HomeMy WebLinkAboutENERGY EFFICIENCY CODEFlorida Energy Efficiency Code For Building Construction
Florida Department of Community Affairs
EnergyGauge F1aCom v 2.11 FORM 40OA-2004
Whole Building Performance Method for Commercial Buildings
Jurisdiction: ST LUCIE COUNTY, ST LUCIE COUNTY, FL (661000)
Short Desc: FSCP
Owner: FIRST SOURCE COMMERCE PARK
Address: SOUTHKINGSHWY
ST LUCIE
City: ST LUCIE
State: FL
Zip: 0
Project: FIRST SOURCE COMMERCE PARK
A-103
SoNweD
PermitNo: 0 Sti• gGoU� 8
Storeys: 1
Type: Office *Conditioned Area: 482 • denotestiglAcd are .
Class: Renovation to existing building *Coed + UnCond Area: 482 Does not include wall
aoseclion areas
Max Tonnage: 2.0 (if different, write in)
Component
'Gross Energy Use
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
Compliance Summary
Design Criteria Result
540.77 566.28 PASSES
PASSES
None Entered
PASSES
None Entered
WATER HEATING SYSTEMS None Entered
PIPING SYSTEMS None Entered
,Met all required compliance from Check List? FILE COPY Yes/No/NA
IMPORTANT NOTE: An input report Print -Out from EnergyGauge Com of
this design building must be submitted along with this Compliance Report
3/1/06
EnergyGauge FlaCom v 2.11 FORM 40OA-2004
1
u
I hereby certify that the plans and
specifications covered by this calculation
are in compliance with the Florida Energy
Efficiency Code.
PREPARED BY: j 1� �tcffr%b�71/
DATE: 3.07• o(o
I hereby certify that this building Is in compliance
with the Florida Energy Efficiency Code
rCIT75-5i
DATE:
Review of the plans and specifications covered by this
calculation indicates compliance with the Florida Energy
Code. Before construction is completed, this building will be
Inspected for compliance in accordance with Section
553.908, F.S.
BUILDING OFFICIAL:
DATE:
If required by Florida law, I hereby certify (•) that the system design is in
compliance with the Florida Energy Code.
ARCHITECT: dgC�j 9��fS r�tizrr� '
ELECTRICAL SYSTEM DESIGNER
LIGHTING SYSTEM DESIGNER:
MECHANICAL SYSTEM DESIGNER: -
PLUMBING SYSTEM DESIGNER
REGISTRATION
No.
(•} Signature is required where Florida Law requires design to be performed by registered design professlonals.
Typed names and registration numbers may be used where all relevant Information Is contained on signed/sealed
plans.
r
03/0�/06
2/28/06 - EnergyGauge FlaCom v 2.11 FORM 400A-2004 2
Project: FSCP'
Title: FIRST SOURCE COMMERCE PARK A-103
Type: Office
(WEA File: DAYTONABEACELTMY)
Whole Building Compliance
Design
Reference
Total
95.12
100.00
$540.77
$566.28
ELECTRICITY(MBtulkWhl$
95.12
100.00
10,837.00
11,417.00
$540.77
$566.28
AREA LIGHTS
16.20
14.14
1,838.00
1,624.00
$91.72
$80.55
MISC EQUIPMT
9.25
9.25
1,059.00
1,059.00
$52.84
$52.53
PUMPS & MISC
0.26
0.26
32.00
31.00
$1.60
$1.54
SPACE COOL
20.31
21.08
2,302.00
2,395.00
$114.87
$118.79
VENT FANS
49.10
55.27
5,606.00
6,308.00
$279.74
$312.88
Credits & Penalties (if any): Modified Points: = 95.12
PASSES
External Lighting Compliance
Description Category Allowance Area or Length ELPA CLP
(W/IInit) or No. of Units (W) (W)
(Sgft or ft)
None
3/1U06 EnergyGauge FlaCom v 2.11 FORM 40OA-2004
Project: FSCP
Title: FIRST SOURCE COMMERCE PARK A-103
Type: Office
(WEA File: DAYTONABEACILTMY)
Lighting Controls Compliance
Acronym Ashrae Description Area No. of Design Min Compli-
ID (sq.ft) Tasks CP CP ance
'Pt07o1Sp1 16 Office -Open Plan 482 2 6 1 PASSES
PASSES
Project: FSCP
Title: FIRST SOURCE COMMERCE PARK A-103
Type: Office
(WEA File: DAYTONABEACETMY)
System Report Compliance
PrOSyl System 1 Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr 1
Component Category Capacity Design Eff Design IPLV Comp-
Eff Criteria IPLV Criteria fiance
Cooling System Air Cooled < 65000 BuA 10.30 10.00 10.00 PASSES
Cooling Capacity
Air Handling Air Handler (Supply) - 0.80 0.90 PASSES
System -Supply Constant Volume
PASSES
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV lance
None
311106 EnergyGauge FlaCom v 2.11 FORM 40OA-2004
Water Heater Compliance
Description Design Min Design Max Comp
P Type Category Eff Eff Loss Loss Hance
None
Piping System
Category Pipe Dia b Operating Ins Cond Ins Req Ins
[inches] Runoat? Temp ,[Btu-in/hr Thick [in] Thick [in]
IF] SF.F1
:t: FSCP
FIRST SOURCE COMMERCE PARK A-103
Office
File: DAYTONABEACH.TMY)
Other Required Compliance
Category
Section
Requirement (write N/A in boa if not applicable)
Check
I Infiltration
406.1
Infiltration Criteria have been met
�ystem
407.1
HVAC Load sizing has been performed
entilation
409.1
Ventilation criteria have been met
ADS
410.1
Duct sizing and Design have been performed
T & B
410.1
Testing and Balancing will be performed
Motors
414.1
Motor efficiency criteria have been met
Lighting
415.1
Lighting criteria have been met
O & M
102.1
Operation/maintenance manual will be provided to owner
Roof/Ceil
404.1
R-19 for Roof Deck with supply plenums beneath it
13
Report
101
Input Report Print -Out from EnergyGauge FlaCom attached?
3/l/06
EnergyGange FlaCom v 2.11 FORM 40OA-2004 1 5
EnergyGauge F1aCom v 2.11
IWUT DATA REPOR
Proiect Information
Project Name: FSCP Orientation: North
Project Title: FIRST SOURCE COMMERCE PARK A-103 Building Type: Office
Address: SOUTH KINGS HWY Building Classification: Renovation to existing building
ST LUCIE
State: FL No.of Storeys: 1
Zip: 0 GrossArea: 482
Owner. FIRST SOURCE COMMERCE PA
Zones
No Acronym Description Type
Area
[sf]
Multiplier
Total Area
[8f]
1 PrOZol Zone 1 CONDITIONED
482.0
1
482.0
Spaces
No Acronym Description Type Depth
Width Height Multi
— peer—
TotalArea
[ilI
Total Volume
3/1/06 EnergyGauge FlaCom v 2.11 1
In Zone: PrOZol
1 PrOZo1SD1 Zo0Sp1
Office -Open Plan
24.10
20.00
9.00
1
482.0
4338.0 El
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[W]
Ctri pts
In Zone: PrOZol
In Space: PrOZo1Sp1
1 Compact Fluorescent General Lighting
1
600
600
Manual
On/Off
6
Walls
No Description
Type Width H (Effec) Multi
Area DirectionConductance
Heat
Dens R-Value
[ft]
[ft] plier
[st]
[Btu/trr. sf. F]
Capacity
[lb/cf] [b sf.FBtu]
[Btu/sf.]F]
In Zone: PrOZol.
1 PrOZo1Wa3
5/8" stucco 1.00
9.00 1
9.0
North
0.2067
5.7314
34.65 4.84 ❑
/8"CMU/3/4"ISO
BTWN24"od.5"
GYP
2 Pr0Zo1Wa4
5/8" stucco 1.00
9.00 1
9.0
South
0.2067
5.7314
34.65 4.84
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
3 Pr0Zo1Wa5
51811stucco 15.00
10.00 1
150.0
East
0.2067
5.7314
34.65 4.84 0
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
4 Pr0Zo1Wa6
0.5 Ply/35/8" Mtl 1.50
10.00 1
15.0
North
0.0798
0.5388
7.98 12.54
std@24"oc/RI l/0.5"
GYP
5 PrOZolWa7
0.5 Ply/35/8" Mtl 1.50
10.00 1
15.0
South
0.0798
0.5388
7.98 12.54
std@24"oc/Rl1/0.5"
GYP
-
-
3/1/06 Ener gyGauge MaCom v 2.11 2
6 Pi0Zo1Wa8 0.5 Ply/35/8" Mtl
s[d@24"oc/Rl l/0.5"
GYP
15.30 10.00 1
153.0
East 0.0798 0.5388 7.98 12.54
❑
Windows
No Description Type
Shaded U SHG
[Btu/hr sf F]
VmTr
W H (Effec) Multi Total Area
[ft] [ft] plier [sq]
In Zone: PrOZol
In Wall PrOZo1Wa5
1 PtOZo1Wa5Wi1 SINGLEREFB No 0.8785 0.23
TINT-L
0.05
8.66 9.00 1 77.9
Doors
No Description Type
Shaded? Width H (Effec) Multi
[ft] [ft] plier
Area
[sf]
Cond. Dens. Heat Cap. R Value
[Btulhr. sf. F] pb/cf] [Btu/sf. F] [h.sf.F/Btu]
In Zone:
In wall
Roofs
No Description Type
Width H (Effee) Multi
[ft] [ft] plier
Area
[sf]
Tilt
[deg]
Cond. Heat Cap Dens. R Value
[Btu/hr. Sf. F] [Btu/sf. F] Rb/cf] @.sf.F/Btu]
,In Zone: PtOZol
1 PcOZo1Rf1 Sngl Ply/2"Iso/2"
Conc/Mtl Deck
20.00 24.10 1
482.0
0.00
0.1372 4.74 71.00 7.29
❑
Skylights
No Description Type
—
U SHGC Vis.Tran
[Btu/hr sf Iq
W
[ftl
H (Effec) Multiplier Area Total Area
[rtl [sn [Sfl
3/1106 EnergyGauge FlaCom v 2.11
In Zone:
In Roof:
Floors
No Description Type Width
Ift1
H (Effec) Multi
Ift] plier
Area Cond. Heat Cap. Dens. R-Value
[sf1 [Btu/hr. sf. F1 [Btu/sf. F1 pbkll [L.sf.F/Btul
To Zone: ProZol
1 Pr0Zo1F11 Concrete floor, 20.00
carpet and rubber
pad
24.10 1
482.0 0.5987 9.33 140.00 1.67
❑
Systems
Pr 0Syl System 1
Constant Volume Air Cooled Split No. Of Units 1
System < 65000 Btu/hr
Component Category
Capacity
Efficiency D'LV
1 Cooling System (Air Cooled < 65000 Btu/h Cooling
Capacity)
2 Air Handling System -Supply (Air Handler (Supply) -
Constant Volmne)
23600.00
800:00
10.30 10.00
0.80
❑
❑
Plant
Equipment Category
Size
Inst.No Ell. IPLV
Water Heaters
W-Heater Description Capacit Cap.Unit
UP Rt.
Efficienc Loss
3/1/06 EnergyGauge FlaCom v 2.11 4
Ext-Lighting
Description Category
No. of Watts per Area/Len/No. of units
Luminaires Luminaire [sVft/No]
Control Type
Wattage
[W]
Piping
No Type
Operating - Insulation
Temperature Conductivity
[Fj [ Btu-in/h.sf.F]
Nomonal pipe
Diameter
[in]
Insulation
Thickness
[in]
Is Runout?
Fenestration Used
Name
Glass Type No. of
Panes
Glass SHGC VLT
Conductance
[Btu/Lsf.F]
ApLbWnd4
SINGLE REF B 1
TINT-L
0.8785 0.2270 0.0500
❑
Materials Used
Mat No Acronym
Description
Only R-Value RValue Thickness
Used [h.sf.F/Btu] [ft]
Conductivity
[Btu1hft.F]
Density
[Ib/cf]
SpecificHea
t
7 NW187
1158
1 Mat1151
Mat1178
GYP OR PLAS
BOARD,1/2IN
CONC HW, DRD, 140LB,
CARPET W/RUBBER PAD
No 0.4533 0.0417
No 0.4403 0.3333
Yes 1.2300
0.0920
0.7570
50.00
140.00
0.2000
0.20004n-
❑
❑
311106 EnerRyGauge FlaCom v 2.11
268
Mat1268
0.625" stucco No
0.1302 0.0521
0.4000
16.00
0.2000
❑
42
Matl42
8 in. Lightweight concrete No
2.0212 0.6670
0.3300
38.00
0.2000
❑
block
269
Mat1269
.75" ISO BTWN24" oc No
2.2321 0.0625
0.0280
4.19
0.3000
❑
211
Maf1211
POLYSTYRENE,EXP.,1/21 No
2.0850 0.0417
0.0200
1.80
0.2900
❑
N,
12
Mat112
3 in. Insulation No
10.0000 0.2500
0.0250
2.00
0.2000
❑
82
Matl82
ASPHALT -SHINGLE AND Yes
0.4400
❑
SIDING
11
Maui 1
2 in. Insulation No
6.6800 0.1670
0.0250
2.00
0.2000
❑
47
Matl47
2 in. Heavyweight concrete No
0.1670 0.1670
1.0000
140.00
0.2000
❑
Constructs Used
No
Name
Simple
Massless Conductance
Heat Capacity
Density
RValue
Construct
Construct [Btu/h.sf.F]
[Btu/sf F]
pb/cf]
[h.sf.FBtu]
1004
Concrete floor, carpet and ribber pad No
No 0.60
9.33
140.00
1.6703
❑
Layer
Material Material
Thickness Framing
No.
[ft]
Factor
1
151 CONC HW, DRD, 1401B, 4IN
0.3333
0.00
❑
2
178 CARPET W/RUBBER PAD
0.00
❑
No
Name
Simple
Massless Conductance
Heat Capacity
Density
RValue
Construct
Construct [Btu/h.sf.F]
[Btu/sf.F]
[lb/cf]
[h.sf.FBtu]
1011
5/8" stucco /8"CMU/3/4"ISO No
No 0.21
5.73
34.65
4.8368
❑
BTWN24"oc/.5"
Gyp _
Layer
Material Material
Thickness Framing
No.
[ft]
Factor
1
268 0.625" stucco
0.0521
0.00
❑
2
42 8 in. Lightweight concrete block
0.6670
0.00
❑
3
269 .75" ISO BTWN24" oc
0.0625
0.00
❑
4
187 GYP OR PLAS BOARD,1/2IN
0.0417
0.00
❑
311106 EnergyGauge FlaCom v 2.11
No
Name
Simple
Construct
Massless Conductance
Construct (Rtu/b.sf.F]
Heat Capacity
[Btu/sf.F]
Density
Rb/cf]
RValue
@.sf.F/Stu]
1015
0.5 Ply/35/8" Mtl std@24"oc/Rll/0.5" Gyp No
No 0.08
0.54
7.98
12.5383
❑
Layer
Material
No.
Material
Thickness Framing
[ft] Factor
1
211
POLYSTYRENE,EXP.,1/2IN,
0.0417
0.00
❑
2
12
3 in. Insulation
0.2500
0.00
❑
3
187
GYPORPLASBOARD,1/2IN
0.0417
0.00
❑
No
Name
Simple
Construct
Massless Conductance
Construct [Btu/h.sf.F]
Heat Capacity
[Btu/sf.F]
Density
Pb/cf]
RValue
[h.sf.F/Btu]
1043
Sngl Ply/2"Iso/2"
Conc/Mtl Deck No
No 0.14
4.74
71.00
7.2870
❑
Layer
Material
Material
Thickness Framing
No.
[ft]
Factor
1
82
ASPHALT -SHINGLE AND SIDING
0.00
❑
2
11
2 in. Insulation
0.1670
0.00
❑
3
47
2 in. Heavyweight concrete
0.1670
0.00
❑
311/06 EnergyGauge F1aCom v 2.11 7
SIN RNW20913 RIGHT-NCOMMERCIAL / INDUSTRIAL LOAD CALCULATION
2/27/06
For: FIRST SOURCE COM4ERCE PARK (#A-103)
Zone: 1
Job#: BLD A UNIT A-103 S KINGS HWY ST LUCIE
City: Fort Pierce, FL, US
By: ABBOTT & ASSOCIATES
LWH: 482.0 x 1.0 x 9.0
Units: U.S. customary (I-P)
1. DESIGN CONDITIONS - COOLING ( 3 PM , August )
Dry Bib RH Moisture
Outdoor Conditions ---> 90 59
bidoorConditions -> 75 50
TOD Convection - 0
Difference 15 61
Range Wet BIb
15 78
63
2. GLAZING SOLAR HEAT GAIN
( Lot =
27..00
ON, Copst Wt = L
Type Du Shad Tilt
O/oovr Area
Sfact
Shgf Shad
GLAZ 1 E N 90
100.0 78
0.69
64 1.0
Page: 1
Mult = 1.0 ) -
Sens
1668
3. TRANSMISSION GAINS
Type
D r
GrArea
NtArea
Uval
Grp
CLTD
Shad
Clr
Sens
GLAZ
1
E
78
78
1.040
15.0
N
-
1217
WALL
1
N
24
24
0.122
D
12.5
N
D
37
WALL
1
S
24
24
0.122
D
20.5
N
D
60
WALL
1
E
72
72
0.122
D
33.5
N
D
294
WALL
2
N
15
15
0.082
D
12.5
N
D
15
WALL
2
S
15
15
0.082
D
20.5
N
D
25
WALL
2
E
153
153
0.082
D
33.5
N
D
420
PART
1
-
221
221
0.087
15.0
-
D
288
ROOF
1
-
482
482
0.040
24.0
-
D
463
4. INTERNAL BEAT GAIN
Sens
Latent
People
4 x Per person: sensible
190
latent
230
760
920
0 x Per person: sensible
300
latent
300
0
0
Lights
Incandescents in RA Ceiling
0
x 3.4 x
60%
0
Fluorescents in RA Ceiling
0
x 4.1 x
60%
0
Incandescents other
0
x 3.4 x
100%
0
Fluorescents other
600
x 4.1 x
100%
2460
Motors
Nmbr Power Gain
Load Fact
Usage
I
1 0.00
0
1.00
1.00
0
2
1 0.00
0
1.00
1.00
0
3
1 0.00
0
1.00
1.00
0
Appl.
Nmbr Type Sens
Latent
Usage
1
1 ALL 2800
800
1.00
2800
800
2
1
0
0
1.00
0
0
3
1
0
0
1.00
0
0
4
1
0
0
1.00
0
0
5
1
0
0
1.00
0
0
Other
1
0
0
1.00
0
0
5. INFILTRATION
Sens
Latent
0 cfm > x db Temp Diff
15. 0
x 1.1
0
> x Moist. Diff
61.5
x 0.68
0
Manual N: 4th Edition Right-N: Ver.3.0.01
Certified by ACCA to meet all requirements of Manual Form N
Job S: BLD A UNIT A-103 S KINGS HWY ST LUCIE
Page: 2
6. SUBTOTAL COOLING LOAD FOR SPACE
10508
1720
7. SUPPLY DUCT HEAT GAIN
Gain factor 0.10 ' x Line 6 Sensible Gain
1051
8.
COOLING FAN SIZING
Sum of Duct Gain (7 ), Line (6) & Drawtbru Fan
=
11559
(L S Sens. ) / ( 1.1 x Supply ID ) =
cfm
Est Cooling cfm = ( 11559) / (1.1 x 20.0
) =
526
Actual Cooling Fan >
=
526
9.
I
VENTILATION
80 cfm x db Temp Diff 15.0
x 1.1
1319
-> x Moist. Diff 61.5
x 0.68
3345
10. iRETURN AIR LOAD FROM LIGHTING AND ROOF
Incandescent Lights 0 Watts
x 3.4
x 40% 0
Fluorescent Lights 0
x 4.1
x 40% 0
RA Roof Load from Line 3
M 0
RA Ceiling Load Credit from Line 3
(-) 0
11. RETURN DUCT HEAT GAIN
Gain factor 0.00 x Line 6 Sensible Gain
0
12. TOTAL COOLING LOADS ON EQUIPMENT(Btah)
12878
5065
SPACE HEATING LOAD CALCULATION
13. HEATING DESIGN TEMPERATURE
Heating TD = (Inside DB -Outside DB) _ (
70 - 42) = 28
14. ,TRANSMISSION LOSSES
[ Mult =
1.0 ] -
Type Expos GrAtea NetArea Uval
HTD
Loss
GLAZ 1 E 78 78 1.100
28.0
2402
WALL 1 N 24 24 0.122
28.0
82
WALL 1 S 24 24 0.122
28.0
82
WALL 1 E 72 72 0.122
28.0
246
WALL 2 N 15 15 0.082
28.0
34
WALL 2 S 15 15 0.082
28.0
34
WALL 2 E 153 153 0.082
28.0
351
PART 1 - 221 221 0.087
28.0
538
ROOF 1 - 462 482 0.040
15.0
289
15, 1NFt1 TRATION
0 cfm x db Temp Diff 28.0 x 1.1
Loss
0
16. SUBTOTAL HEATING LOAD FOR SPACE
4060
17. SUPPLY DUCT HEAT LOSS
Loss factor 0.05 x Line 16 Loss
203
18. VENTILATION
80 cfm x dbTemp Diff 28.0 x 1.1
2462
Manual N: 4th Edition Right-N: Ver.3.0.01
Certified by ACCA to meet all requirements of Manual Fort N
Job#: BLD A UNIT A-103 S KINGS HWY ST LUCIE
Page: 3
19. HUMIDlnCATION
Inside RH desired 32.0 (Max = 32.0 for I pane )
N of Glazing panes 1.0 (Max = 52. 0 for 2 pane )
80 cfm x 1.48 g/100cfm/d = 1.2 gpd 434
20. iRETURN DUCT 13EAT LOSS
Loss faeter 0.00 x Line 16 Loss 0
21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 17159
Manual N: 4th Edition Right N: Ver.3.0.01
Certified by ACCA to meet all requirements of Manual Form N