay, Pert