Loading...
HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONI �l Dom Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax M462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: S`';I'l I Permit#: tt�e VEO MAV 3 01A19 SCB V rm1W"9 e Cou ttl nt tQt,6`e CD �nfy Let#: Cpl Contrectir. � .tip Address: Construction: o Post Construction Test ❑ Rough4n Test Test Conditions: Date: S a4 Floor Area (ft2): I �I'1 s,> Time: deh Primary Location of Supply Ductwork AJ-T-tL Indoor Temperature (F): ( Primary Location of Return Ductwork r �G Outdoor Temperature (F): Total Leakage Test (Outside) � Duct Leakage: o Default ❑ Prop. Leak Free dProposed On = Test Pressure: (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (dim) Results: o Pass ❑ Fail Installed Pa P'5 G3 O Total Leakage (dm): Total Leakage per 100 sgft: ko• 019 CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sgfL Testing Comoanv 111' Company Name:ISl.:o1(•ki-)p,.hcts Address:-�ie�E2rWe-My I hereby certify that the above Duc Sealing Leakage results demonstrate compliance with 5' Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: IIW 11 11 Printed Name: lll�h LicenselCertfcate#: